A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE seventh SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $257,528,709 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2024-2025 for the purpose of capital improvement projects for the seventh senatorial district, as follows:

1.   Upcountry Maui watershed (Maui)

     A.   Plans, land, design, and construction for improvements to the upcountry Maui watershed.

          Plans                             $1,000

          Land                              $3,000

          Design                            $1,000

          Construction                  $1,145,000

          Total funding                         $1,150,000

2.   Kanaio resource protection (Maui)

     A.   Plans, design, and construction for a resource fence.

          Plans                             $1,000

          Design                            $1,000

          Construction                    $798,000

          Total funding                           $800,000

3.   Kanaio dry forest fence (Maui)

     A.   Plans, design, construction, and equipment to protect and restore a dryland forest.

          Plans                             $1,000

          Design                            $1,000

          Construction                    $297,000

          Equipment                         $1,000

          Total funding                           $300,000

4.   Puu Alii Molokai tree snail predator proof fences (Molokai)

     A.   Construction to protect critically endangered tree-snail species and native forest in Puu Alii Molokai, and all project related costs.

          Construction                    $300,000

          Total funding                           $300,000

5.   Paia bypass (Maui)

     A.   Plans, design, and construction for the Paia bypass.

          Plans                           $100,000

          Design                       $48,900,000

          Total funding                        $49,000,000

6.   Niaupala fishpond bypass road (Molokai)

     A.   Plans, design, and construction for the bypass on Kamehameha V highway, route 450.

          Plans                           $500,000

          Design                          $500,000

          Construction                  $9,000,000

          Total funding                        $10,000,000

7.   Haleakala highway (Maui)

     A.   Construction to widen Haleakala highway at mile post 0.8.

          Construction                  $4,000,000

          Total funding                         $4,000,000

8.   Hana highway improvements (Maui)

     A.   Construction improving, upgrading, and repairing roadways, bridges, walls, drainage structures, guardrails, and other facilities on route 360 Hana highway deemed necessary to qualify for federal aid financing and reimbursement.

          Construction                  $2,700,000

          Total funding                         $2,700,000

9.   Lanai Community Health Center (Lanai)

     A.   Plans, design, and construction for renovation of the health center to accommodate the expanding services created by the coronavirus 2019 pandemic, flu, and respiratory syncytial virus.

          Plans                             $1,500

          Design                            $1,500

          Construction                    $397,000

          Total funding                           $400,000

10.  Haiku elementary school (Maui)

     A.   Construction and equipment for fencing to surround the perimeter of the campus for safety, gates to secure upper campus area near MEO, new administrative buildings and classrooms to replace unusable space, and electrical upgrades for the campus.

          Construction                 $40,000,000

          Equipment                    $30,000,000

          Total funding                        $70,000,000

     B.   Plans, design, construction, and equipment for widening of walkways to make them compliant with Americans with Disabilities Act standards, removal of walkway traffic barriers, remodeling of front office and construction of a rear exit, accessibility upgrades to the cafeteria, purchase and installation of a digital marquee, upgrades to classroom doors, and electrical capability upgrades for the kindergarten and portable buildings.

          Plans                             $1,500

          Design                            $1,500

          Construction                  $6,997,000

          Equipment                     $2,000,000

          Total funding                         $9,000,000

11.  Hana school (Maui)

     A.   Plans, design, construction, and equipment for a real grass multipurpose athletic field at lower field.

          Plans                            $50,000

          Design                          $100,000

          Construction                  $2,500,000

          Equipment                        $50,000

          Total funding                         $2,700,000

12.  Kula elementary school (Maui)

     A.   Plans, design, construction, and equipment for a new cafeteria.

          Plans                           $400,000

          Design                          $400,000

          Construction                  $6,000,000

          Equipment                     $1,000,000

          Total funding                         $7,800,000

     B.   Plans, design, construction, and equipment to replace damaged playground equipment and for additional playground equipment.

          Plans                            $50,000

          Design                           $50,000

          Construction                    $100,000

          Equipment                       $250,000

          Total funding                           $450,000

13.  Kilohana elementary (Molokai)

     A.   Plans, design, construction, and equipment for a multi-purpose facility to be used for performing arts, student exhibitions, family engagement events, school events, and school evacuation site.

          Total funding                         $5,500,000

     B.   Demolition and replacement of two existing recreation playground structures with two new age-appropriate playground structures with covered shade.

