Bill Amendment: IL HB5293 | 2023-2024 | 103rd General Assembly
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: EPA-BESS
Status: 2024-04-19 - House Floor Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee [HB5293 Detail]
Download: Illinois-2023-HB5293-House_Amendment_001.html
Bill Title: EPA-BESS
Status: 2024-04-19 - House Floor Amendment No. 1 Rule 19(c) / Re-referred to Rules Committee [HB5293 Detail]
Download: Illinois-2023-HB5293-House_Amendment_001.html
| |||||||
| |||||||
1 | AMENDMENT TO HOUSE BILL 5293 | ||||||
2 | AMENDMENT NO. ______. Amend House Bill 5293 on page 1, by | ||||||
3 | replacing lines 10 through 15 with the following: | ||||||
4 | " "Battery energy storage solution facility" or "BESS" | ||||||
5 | means a facility that stores and distributes energy in the | ||||||
6 | form of electricity and that stores electricity using battery | ||||||
7 | devices and other means. "Battery energy storage solution" or | ||||||
8 | "BESS" includes any permanent structures associated with the | ||||||
9 | battery energy storage facility and all associated | ||||||
10 | transmission lines, substations, and other equipment related | ||||||
11 | to the storage and transmission of electric power. "; and
| ||||||
12 | on page 2, line 21, replace " week. " with " week; and "; and
| ||||||
13 | on page 2, immediately below line 21, by inserting the | ||||||
14 | following: | ||||||
15 | " (3) the owner or operator of the battery storage site | ||||||
16 | is an automotive parts recycler as defined in Section |
| |||||||
| |||||||