Bill Text: HI HB2524 | 2014 | Regular Session | Introduced


Bill Title: Capital Improvement Projects; 37th Representative District ($)

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2014-01-27 - Referred to FIN, referral sheet 7 [HB2524 Detail]

Download: Hawaii-2014-HB2524-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

2524

TWENTY-SEVENTH LEGISLATURE, 2014

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the thirty-seventh REPRESENTATIVE district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  Mililani, Waipio Gentry, and Waikele, located in the thirty-seventh representative district, encompass the new and expanding area of Central Oahu.  Aging and deteriorating school facilities in the district require repair and maintenance to ensure that these facilities meet the educational needs of youth in the community and the community at-large.

     SECTION 2.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2014-2015:

     1.   To be expended by the department of education:

     A.   Highlands intermediate school, Oahu

Design and construction to install air conditioning for building G; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $450,000

          Total funding                 $550,000

     B.   Highlands intermediate school, Oahu

Design and construction to install air conditioning for building K; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $450,000

          Total funding                 $550,000

     C.   Highlands intermediate school, Oahu

Design and construction of an addition to the existing rock wall surrounding the school and installation of a chain link fence on top of the rock wall; ground and site improvements; and equipment and appurtenances.

          Design                        $ 45,000

          Construction                  $410,000

          Total funding                 $455,000

     D.   Kanoelani elementary school, Oahu

Design and construction to install air conditioning school-wide in A, B, C, and F buildings.

          Design                      $    1,000

          Construction                $1,499,000

          Total funding               $1,500,000

     E.   Kanoelani elementary school, Oahu

Design and construction for a new parking lot to front the administration building.

          Design                      $    1,000

          Construction                $1,999,000

          Total funding               $2,000,000

     F.   Kipapa elementary school, Oahu

Design and construction to reroof the library and administration buildings.

          Design                        $  1,000

          Construction                  $799,000

          Total funding                 $800,000

     G.   Kipapa elementary school, Oahu

Design and construction for renovation of the cafeteria stage to comply with the Americans with Disabilities Act.

          Design                         $ 1,000

          Construction                   $69,000

          Total funding                  $70,000

     H.   Mililani high school, Oahu

Design and construction for steps and an Americans with Disabilities Act compliant ramp.

          Design                        $  1,000

          Construction                  $119,000

          Total funding                 $120,000

     I.   Mililani high school, Oahu

Design and construction of a six-classroom building with office and forum space.

          Design                      $    1,000

          Construction                $4,999,000

          Total funding               $5,000,000

     J.   Mililani high school, Oahu

Design and construction of a second floor to the administration building and to build a conjoining performing arts facility.

          Design                     $ 1,500,000

          Construction               $28,500,000

          Total funding              $30,000,000

     K.   Mililani middle school, Oahu

Design and construction to reroof F, G, and C buildings and replace gutters school-wide.

          Design                      $    1,000

          Construction                $1,399,000

          Total funding               $1,400,000

     L.   Mililani middle school, Oahu

          Design and construction of a covered play court.

          Design                      $    1,000

          Construction                $2,999,000

          Total funding               $3,000,000

     M.   Mililani middle school, Oahu

Design and construction to resurface the bike rack area.

          Design                        $  1,000

          Construction                  $ 99,000

          Total funding                 $100,000

     N.   Mililani middle school, Oahu

Design and construction to resurface the school bus lane and side access road.

          Design                        $  1,000

          Construction                  $299,000

          Total funding                 $300,000

     O.   Mililani Uka elementary school, Oahu

Design and construction for a school-wide electrical upgrade.

          Design                       $  100,000

          Construction                $  900,000

          Total funding               $1,000,000

     P.   Mililani Waena elementary school, Oahu

Design and construction to reconfigure the parking lot and driveway to alleviate area traffic congestion.

          Design                      $    5,000

          Construction                $1,995,000

          Total funding               $2,000,000

     Q.   Pearl City high school, Oahu

Design and construction to concrete lower courtyard by B and C buildings; ground and site improvements; and equipment and appurtenances.

          Design                        $ 40,000

          Construction                  $130,000

          Total funding                 $170,000

     R.   Pearl City high school, Oahu

Design and construction to concrete upper courtyard by B and C buildings; ground and site improvements; and equipment and appurtenances.

          Design                        $ 40,000

          Construction                  $130,000

          Total funding                 $170,000

     S.   Pearl City high school, Oahu

Design and construction of a handicap parking lot by the tennis court; ground and site improvements; and equipment and appurtenances.

          Design                        $ 50,000

          Construction                  $200,000

          Total funding                 $250,000

     T.   Waikele elementary school, Oahu

Design and construction for cafeteria renovation and expansion to add a cafeteria stage.

          Design                      $   100,000

          Construction               $ 9,900,000

          Total funding              $10,000,000

     U.   Waikele elementary school, Oahu

Design and construction of the expansion to the library to accommodate the school's digital media learning program.

          Design                       $  100,000

          Construction                $3,900,000

          Total funding               $4,000,000

     V.   Waikele elementary school, Oahu

Design and construction of a six-classroom building to accommodate the growing student body.

          Design                       $  100,000

          Construction                $6,500,000

          Total funding               $6,600,000

     W.   Waipahu high school, Oahu

Design and construction of a ten-classroom building.

          Design                      $   100,000

          Construction               $12,900,000

          Total funding              $13,000,000

     X.   Waipahu high school, Oahu

Design and construction for an electrical upgrade to the entire school.

          Design                       $    1,000

          Construction                $5,999,000

          Total funding               $6,000,000

     Y.   Waipahu high school, Oahu

Design and construction for a walk-in refrigerator for the culinary academy.

Design                         $  1,000

          Construction                  $149,000

          Total funding                 $150,000

     Z.   Waipahu high school, Oahu

Design and construction for the resurfacing of the school's tennis courts.

          Design                         $  1,000

          Construction                  $299,000

          Total funding                 $300,000

     AA.  Waipahu intermediate school, Oahu

Design and construction of an eight-classroom building.

          Design                      $   500,000

          Construction               $14,500,000

          Total funding              $15,000,000

     BB.  Waipahu intermediate school, Oahu

Design and construction for an electrical upgrade to the school.

          Design                      $    1,000

          Construction                $  999,000

          Total funding               $1,000,000

     CC.  Waipahu intermediate school, Oahu

Design and construction of a multi-purpose play court.

          Design                      $    1,000

          Construction                $2,999,000

          Total funding               $3,000,000

     2.   To be expended by the department of transportation:

     A.   Kamehameha highway, Oahu

Plans, design, and construction for sidewalk improvements along Kamehameha highway between Lanikuhana avenue and Meheula parkway.

          Plans                        $  100,000

          Design                       $  100,000

          Construction                $2,300,000

          Total funding               $2,500,000

SECTION 3.  The sums appropriated for the respective capital projects set forth in section 2 shall be expended by the designated expending agency for the purposes of this Act.

SECTION 4.  This Act shall take effect on July 1, 2014.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

Capital Improvement Projects; 37th Representative District

 

Description:

Appropriates funds for capital improvement projects for the benefit of the 37th representative district.  Effective July 1, 2014.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

 

feedback