THE SENATE

S.B. NO.

1539

TWENTY-SIXTH LEGISLATURE, 2011

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE twenty-fourth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $50,802,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2011-2012 for the purpose of capital improvement projects for the twenty‑fourth senatorial district as follows:

1.   Aikahi elementary school

     A.   Upgrade existing furniture.

          Total funding                                 $25,000

2.   Castle high school

     A.   Replace the current lighting system and sound system in the Ronald Bright Auditorium.  Due to the increased use of the Ronald Bright Auditorium by both the school and community, there has been a lot of wear and tear.  The lighting system is failing and is in need of replacement.  The goal is to go green with the replacement in order to decrease energy costs with the hope of cutting the cost by a third.

          Total funding                                $500,000

3.   Enchanted Lake elementary school

     A.   Electrical upgrade that include plans, design, and construction.

          Plans                           $1,000

          Design                          $1,000

          Construction                   $98,000

          Total funding                                $100,000

     B.   Shelter coverage for administration classroom rear door entrance.

          Plans                           $1,000

          Design                          $1,000

          Construction                   $98,000

          Total funding                                $100,000

     C.   Shelter coverage for front and back door of the library.

          Plans                           $1,000

          Design                          $1,000

          Construction                   $98,000

          Total funding                                $100,000

4.   Hakipuu learning center

     A.   Building construction (FY12)

          Total funding                              $1,404,000

     B.   Building construction (FY13)

          Total funding                              $8,892,000

5.   Kaelepulu elementary school

     A.   Replace walkway steps from parking lot to building C because of safety issue.

          Design                         $25,000

          Construction                  $150,000

          Total funding                                $175,000

     B.   Upgrade telecommunications network.

          Design                         $35,000

          Construction                  $145,000

          Total funding                                $180,000

     C.   Covered walkways for the school.

          Design                         $40,000

          Construction                  $140,000

          Total funding                                $180,000

     D.   Whole school classroom renovation.

          Design                        $100,000

          Construction                $1,500,000

          Total funding                              $1,600,000

6.   Kailua high school

     A.   Design and construction of a natural resources classroom building with specially designed research laboratories to allow the school to offer advanced level courses in the natural sciences.  The site of the proposed project is the building L and agricultural field area.

          Design                        $800,000

          Construction               $15,200,000

          Total funding                             $16,000,000

     B.   Removal and replacement of soccer/football field bleachers/storage rooms.

          Plans                          $50,000

          Design                        $500,000

          Construction                $1,990,000

          Total funding                              $2,540,000

7.   Kailua intermediate school

     A.   School-wide electrical upgrade.  The use of technology is on the rise and the increased usage of electricity has caused intermittent power outages in various sections of the school campus.

          Design                         $91,600

          Construction                  $824,400

          Total funding                                $916,000

8.   Kalaheo high school

     A.   Construction of a regulation football/soccer field through a joint partnership with military, alumni, and community volunteers.  Lengthen the physical education field and install field lights and bleachers.

          Plans                          $75,000

          Design                         $75,000

          Construction                  $350,000

          Equipment                     $250,000

          Total funding                                $750,000

9.   Ke Kula o Samuel M. Kamakau laboratory public charter school

     A.   Upgrade school infrastructure to meet current health and safety requirements.  Renovate and construct additional classroom space, repair and/or renovate building #1, building #2, office space, outdoor space and roadways to meet safety requirements.

          Total funding                              $4,866,000

10.  Kaneohe elementary school

     A.   Design and construction for ADA (American with Disabilities Act) transition plan improvements; campus accessibility upgrades.

          Design                        $150,000

          Construction                  $600,000

          Total funding                                $750,000

     B.   Design, construction, and equipment for the cafeteria, to include audio-visual upgrades and acoustical treatment.

          Design                         $75,000

          Construction                  $400,000

          Equipment                      $75,000

          Total funding                                $550,000

     C.   Design, construction, and equipment for a new portable classroom.

          Design                         $18,000

          Construction                  $370,000

          Equipment                      $12,000

          Total funding                                $400,000

     D.   Design and construction for campus wide air conditioning and energy efficiency upgrades.

          Design                        $525,000

          Construction                $3,475,000

          Total funding                              $4,000,000

11.  Kapunahala elementary school

     A.   Covered walkway between A and B buildings.

          Plans                           $1,000

          Design                         $40,000

          Construction                  $155,000

          Total funding                                $196,000

     B.   Covered walkway and sidewalk between buildings B and C.

          Plans                           $1,000

          Design                         $40,000

          Construction                  $160,000

          Total funding                                $201,000

     C.   Elevator for building B.

          Plans                           $5,000

          Design                         $50,000

          Construction                  $150,000

          Total funding                                $205,000

     D.   Covered playground in back of building C.

          Plans                           $1,000

          Design                          $2,500

          Construction                   $10,000

          Total funding                                 $13,500

12.  Keolu elementary school

     A.   Convert the media lab into a larger multimedia lab to document, research, and design to meet all areas of performance arts to include drama, fine arts, graphic arts, etc.