          Total funding                         $2,000,000

     C.   Resurfacing of two basketball courts; replacement of four basketball frames; replacement of two sets of court lights; installation of shade.

          Total funding                         $1,200,000

     D.   Demolition of existing pre-kindergarten portable classroom; construction for a new portable pre-kindergarten classroom; new age-appropriate recreational playground equipment and structures with shade covering; restrooms and shower; fencing; parking; outdoor lighting; compliant accessibility.

          Total funding                         $1,800,000

     E.   Fencing six to eight feet of school property; removal of invasive trees.

          Total funding                           $250,000

     F.   Plan, design, construction, and equipment to clear land north of school property for health and safety risks and improved outdoor learning and recreational spaces and a covered structure for emergency safety drills and outdoor learning.

          Total funding                         $1,600,000

     G.   Plans, design, construction, and equipment for a covered outdoor learning center with pad and picnic tables, electricity installation.

          Total funding                            $90,000

     H.   Install shade cloth for rain and sun protection in H building breezeway.

          Total funding                            $24,000

     I.   Grade and fill lawn areas to be level with sidewalks across the campus.

          Total funding                           $400,000

     J.   Installation of shade on the entry walkway from H building classrooms to kitchen.

          Total funding                           $120,000

     K.   Installation of two handball courts with pad.

          Total funding                            $27,000

14.  Kaunakakai elementary school (Molokai)

     A.   Plans, design, construction, and equipment to replace playground equipment for the pre-school, lower elementary, and upper elementary, and to cover each structure.

          Plans                             $1,500

          Design                            $1,500

          Construction                    $297,000

          Equipment                       $215,000

          Total funding                           $515,000

15.  King Kekaulike high school (Maui)

     A.   Plans, design, construction, and equipment for landscaping of parking lots, portable classroom, repainting of school exterior, and a pool for physical education classes.

          Plans                             $5,000

          Design                           $10,000

          Construction                 $19,985,000

          Equipment                     $2,000,000

          Total funding                        $22,000,000

16.  Kualapuu public conversion charter school (Molokai)

     A.   Plans, design, and construction for upgrades to repair perimeter fences and gates, install protective metal gratings on louvered windows, cafeteria wall tile upgrades, stair and ramp security blocks, campus security cameras and alarm system, and additional lighting for hallways and open areas.

          Plans                            $50,000

          Design                           $50,000

          Construction                  $1,900,000

          Total funding                         $2,000,000

17.  Lanai high and elementary school (Lanai)

     A.   Plans, design, and construction for replacing the gym floor and building, roof repair for buildings M and N, teacher housing, basketball and tennis courts and field, repainting the entire school, and a compressor for building M.

          Plans                             $2,500

          Design                            $2,500

          Construction                 $23,347,709

          Equipment                       $200,000

          Total funding                        $23,552,709

18.  Maunaloa elementary school (Molokai)

     A.   Plans, design, construction, and equipment for repair of the foundation and wall siding of the administration building, building A, portable, and cottages A, B, and C.

          Plans                            $50,000

          Design                          $150,000

          Construction                  $1,500,000

          Total funding                         $1,700,000

19.  Molokai middle school (Molokai)

     A.   Plans, design, and construction for a safe and permanent drop-off and pick-up area and additional parking stalls for staff.

          Plans                           $250,000

          Design                          $800,000

          Construction                  $4,200,000

          Total funding                         $5,250,000

20.  Molokai high school (Molokai)

     A.   Plans, design, construction, and equipment to renovate the school gymnasium including new exterior paint, new gym louvers, chair lift repairs, roof and vent repairs, removal of vegetation from gutters, resurfacing of the gym floors, and replacement of bleachers.

          Plans                             $1,500

          Design                            $1,500

          Construction                    $550,000

          Equipment                       $347,000

          Total funding                           $900,000

21.  Paia Elementary School (Maui)

     A.   Plans, design, and construction, of a new classroom building; ground and site improvements; equipment and appurtenances.

          Total funding                        $30,000,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2026, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items 1 through 4 shall be expended by the department of land and natural resources;

     (2)  The sums appropriated in items 5 through 8 shall be expended by the department of transportation;

     (3)  The sum appropriated in item 9 shall be expended by the department of health; and

     (4)  The sums appropriated in items 10 through 21 shall be expended by the department of education.

     SECTION 4.  This Act shall take effect on July 1, 2024.

 

INTRODUCED BY:

_____________________________

 

 


 


 


Report Title:

CIP; 7th Senatorial District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the 7th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback