Bill Text: HI HB200 | 2011 | Regular Session | Amended


Bill Title: State Budget

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Passed) 2011-06-23 - (H) Act 164, on 6/23/2011 (Gov. Msg. No. 1267). [HB200 Detail]

Download: Hawaii-2011-HB200-Amended.html

HOUSE OF REPRESENTATIVES

H.B. NO.

200

TWENTY-SIXTH LEGISLATURE, 2011

H.D. 1

STATE OF HAWAII

S.D. 1

 

C.D. 1

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO THE STATE BUDGET.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


PART I.  GENERAL PROVISIONS

     SECTION 1.  SHORT TITLE.  This Act shall be known and may be cited as the General Appropriations Act of 2011.

     SECTION 2.  DEFINITIONS.  Unless otherwise clear from the context, as used in this Act:

(a)  "Program ID" means the unique identifier for the specific program, and consists of the abbreviation for the organization responsible for carrying out the program, followed by the organization number for the program.

(b)  "Expending agency" means the executive department, independent commission, bureau, office, board, or other establishment of the state government (other than the legislature, office of Hawaiian affairs, and judiciary), the political subdivisions of the State, or any quasi‑public institution supported in whole or in part by state funds, which is authorized to expend specified appropriations made by this Act.

     Abbreviations where used to denote the expending agency shall mean the following:

AGR  Department of Agriculture

AGS  Department of Accounting and General Services

ATG  Department of the Attorney General

BED  Department of Business, Economic Development and

     Tourism

BUF  Department of Budget and Finance

CCA  Department of Commerce and Consumer Affairs

DEF  Department of Defense

EDN  Department of Education

GOV  Office of the Governor

HHL  Department of Hawaiian Home Lands

HMS  Department of Human Services

HRD  Department of Human Resources Development

HTH  Department of Health

LBR  Department of Labor and Industrial Relations

LNR  Department of Land and Natural Resources

LTG  Office of the Lieutenant Governor

PSD  Department of Public Safety

SUB  Subsidies

TAX  Department of Taxation

TRN  Department of Transportation

UOH  University of Hawaii

CCH  City and County of Honolulu

COH  County of Hawaii

COK  County of Kauai

COM  County of Maui

(c)  "Means of financing" (or "MOF") means the source from which funds are appropriated or authorized to be expended for the programs and projects specified in this Act.  All appropriations are followed by letter symbols.  Such letter symbols, where used, shall have the following meanings:

A   general funds

B   special funds

C   general obligation bond fund

D   general obligation bond fund with debt service cost to

    be paid from special funds

E   revenue bond funds

J   federal aid interstate funds

K   federal aid primary funds

L   federal aid secondary funds

M   federal aid urban funds

N   other federal funds

R   private contributions

S   county funds

T   trust funds

U   interdepartmental transfers

V   federal stimulus funds

W   revolving funds

X   other funds

(d)  "Position ceiling" means the maximum number of permanent positions that an expending agency is authorized for a particular program during a specified period or periods, as denoted by an asterisk.

(e)  "Capital project number" means the official number of the capital project, as assigned by the responsible organization.

PART II.  PROGRAM APPROPRIATIONS

     SECTION 3.  APPROPRIATIONS.  The following sums, or so much thereof as may be sufficient to accomplish the purposes and programs designated herein, are hereby appropriated or authorized, as the case may be, from the means of financing specified to the expending agencies designated for the fiscal biennium beginning July 1, 2011, and ending June 30, 2013.  The total expenditures and the number of positions in each fiscal year of the biennium shall not exceed the sums and the number indicated for each fiscal year, except as provided elsewhere in this Act, or as provided by general law.


A.  ECONOMIC DEVELOPMENT

1.   BED100 - STRATEGIC MARKETING AND SUPPORT

                                                 12.00*         10.00*

OPERATING                         BED        1,177,828A       921,828A

                                                      *          2.00*

                                  BED                 B       362,800B

                                  BED          148,718N       148,718N

                                  BED          250,000V              V

                                  BED        1,821,915W     1,821,915W

 

2.   BED105 - CREATIVE INDUSTRIES DIVISION

                                                  8.00*          8.00*

OPERATING                         BED          813,704A       841,454A

 

3.   BED107 - FOREIGN TRADE ZONE

                                                 17.00*         17.00*

OPERATING                         BED        2,066,145B     2,066,145B

INVESTMENT CAPITAL                BED        4,500,000D              D

                                  BED        3,000,000N              N

 

4.   BED142 - GENERAL SUPPORT FOR ECONOMIC DEVELOPMENT

                                                 21.00*         21.00*

OPERATING                         BED        1,536,061A     1,536,061A

 

5.   BED113 - TOURISM

                                                  6.00*          6.00*

OPERATING                         BED      141,162,298B   141,162,298B

 

6.   AGR101 - FINANCIAL ASSISTANCE FOR AGRICULTURE

                                                  9.00*          9.00*

OPERATING                         AGR        1,089,967B     1,089,967B

                                  AGR        5,000,000W     5,000,000W

 

7.   AGR122 - PLANT, PEST, AND DISEASE CONTROL

                                                 50.00*         50.00*

OPERATING                         AGR        3,341,420A     3,341,420A

                                                 62.00*         62.00*

                                  AGR       10,515,874B    10,515,874B

                                  AGR          753,383N       753,383N

                                  AGR          512,962T       512,962T

                                                  9.00*          9.00*

                                  AGR        1,029,791U     1,029,791U

                                  AGR           50,360W        50,360W

 

8.   AGR131 - RABIES QUARANTINE

                                                 36.32*         36.32*

OPERATING                         AGR        3,281,623B     3,281,623B

 

9.   AGR132 - ANIMAL DISEASE CONTROL

                                                 13.68*         13.68*

OPERATING                         AGR          971,700A       971,700A

                                  AGR          377,518N       377,518N

                                  AGR          473,224U       473,224U

 

10.  LNR172 - FORESTRY - RESOURCE MANAGEMENT AND DEVELOPMENT

                                                 15.00*         15.00*

OPERATING                         LNR          553,023A       553,023A

                                                  1.50*          1.50*

                                  LNR        3,909,996B     3,637,996B

                                                  1.50*          1.50*

                                  LNR          992,847N       992,847N

 

11.  AGR151 - QUALITY AND PRICE ASSURANCE

                                                 16.00*         16.00*

OPERATING                         AGR        1,093,246A     1,093,246A

                                                  1.00*          1.00*

                                  AGR          204,885B       204,885B

                                  AGR           77,424N        77,424N

                                  AGR          300,000T       300,000T

                                  AGR          570,353W       502,553W

 

12.  AGR171 - AGRICULTURAL DEVELOPMENT AND MARKETING

                                                 12.00*         12.00*

OPERATING                         AGR          995,183A       995,183A

                                  AGR           20,000B        20,000B

                                  AGR          184,500N       184,500N

 

13.  AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

                                                  1.00*          1.00*

OPERATING                         AGR          543,814A       543,814A

                                                  9.00*          9.00*

                                  AGR        1,925,210B     1,925,210B

                                                 13.00*         13.00*

                                  AGR        1,488,383W     1,488,383W

INVESTMENT CAPITAL                AGR       12,710,000C    11,900,000C

                                  AGR        7,050,000N     8,350,000N

 

14.  AGR161 - AGRIBUSINESS DEVELOPMENT AND RESEARCH

OPERATING                         AGR           50,601A        50,601A

                                  AGR          500,000B       500,000B

                                  AGR        3,452,371W     3,397,691W

INVESTMENT CAPITAL                AGR          750,000C              C

 

15.  AGR192 - GENERAL ADMINISTRATION FOR AGRICULTURE

                                                 20.00*         20.00*

OPERATING                         AGR        1,448,696A     1,448,696A

                                                  4.00*          4.00*

                                  AGR          272,350B       272,350B

INVESTMENT CAPITAL                AGR          750,000C       500,000C

 

16.  LNR153 - COMMERCIAL FISHERIES AND RESOURCE ENHANCEMENT

                                                  6.00*          6.00*

OPERATING                         LNR          581,020A       581,020A

                                  LNR          303,474B       303,474B

                                                  1.00*          1.00*

                                  LNR          750,305N       750,305N

INVESTMENT CAPITAL                LNR           50,000C       320,000C

 

17.  AGR153 - AQUACULTURE DEVELOPMENT PROGRAM

                                                  4.00*          4.00*

OPERATING                         AGR          310,405A       310,405A

                                  AGR           60,000B        60,000B

                                  AGR           46,134N        46,134N

 

18.  BED120 – PROGRAM ON ENVIRONMENT AND ENERGY DEVELOPMENT

                                                  3.00*          3.00*

OPERATING                         BED          305,176A       305,176A

                                                  5.00*          5.00*

                                  BED        4,085,300B     4,285,300B

                                                  5.00*          5.00*

                                  BED        4,952,266N     4,952,266N

                                  BED        6,083,138V        59,468V

 

19.  BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

                                                  1.50*          1.50*

OPERATING                         BED        1,049,658A     1,049,658A

                                                  1.50*          1.50*

                                  BED        3,755,410B     3,755,410B

                                  BED        5,521,710N     5,521,710N

                                  BED        1,500,000W     1,500,000W

INVESTMENT CAPITAL                BED          734,000B              B

 

20.  BED145 - HAWAII STRATEGIC DEVELOPMENT CORPORATION

OPERATING                         BED        2,608,516B     2,608,516B

                                  BED        4,218,756W     4,218,756W

 

21.  BED146 - NATURAL ENERGY LAB OF HAWAII AUTHORITY

OPERATING                         BED        7,672,917B     7,672,917B

                                  BED        9,926,408N     9,926,408N

INVESTMENT CAPITAL                BED        3,500,000C              C

 

22.  LNR141 - WATER AND LAND DEVELOPMENT

                                                  2.00*          2.00*

OPERATING                         LNR          250,828A       250,828A

                                                  2.00*          2.00*

                                  LNR          325,168B       325,168B

                                  LNR          188,181W       188,181W

INVESTMENT CAPITAL                LNR        3,740,000C     2,500,000C

 

23.  BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

                                                  2.00*          2.00*

OPERATING                         BED        1,086,818W     1,086,818W

INVESTMENT CAPITAL                BED        1,855,000C     1,855,000C

 

24.  BED160 - HAWAII HOUSING FINANCE AND DEVELOPMENT CORP

OPERATING                         BED        9,677,735N     9,677,735N

                                  BED       21,923,698T    21,923,698T

                                                 31.00*         31.00*

                                  BED        6,874,086W     6,874,086W

INVESTMENT CAPITAL                BED       43,000,000C     5,000,000C

 

25.  BED128 - OFFICE OF AEROSPACE

OPERATING                         BED           78,984A        78,984A

 


 

B.  EMPLOYMENT

1.   LBR111 - WORKFORCE DEVELOPMENT PROGRAM

                                                  0.20*          0.20*

OPERATING                         LBR          101,259A       101,259A

                                  LBR        5,940,010B     5,940,010B

                                                116.80*        116.80*

                                  LBR       50,768,891N    50,768,891N

                                  LBR        1,505,580U     1,505,580U

 

2.   LBR135 - WORKFORCE DEVELOPMENT COUNCIL

                                                  1.00*          1.00*

OPERATING                         LBR           11,577A        11,577A

                                  LBR          492,261N       492,261N

 

3.   LBR171 - UNEMPLOYMENT INSURANCE PROGRAM

OPERATING                         LBR      623,391,310B   361,191,310B

                                                243.50*        243.50*

                                  LBR       18,152,181N    18,152,181N

 

4.   LBR903 - OFFICE OF COMMUNITY SERVICES

                                                  2.00*          2.00*

OPERATING                         LBR        1,841,633A     1,841,633A

                                                  2.00*          2.00*

                                  LBR        5,882,044N     5,882,044N

                                  LBR        1,200,000U     1,200,000U

INVESTMENT CAPITAL                LBR        8,310,000C              C

 

5.   LBR905 - HI CAREER (KOKUA) INFORMATION DELIVERY SYS

OPERATING                         LBR          204,513A       204,513A

                                  LBR          143,372N       143,372N

 

6.   HMS802 - VOCATIONAL REHABILITATION

                                                 23.41*         23.41*

OPERATING                         HMS        3,516,863A     3,516,863A

                                                 81.09*         81.09*

                                  HMS       13,440,880N    13,440,880N

                                  HMS        1,330,200W     1,330,200W

INVESTMENT CAPITAL                HMS          497,000C              C

 

7.   LBR143 - HAWAII OCCUPATIONAL SAFETY AND HEALTH PROGRAM

                                                 26.50*         26.50*

OPERATING                         LBR        1,498,757A     1,498,757A

                                                 16.50*         16.50*

                                  LBR        1,830,524N     1,830,524N

                                  LBR           70,000W        70,000W

 

8.   LBR152 - WAGE STANDARDS PROGRAM

                                                 18.00*         18.00*

OPERATING                         LBR        1,051,219A     1,051,219A

 

9.   LBR153 - HAWAII CIVIL RIGHTS COMMISSION

                                                 17.50*         17.50*

OPERATING                         LBR        1,111,480A     1,111,480A

                                                  4.50*          4.50*

                                  LBR          600,287N       600,287N

 

10.  LBR183 - DISABILITY COMPENSATION PROGRAM

                                                 81.00*         81.00*

OPERATING                         LBR        4,237,423A     4,237,423A

                                                  8.00*          8.00*

                                  LBR       23,791,406B    23,791,406B

 

11.  LBR316 - OFFICE OF LANGUAGE ACCESS

                                                  3.00*          3.00*

OPERATING                         LBR          312,228A       312,228A

 

12.  LBR161 - HAWAII LABOR RELATIONS BOARD

                                                  1.00*          1.00*

OPERATING                         LBR          568,548A       568,548A

 

13.  LBR812 - LABOR AND INDUSTRIAL RELATIONS APPEALS BOARD

                                                  9.00*          9.00*

OPERATING                         LBR          782,657A       782,657A

 

14.  LBR871 - EMPLOYMENT SECURITY APPEALS REFEREES' OFFICE

                                                 10.80*         10.80*

OPERATING                         LBR          809,372N       809,372N

 

15.  LBR901 - DATA GATHERING, RESEARCH, AND ANALYSIS

                                                  4.38*          4.38*

OPERATING                         LBR          303,933A       303,933A

                                                 27.62*         27.62*

                                  LBR        2,418,373N     2,418,373N

 

16.  LBR902 - GENERAL ADMINISTRATION

                                                 19.52*         19.52*

OPERATING                         LBR        1,247,936A     1,247,936A

                                                 27.06*         27.06*

                                  LBR        2,763,168N     2,763,168N

 


 

C.  TRANSPORTATION FACILITIES

1.   TRN102 - HONOLULU INTERNATIONAL AIRPORT

                                                586.50*        586.50*

OPERATING                         TRN      116,915,768B   116,915,768B

                                  TRN        1,000,000N     1,000,000N

INVESTMENT CAPITAL                TRN       20,287,000E    27,188,000E

                                  TRN       40,725,000N    44,512,000N

                                  TRN        6,400,000X    16,000,000X

 

2.   TRN104 - GENERAL AVIATION

                                                 30.00*         30.00*

OPERATING                         TRN        5,946,642B     5,946,642B

                                  TRN          330,000N              N

INVESTMENT CAPITAL                TRN        2,375,000B       775,000B

                                  TRN        7,750,000N     7,750,000N

 

3.   TRN111 - HILO INTERNATIONAL AIRPORT

                                                 82.00*         82.00*

OPERATING                         TRN       13,435,989B    13,430,989B

                                  TRN        2,375,000N     1,000,000N

INVESTMENT CAPITAL                TRN        2,500,000B              B

                                  TRN       14,000,000E       900,000E

                                  TRN                 N     8,550,000N

 

4.   TRN114 - KONA INTERNATIONAL AIRPORT AT KEAHOLE

                                                 85.00*         85.00*

OPERATING                         TRN       15,506,905B    15,513,450B

                                  TRN          475,000N     1,000,000N

 

