Bill Text: NY A04633 | 2019-2020 | General Assembly | Introduced
Bill Title: Enacts the New York Sun Act of 2019; establishes a solar energy incentive and financing program.
Spectrum: Moderate Partisan Bill (Democrat 38-5)
Status: (Introduced - Dead) 2020-01-08 - referred to energy [A04633 Detail]
Download: New_York-2019-A04633-Introduced.html
STATE OF NEW YORK ________________________________________________________________________ 4633 2019-2020 Regular Sessions IN ASSEMBLY February 4, 2019 ___________ Introduced by M. of A. ENGLEBRIGHT, HEVESI, ABINANTI, OTIS, LIFTON, THIELE, QUART, LUPARDO, STIRPE, CRESPO, GOTTFRIED, PEOPLES-STOKES, COLTON, ROZIC, JAFFEE, SANTABARBARA, MAGNARELLI, COOK, STECK, PAULIN, RAIA, L. ROSENTHAL, BUCHWALD, GUNTHER, MONTESANO, CAHILL, BARRETT, PERRY, BENEDETTO, DINOWITZ, BRAUNSTEIN, AUBRY, WEPRIN, FAHY, JOHNS -- Multi-Sponsored by -- M. of A. CROUCH, GALEF, GLICK, LENTOL, McDO- NOUGH, RIVERA, RODRIGUEZ, SOLAGES -- read once and referred to the Committee on Energy AN ACT to amend the public service law, in relation to establishing a solar incentive and financing program The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Short title. This act shall be known and may be cited as 2 the "New York sun act of 2019". 3 § 2. The public service law is amended by adding a new section 66-p to 4 read as follows: 5 § 66-p. Solar incentive and financing program. 1. As used in this 6 section: 7 (a) "Electric distribution company" means an investor-owned electric 8 corporation that distributes and delivers electricity within this state 9 and has annual revenues in excess of two hundred million dollars; and 10 (b) (i) "Qualified solar photovoltaic generating system" means a 11 system of components that generates electricity from sunlight by means 12 of the photovoltaic effect, whether or not the device is coupled with a 13 device capable of storing the energy produced for later use, that is (A) 14 installed and operated in the state within one of the service territo- 15 ries of an electric distribution company as defined in this section, and 16 (B) installed after January first, two thousand twenty. 17 (ii) a qualified solar photovoltaic generating system shall not 18 include: (A) a solar photovoltaic generating system owned by a public 19 authority, where such authority does not consume all of the electricity EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD09028-01-9A. 4633 2 1 produced and instead sells all or a portion of said electricity to 2 another entity, other than when said authority uses such system to 3 engage in net energy metering as defined in paragraph (c) of subdivision 4 one of section sixty-six-j of this article, and (B) a solar photovoltaic 5 generating system that is owned by an electric distribution company. 6 2. Within forty-five days of the effective date of this section, the 7 commission shall commence the consideration of modifications to its 8 existing programs that encourage the development of qualified solar 9 photovoltaic generating systems and, no later than September first, two 10 thousand twenty, the commission shall make a determination establishing 11 modifications to its existing programs that encourage the development of 12 qualified solar photovoltaic generating systems in conformance with this 13 section. The department shall consult with the New York state energy 14 research and development authority in the preparation of its recommenda- 15 tions to the commission for such determination. The program modifica- 16 tions shall require: 17 (a) administration by the New York state energy research and develop- 18 ment authority; 19 (b) planned statewide annual expenditures including all costs of a 20 minimum of one hundred fifty million dollars, taking into consideration 21 the solar-based programs administered by the Long Island power authori- 22 ty, commencing in calendar year two thousand twenty and sustained each 23 year through calendar year two thousand twenty-nine; 24 (c) a diversity of project sizes, geographic distribution, and partic- 25 ipation among customer classes, subject to cost-effectiveness consider- 26 ations; 27 (d) incentive or financing structures that maximize cost-effectiveness 28 and practicality through competitive procurements, standing-offers, 29 production incentives or capacity incentives at the wholesale or retail 30 level as in the judgment of the commission provide for the most effec- 31 tive program; 32 (e) for projects exceeding one hundred kilowatts, incentive or financ- 33 ing structures that take into consideration the economic benefits to the 34 state; 35 (f) program designs that take into consideration the avoidance of 36 long-term costs to the transmission and distribution system and minimi- 37 zation of peak load in constrained areas; 38 (g) annual reports on the achievements and effectiveness of the 39 program; and 40 (h) such other issues deemed appropriate by the commission. 41 § 3. This act shall take effect immediately.