          Plans                             $500

          Design                          $2,000

          Construction                  $120,000

          Equipment                      $20,000

          Total funding                                $142,500

     B.   Install overhead projector in the cafeteria to show presentations at all parent/community functions and student activities.

          Construction                      $500

          Equipment                       $7,500

          Total funding                                  $8,000

13.  King intermediate school

     A.   Expansion of the existing cafeteria to serve as a theater/performance center (addition of PA system, curtains, lighting) with adjoining restroom facility.

          Plans                          $30,000

          Design                         $60,000

          Construction                  $400,000

          Equipment                      $10,000

          Total funding                                $500,000

     B.   Remodel gym kitchen area (sinks, cabinets, appliances).

          Plans                           $5,000

          Design                          $1,000

          Construction                   $14,000

          Total funding                                 $20,000

14.  Maunawili elementary school

     A.   Elevator for building E to access the computer lab on the second floor.  This would move Maunawili into ADA (Americans with Disabilities Act) compliance for students and adults who cannot walk up the stairs.

          Plans                           $5,000

          Design                         $50,000

          Construction                  $150,000

          Total funding                                $205,000

15.  Mokapu elementary school

     A.   Electrical upgrade that will allow Mokapu school, Windward's largest military impacted school and one of Hawaii's top military serving schools, to fully implement technology purchased with JVEF funds.

          Design                        $120,000

          Construction                $1,090,000

          Total funding                              $1,210,000

16.  Olomana school

     A.   Construction of a 12-foot extension to the existing physical education portable.  Extension is needed to accommodate the increasing number of "at-risk" students who are being sent to Olomana.  Presently, all PE classes are held in a single room portable building.  Overcrowding poses a health and safety issue/problem.

          Plans                           $5,000

          Design                          $8,000

          Construction                   $75,000

          Total funding                                 $88,000

17.  Reverend Benjamin Parker elementary school

     A.   Building C, D, and H second floor handicapped accessibility, including elevator at C or D building.  A walkway connecting the second floors of the three buildings would be constructed atop the existing ground level walkway;  safety railings for the second floor walkway; creation  of entrances on the second floor of each building; reinforcement of the existing walkway to accommodate extra weight and traffic; and creating security gates for the second floor walkway entrances.

          Plans                          $30,000

          Design                        $100,000

          Construction                $1,300,000

          Total funding                              $1,430,000

18.  Puohala elementary school

     A.   Structural assessment to address the separation of walls in buildings on campus, particularly in building A and in a section backstage in the cafeteria.

          Total funding                                $250,000

19.  Kaneohe public library

     A.   Kaneohe library needs a new circulation desk because the current desk is not ADA (Americans with Disabilities Act) compliant.  It has many limitations and has suffered extensive damage over the years.  Public service is hampered by its inability to secure returned materials.

          Plans                           $5,000

          Design                          $5,000

          Construction                   $10,000

          Total funding                                 $20,000

20.  Kailua public library

     A.   Kailua library new roof

          Plan, design, and

          construction                  $200,000

          Total funding                                $200,000

21.  Department of land and natural resources

     A.   Plans and design for an engineering study and environmental assessment to restore water flow from Kawai Nui marsh to Kawai Nui stream.

          Construction                  $425,000

          Total funding                                $425,000

     B.   Creation of a windward area dog park.

          Plans                          $10,000

          Design                         $10,000

          Construction                  $200,000

          Total funding                                $220,000

22.  Department of transportation

     A.   Sidewalk and pedestrian improvements for Lilipuna road, Waiakalua road, and William Henry road.

          Plans                          $50,000

          Design                         $75,000

          Construction                $1,000,000

          Total funding                              $1,125,000

     B.   Traffic study for Olomana and Pohakupu subdivisions, ingress/egress.

          Plans                           $1,000

          Design                          $1,000

          Construction                   $23,000

          Total funding                                 $25,000

     C.   Parking lot for Maunawili elementary school behind Olomana fire station.

          Plans                          $10,000

          Design                        $240,000

          Total funding                                $250,000

     D.   Installation of 10 storm drain filters for Kaneohe/Kailua area.

          Plans                          $10,000

          Design                         $10,000

          Construction                   $20,000

          Total funding                                 $40,000

     SECTION 2.  The appropriation made for the capital improvement project authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2014, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act, as follows:

     (1)  The sums appropriated in items 1 through 20 shall be expended by the department of education;

     (2)  The sums appropriated in item 21 shall be expended by the department of land and natural resources; and

     (3)  The sums appropriated in item 22 shall be expended by the department of transportation.

     SECTION 4.  This Act shall take effect on July 1, 2011.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 24th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the twenty-fourth senatorial district.

 

 

 