5.   TRN116 - WAIMEA-KOHALA AIRPORT

                                                  6.00*          6.00*

OPERATING                         TRN          873,712B       867,167B

                                  TRN          283,000N       500,000N

 

6.   TRN118 - UPOLU AIRPORT

OPERATING                         TRN          239,500B       239,500B

                                  TRN          249,000N       500,000N

 

7.   TRN131 - KAHULUI AIRPORT

                                                151.00*        151.00*

OPERATING                         TRN       23,636,119B    23,631,119B

                                  TRN        1,000,000N     1,000,000N

INVESTMENT CAPITAL                TRN        1,500,000B              B

                                  TRN       18,995,000E     6,000,000E

                                  TRN       11,625,000N              N

 

8.   TRN133 - HANA AIRPORT

                                                  9.00*          9.00*

OPERATING                         TRN          696,912B       696,912B

                                  TRN          373,500N              N

 

9.   TRN135 - KAPALUA AIRPORT

                                                 11.00*         11.00*

OPERATING                         TRN        1,846,635B     1,846,635B

INVESTMENT CAPITAL                TRN                 E       113,000E

 

10.  TRN141 - MOLOKAI AIRPORT

                                                 13.00*         13.00*

OPERATING                         TRN        2,262,129B     2,262,129B

                                  TRN        3,325,000N     1,000,000N

 

11.  TRN143 - KALAUPAPA AIRPORT

                                                  9.00*          9.00*

OPERATING                         TRN          780,691B       730,691B

                                  TRN          350,000N              N

 

12.  TRN151 - LANAI AIRPORT

                                                 10.00*         10.00*

OPERATING                         TRN        1,982,364B     2,462,364B

                                  TRN          950,000N     1,000,000N

INVESTMENT CAPITAL                TRN        2,825,000B              B

                                  TRN       32,286,000N              N

 

13.  TRN161 - LIHUE AIRPORT

                                                101.00*        101.00*

OPERATING                         TRN       14,751,779B    14,751,779B

                                  TRN          475,000N     1,000,000N

INVESTMENT CAPITAL                TRN        5,700,000E     9,380,000E

                                  TRN                 N    20,520,000N

 

14.  TRN163 - PORT ALLEN AIRPORT

OPERATING                         TRN           19,841B        26,841B

                                  TRN          340,000N              N

 

15.  TRN195 - AIRPORTS ADMINISTRATION

                                                111.00*        111.00*

OPERATING                         TRN      124,510,416B   141,124,063B

INVESTMENT CAPITAL                TRN       11,450,000B    12,850,000B

                                  TRN        7,500,000N     7,500,000N

                                  TRN          100,000X       100,000X

 

16.  TRN301 - HONOLULU HARBOR

                                                116.00*        116.00*

OPERATING                         TRN       24,115,612B    24,115,612B

 

17.  TRN303 - KALAELOA BARBERS POINT HARBOR

                                                  3.00*          3.00*

OPERATING                         TRN        2,104,534B     2,104,534B

 

18.  TRN311 - HILO HARBOR

                                                 14.00*         14.00*

OPERATING                         TRN        2,375,457B     2,375,457B

INVESTMENT CAPITAL                TRN          750,000B              B

 

19.  TRN313 - KAWAIHAE HARBOR

                                                  2.00*          2.00*

OPERATING                         TRN        1,234,031B     1,234,031B

 

20.  TRN331 - KAHULUI HARBOR

                                                 18.00*         18.00*

OPERATING                         TRN        3,427,632B     3,427,632B

INVESTMENT CAPITAL                TRN       48,400,000E              E

 

21.  TRN341 - KAUNAKAKAI HARBOR

                                                  1.00*          1.00*

OPERATING                         TRN          606,144B       606,144B

 

22.  TRN361 - NAWILIWILI HARBOR

                                                 15.00*         15.00*

OPERATING                         TRN        2,807,157B     2,807,157B

 

23.  TRN363 - PORT ALLEN HARBOR

                                                  1.00*          1.00*

OPERATING                         TRN          393,619B       393,619B

 

24.  TRN351 - KAUMALAPAU HARBOR

OPERATING                         TRN          259,837B       259,837B

 

25.  TRN395 - HARBORS ADMINISTRATION

                                                 71.00*         71.00*

OPERATING                         TRN       53,223,480B    53,252,339B

INVESTMENT CAPITAL                TRN        7,502,000B     3,500,000B

                                  TRN        9,235,000E     1,735,000E

                                  TRN        4,003,000N              N

 

26.  TRN333 - HANA HARBOR

OPERATING                         TRN           42,519B        42,519B

 

27.  TRN501 - OAHU HIGHWAYS

                                                225.00*        225.00*

OPERATING                         TRN       82,971,062B    98,714,062B

                                  TRN        2,200,000N     2,200,000N

INVESTMENT CAPITAL                TRN       24,193,000E     5,534,000E

                                  TRN       45,947,000N    11,554,000N

 

28.  TRN511 - HAWAII HIGHWAYS

                                                124.00*        124.00*

OPERATING                         TRN       22,557,598B    29,557,598B

INVESTMENT CAPITAL                TRN       12,195,000E     2,040,000E

                                  TRN       22,380,000N     8,160,000N

 

29.  TRN531 - MAUI HIGHWAYS

                                                 81.00*         81.00*

OPERATING                         TRN       22,588,385B    30,970,902B

INVESTMENT CAPITAL                TRN       24,292,000E     5,740,000E

                                  TRN       19,720,000N     8,260,000N

                                  TRN        1,500,000S              S

 

30.  TRN561 - KAUAI HIGHWAYS

                                                 51.00*         51.00*

OPERATING                         TRN       13,283,171B    18,283,171B

INVESTMENT CAPITAL                TRN       23,510,000E    14,290,000E

                                  TRN       23,120,000N    15,160,000N

                                  TRN        4,500,000S              S

 

31.  TRN595 - HIGHWAYS ADMINISTRATION

                                                 83.00*         83.00*

OPERATING                         TRN       79,904,352B    78,549,288B

                                  TRN        1,757,957N     1,757,957N

INVESTMENT CAPITAL                TRN       12,000,000B    12,000,000B

                                  TRN       20,760,000E    21,740,000E

                                  TRN       17,740,000N    38,160,000N

 

32.  TRN597 - HIGHWAY SAFETY

                                                 33.00*         33.00*

OPERATING                         TRN        6,847,705B     6,847,705B

                                                  7.00*          7.00*

                                  TRN        5,945,280N     5,945,280N

 

33.  TRN995 - GENERAL ADMINISTRATION

                                                104.00*        104.00*

OPERATING                         TRN       14,946,700B    14,946,700B

                                  TRN       33,322,783N    33,322,783N

                                  TRN          423,067R       423,067R

 


 

D.  ENVIRONMENTAL PROTECTION

1.   HTH840 - ENVIRONMENTAL MANAGEMENT

                                                 36.00*         36.00*

OPERATING                         HTH        2,604,474A     2,604,474A

                                                 60.00*         60.00*

                                  HTH       80,627,387B    80,627,387B

                                                 44.80*         44.80*

                                  HTH        9,167,057N     9,167,057N

                                                 56.20*         56.20*

                                  HTH      164,949,186W   164,945,186W

INVESTMENT CAPITAL                HTH        5,872,000C     5,872,000C

                                  HTH       29,354,000N    29,354,000N

 

2.   AGR846 - PESTICIDES

                                                  8.00*          8.00*

OPERATING                         AGR          496,810A       496,810A

                                                  2.00*          2.00*

                                  AGR          475,561N       475,561N

                                                  8.00*          8.00*

                                  AGR        1,101,976W     1,101,976W

 

3.   LNR401 - AQUATIC RESOURCES

                                                 27.00*         27.00*

OPERATING                         LNR        2,384,172A     2,384,172A

                                                  1.00*          1.00*

                                  LNR        3,478,709N     3,478,709N

INVESTMENT CAPITAL                LNR        1,000,000C              C

 

4.   LNR402 - NATIVE RESOURCES AND FIRE PROTECTION PROGRAM

                                                 49.50*         49.50*

OPERATING                         LNR        3,722,025A     3,722,025A

                                  LNR        3,470,749B     3,405,749B

                                                  6.50*          6.50*

                                  LNR        5,151,190N     5,148,690N

INVESTMENT CAPITAL                LNR        1,180,000C     2,500,000C

 

5.   LNR404 - WATER RESOURCES

                                                 19.00*         19.00*

OPERATING                         LNR        2,335,185A     2,335,185A

                                                  3.00*          3.00*

                                  LNR          426,818B       426,818B

 

6.   LNR405 - CONSERVATION AND RESOURCES ENFORCEMENT

                                                114.25*        114.25*

OPERATING                         LNR        6,644,604A     6,644,604A

                                                 18.00*         18.00*

                                  LNR        1,626,083B     1,626,083B

                                                  1.75*          1.75*

                                  LNR          768,114N       768,114N

                                                  1.00*          1.00*

                                  LNR          108,114W       108,114W

INVESTMENT CAPITAL                LNR          280,000C       120,000C

 

7.   LNR407 - NATURAL AREA RESERVES AND WATERSHED MANAGEMENT

                                                 19.00*         19.00*

OPERATING                         LNR          812,151A       812,151A

                                                  5.50*          5.50*

                                  LNR        7,660,731B     7,195,731B

                                                  0.50*          0.50*

                                  LNR        1,638,030N     1,638,030N

 

8.   HTH850 - OFFICE OF ENVIRONMENTAL QUALITY CONTROL

                                                  5.00*          5.00*

OPERATING                         HTH          344,488A       344,488A

 

9.   LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

                                                 31.00*         31.00*

OPERATING                         LNR        2,340,578A     1,865,578A

                                                 11.00*         11.00*

                                  LNR          986,801B       986,801B

INVESTMENT CAPITAL                LNR       10,340,000C     2,540,000C

 

10.  HTH849 - ENVIRONMENTAL HEALTH ADMINISTRATION

                                                 10.00*         10.00*

OPERATING                         HTH          893,616A       893,616A

                                                  0.50*          0.50*

                                  HTH           48,271B        48,271B

                                                 14.50*         14.50*

                                  HTH        3,201,314N     3,201,314N

                                                 14.00*         14.00*

                                  HTH        3,315,298W     3,315,298W

 


 

E.  HEALTH

1.   HTH100 - COMMUNICABLE DISEASE SERVICES

                                                 99.00*         99.00*

OPERATING                         HTH       13,388,725A    13,388,725A

                                                 16.50*         16.50*

                                  HTH        8,407,452N     8,407,452N

 

2.   HTH131 - DISEASE OUTBREAK CONTROL

                                                 20.60*         20.60*

OPERATING                         HTH        1,613,768A     1,613,768A

                                                 34.40*         34.40*

                                  HTH       10,473,680N    10,473,680N

 

3.   HTH141 - GENERAL MEDICAL AND PREVENTIVE SERVICES

                                                166.87*        166.87*

OPERATING                         HTH       12,480,474A    12,480,474A

                                  HTH           90,720B        90,720B

                                  HTH          131,746U       131,746U

 

4.   HTH730 - EMERGENCY MEDICAL SERVICES AND INJURY PREVENTION SYSTEM

                                                 13.00*         13.00*

OPERATING                         HTH       56,691,251A    56,691,251A

                                  HTH       20,072,874B    20,072,874B

                                                  3.00*          3.00*

                                  HTH        3,807,055N     3,814,055N

 

5.   HTH560 - FAMILY HEALTH

                                                108.00*        108.00*

OPERATING                         HTH       23,985,044A    23,985,044A

                                                 13.50*         13.50*

                                  HTH       13,955,451B    13,955,451B

                                                181.50*        181.50*

                                  HTH       49,038,560N    49,038,560N

                                                  0.50*          0.50*

                                  HTH        1,868,031U     1,868,031U

 

6.   HTH590 - TOBACCO SETTLEMENT

                                                  1.00*          1.00*

OPERATING                         HTH           64,114A        64,114A

                                                 38.00*         38.00*

                                  HTH       50,319,643B    50,319,643B

                                                 11.00*         11.00*

                                  HTH        4,833,514N     4,833,514N

                                  HTH        4,673,541U     4,673,541U

 

7.   HTH595 - HEALTH RESOURCES ADMINISTRATION

                                                  2.00*          2.00*

OPERATING                         HTH          150,379A       150,379A

INVESTMENT CAPITAL                HTH        6,000,000C              C

 

8.   HTH210 - HAWAII HEALTH SYSTEMS CORPORATION – CORPORATE OFFICE

                                                 54.50*         54.50*

OPERATING                         HTH       12,509,280B    12,509,280B

INVESTMENT CAPITAL                HTH        1,340,000C              C

 

9.   HTH211 - KAHUKU HOSPITAL

OPERATING                         HTH        1,500,000A     1,500,000A

 

10.  HTH212 - HAWAII HEALTH SYSTEMS CORPORATION –  REGIONS

OPERATING                         HTH       82,140,000A    82,140,000A

                                              2,780.75*      2,780.75*

                                  HTH       508,583,900B   508,583,900B

INVESTMENT CAPITAL                HTH       25,000,000C    15,000,000C

 

11.  HTH213 - ALII COMMUNITY CARE

OPERATING                         HTH        1,500,000B     1,500,000B

 

12.  HTH420 - ADULT MENTAL HEALTH - OUTPATIENT

                                                145.50*        145.50*

OPERATING                         HTH       74,000,162A    74,060,662A

                                  HTH       11,670,500B    11,610,000B

                                  HTH        1,632,230N     1,632,230N

 

13.  HTH430 - ADULT MENTAL HEALTH - INPATIENT

                                                615.00*        615.00*

OPERATING                         HTH       52,895,657A    52,895,657A

INVESTMENT CAPITAL                AGS       11,614,000C              C

 

14.  HTH440 - ALCOHOL AND DRUG ABUSE

                                                 22.00*         22.00*

OPERATING                         HTH       18,375,362A    18,375,362A

                                  HTH          300,000B       300,000B

                                                  6.00*          6.00*

                                  HTH       13,609,867N    13,609,867N

 

15.  HTH460 - CHILD AND ADOLESCENT MENTAL HEALTH

                                                168.50*        168.50*

OPERATING                         HTH       40,811,045A    40,859,131A

                                                 17.00*         17.00*

                                  HTH       15,033,910B    14,985,824B

                                  HTH        4,439,309N     4,439,309N

                                  HTH        2,264,888U     2,264,888U

 

16.  HTH501 - DEVELOPMENTAL DISABILITIES

                                                191.75*        191.75*

OPERATING                         HTH       68,439,167A    69,737,652A

                                                  3.00*          3.00*

                                  HTH        1,038,992B     1,038,992B

 

17.  HTH495 - BEHAVIORAL HEALTH ADMINISTRATION

                                                 57.50*         57.50*

OPERATING                         HTH        6,882,191A     6,882,191A

                                  HTH        3,557,363N     3,557,363N

 

18.  HTH610 - ENVIRONMENTAL HEALTH SERVICES

                                                 98.00*         98.00*

OPERATING                         HTH        5,652,031A     5,652,031A

                                                 13.00*         13.00*

                                  HTH        1,376,633B     1,316,633B

                                                  6.00*          6.00*

                                  HTH          594,682N       594,682N

                                                  1.00*          1.00*

                                  HTH           55,481U        55,481U

 

19.  HTH710 - STATE LABORATORY SERVICES

                                                 72.00*         72.00*

OPERATING                         HTH        6,080,558A     6,080,558A

                                  HTH          497,363N       497,363N

 

20.  HTH720 - HEALTH CARE ASSURANCE

                                                 20.90*         20.90*

OPERATING                         HTH        1,508,133A     1,508,133A

                                  HTH          406,000B       406,000B

                                                 19.90*         19.90*

                                  HTH        1,659,515N     1,659,515N

 

