Bill Text: WI SB835 | 2019-2020 | Regular Session | Introduced


Bill Title: Installation of empty conduit lines as part of a digging project in a right-of-way and offers of service from fiber optic cable broadband lines installed in rights-of-way. (FE)

Spectrum: Partisan Bill (Democrat 21-0)

Status: (Failed) 2020-04-01 - Failed to pass pursuant to Senate Joint Resolution 1 [SB835 Detail]

Download: Wisconsin-2019-SB835-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback