Bill Text: WI SB835 | 2019-2020 | Regular Session | Introduced
Bill Title: Installation of empty conduit lines as part of a digging project in a right-of-way and offers of service from fiber optic cable broadband lines installed in rights-of-way. (FE)
Spectrum: Partisan Bill (Democrat 21-0)
Status: (Failed) 2020-04-01 - Failed to pass pursuant to Senate Joint Resolution 1 [SB835 Detail]
Download: Wisconsin-2019-SB835-Introduced.pdf