21.  HTH906 - STATE HEALTH PLANNING AND DEVELOPMENT AGENCY

                                                  8.00*          8.00*

OPERATING                         HTH          508,814A       508,814A

                                  HTH          114,000B       114,000B

 

22.  HTH760 - HEALTH STATUS MONITORING

                                                 29.50*         29.50*

OPERATING                         HTH        1,382,629A     1,410,190A

                                  HTH          587,271B       587,271B

                                                  4.00*          4.00*

                                  HTH          264,516N       264,516N

 

23.  HTH905 - DEVELOPMENTAL DISABILITIES COUNCIL

                                                  1.50*          1.50*

OPERATING                         HTH          218,048A       218,048A

                                                  6.50*          6.50*

                                  HTH          478,797N       478,797N

 

24.  HTH907 - GENERAL ADMINISTRATION

                                                118.50*        118.50*

OPERATING                         HTH        8,027,259A     8,027,259A

                                  HTH        1,051,850N     1,051,850N

INVESTMENT CAPITAL                AGS       13,510,000C     5,431,000C

 


 

F.  SOCIAL SERVICES

1.   HMS301 - CHILD PROTECTIVE SERVICES

                                                222.88*        222.88*

OPERATING                         HMS       21,497,187A    21,497,187A

                                  HMS          617,587B       617,587B

                                                202.62*        202.62*

                                  HMS       38,685,170N    38,685,170N

 

2.   HMS302 - GENERAL SUPPORT FOR CHILD CARE

                                                 21.07*         21.07*

OPERATING                         HMS          996,913A       996,913A

                                                 14.93*         14.93*

                                  HMS       10,945,263N    10,945,263N

 

3.   HMS303 - CHILD PROTECTIVE SERVICES PAYMENTS

OPERATING                         HMS       41,816,013A    41,816,013A

                                  HMS       20,095,666N    20,095,666N

 

4.   HMS305 - CASH SUPPORT FOR CHILD CARE

OPERATING                         HMS       15,011,811A    15,011,811A

                                  HMS       38,530,754N    38,530,754N

 

5.   HMS501 - IN-COMMUNITY YOUTH PROGRAMS

                                                 12.00*         12.00*

OPERATING                         HMS        7,243,874A     7,243,874A

                                  HMS        3,657,363N     3,657,363N

 

6.   HMS503 - HAWAII YOUTH CORRECTIONAL FACILITY (HYCF)

                                                124.00*        124.00*

OPERATING                         HMS       10,078,850A    10,043,850A

 

7.   DEF112 - SERVICES TO VETERANS

                                                 24.00*         24.00*

OPERATING                         DEF        2,358,443A     4,913,716A

INVESTMENT CAPITAL                DEF        8,220,000C     3,534,000C

                                  DEF            2,000N         1,000N

 

8.   HMS601 - ADULT AND COMMUNITY CARE SERVICES

                                                 62.42*         62.42*

OPERATING                         HMS        5,480,824A     5,480,824A

                                                  6.58*          6.58*

                                  HMS        5,005,123N     5,005,123N

                                  HMS           10,000R        10,000R

                                  HMS          382,003U       382,003U

 

9.   HMS202 - AGED, BLIND AND DISABLED PAYMENTS

OPERATING                         HMS        4,029,480A     4,029,480A

 

10.  HMS204 - GENERAL ASSISTANCE PAYMENTS

OPERATING                         HMS       21,289,056A    21,289,056A

 

11.  HMS206 - FEDERAL ASSISTANCE PAYMENTS

OPERATING                         HMS        5,108,943N     5,108,943N

 

12.  HMS211 - CASH SUPPORT FOR FAMILIES - SELF-SUFFICIENCY

OPERATING                         HMS       26,073,079A    22,694,156A

                                  HMS       44,000,000N    44,000,000N

 

13.  HMS220 - RENTAL HOUSING SERVICES

OPERATING                         HMS        4,401,556A     4,301,556A

                                                171.00*        171.00*

                                  HMS       36,142,225N    35,470,497N

                                                 13.00*         13.00*

                                  HMS        4,112,106W     4,062,106W

INVESTMENT CAPITAL                HMS       37,670,000C    40,800,000C

 

14.  HMS229 - HPHA ADMINISTRATION

                                                 71.00*         71.00*

OPERATING                         HMS       34,769,688N    34,769,688N

                                                 17.00*         17.00*

                                  HMS        2,558,320W     2,558,320W

 

15.  HMS222 - RENTAL ASSISTANCE SERVICES

                                                  1.25*          1.25*

OPERATING                         HMS        1,059,030A     1,059,030A

                                                 16.75*         16.75*

                                  HMS       25,875,685N    25,875,685N

 

16.  HMS224 - HOMELESS SERVICES

                                                  4.00*          4.00*

OPERATING                         HMS       15,525,824A    15,525,824A

                                  HMS        1,369,108N     1,369,108N

 

17.  HMS605 - COMMUNITY-BASED RESIDENTIAL SUPPORT

OPERATING                         HMS       17,125,395A    17,125,395A

 

18.  HMS401 - HEALTH CARE PAYMENTS

OPERATING                         HMS      785,583,342A   787,466,250A

                                  HMS      847,877,988N   870,295,801N

                                  HMS       12,000,000U    12,000,000U

 

19.  HMS236 - CASE MANAGEMENT FOR SELF-SUFFICIENCY

                                                310.66*        310.66*

OPERATING                         HMS       13,241,512A    13,241,512A

                                                244.34*        244.34*

                                  HMS       18,821,328N    18,821,328N

 

20.  HMS238 - DISABILITY DETERMINATION

                                                 45.00*         45.00*

OPERATING                         HMS        7,335,374N     7,335,374N

 

21.  ATG500 - CHILD SUPPORT ENFORCEMENT SERVICES

                                                 81.94*         81.94*

OPERATING                         ATG        3,859,392A     3,859,392A

                                                159.06*        159.06*

                                  ATG       14,911,287N    14,911,287N

                                  ATG        2,231,224T     2,231,224T

 

22.  HMS237 - EMPLOYMENT AND TRAINING

OPERATING                         HMS          469,505A       469,505A

                                  HMS          699,734N       699,734N

 

23.  HHL602 - PLANNING AND DEVELOPMENT FOR HAWAIIAN HOMESTEADS

                                                115.00*        115.00*

OPERATING                         HHL       13,030,827B    13,030,827B

                                                  3.00*          3.00*

                                  HHL       15,341,820N    15,341,820N

                                                 82.00*         82.00*

                                  HHL      157,091,393T   157,091,393T

INVESTMENT CAPITAL                HHL        5,000,000C              C

                                  HHL       20,000,000N    20,000,000N

 

24.  HTH904 - EXECUTIVE OFFICE ON AGING

                                                  5.74*          5.74*

OPERATING                         HTH        5,948,402A     5,948,402A

                                                  8.26*          8.26*

                                  HTH        7,802,796N     7,533,492N

INVESTMENT CAPITAL                HTH          500,000C              C

 

25.  HTH520 - DISABILITY AND COMMUNICATIONS ACCESS BOARD

                                                  5.00*          5.00*

OPERATING                         HTH        1,230,625A     1,230,625A

                                  HTH           10,000B        10,000B

                                                  2.00*          2.00*

                                  HTH          195,776U       195,776U

 

26.  HMS902 - GENERAL SUPPORT FOR HEALTH CARE PAYMENTS

                                                121.67*        121.67*

OPERATING                         HMS        9,337,999A     6,458,643A

                                                117.33*        117.33*

                                  HMS       44,849,236N    18,845,032N

 

27.  HMS903 - GENERAL SUPPORT FOR SELF-SUFFICIENCY SERVICES

                                                 34.05*         34.05*

OPERATING                         HMS       49,536,954A    21,786,954A

                                                 38.95*         38.95*

                                  HMS       62,928,283N    62,928,283N

 

28.  HMS904 - GENERAL ADMINISTRATION (DHS)

                                                141.50*        141.50*

OPERATING                         HMS        7,102,509A     7,125,297A

                                                 13.50*         13.50*

                                  HMS        1,347,016N     1,347,016N

 

29.  HMS901 - GENERAL SUPPORT FOR SOCIAL SERVICES

                                                 10.22*         10.22*

OPERATING                         HMS        1,774,170A     1,774,170A

                                                  5.78*          5.78*

                                  HMS        1,539,447N     1,539,447N

 


 

G.  FORMAL EDUCATION

1.   EDN100 - SCHOOL-BASED BUDGETING

                                             12,552.60*     12,552.60*

OPERATING                         EDN      775,148,488A   775,148,488A

                                  EDN        7,530,000B     7,530,000B

                                  EDN      168,983,026N   167,399,091N

                                  EDN       28,990,000T    28,990,000T

                                  EDN        4,000,000U     4,000,000U

                                  EDN       28,525,743V              V

                                  EDN        3,389,438W     3,389,438W

INVESTMENT CAPITAL                EDN      144,336,000B   165,760,000B

                                  EDN          300,000C              C

 

2.   EDN150 - COMPREHENSIVE STUDENT SUPPORT SERVICES

                                              5,116.62*      5,116.62*

OPERATING                         EDN      322,144,665A   324,226,356A

                                  EDN          100,000B       100,000B

                                                  2.00*          2.00*

                                  EDN       45,714,379N    45,714,379N

                                                  4.00*          4.00*

                                  EDN        3,500,000W     3,500,000W

 

3.   EDN200 - INSTRUCTIONAL SUPPORT

                                                384.00*        384.00*

OPERATING                         EDN       45,745,674A    45,745,674A

                                                  6.00*          6.00*

                                  EDN        2,000,000B     2,000,000B

                                  EDN          687,000N       687,000N

                                  EDN          250,000U       250,000U

                                  EDN       19,356,874V    20,073,434V

 

4.   EDN300 - STATE ADMINISTRATION

                                                449.00*        449.00*

OPERATING                         EDN       43,344,985A    43,344,985A

                                  EDN           35,000N        35,000N

 

5.   EDN400 - SCHOOL SUPPORT

                                                640.00*        640.00*

OPERATING                         EDN      174,109,976A   154,109,976A

                                                726.50*        726.50*

                                  EDN       33,827,160B    35,287,877B

                                                  3.00*          3.00*

                                  EDN       47,240,109N    49,527,115N

                                                  4.00*          4.00*

                                  EDN       12,522,625W    12,522,325W

INVESTMENT CAPITAL                EDN        5,200,000B     5,200,000B

 

6.   EDN500 - SCHOOL COMMUNITY SERVICES

                                                 31.50*         31.50*

OPERATING                         EDN        5,072,889A     5,072,889A

                                  EDN        3,631,000B     3,631,000B

                                  EDN          954,222N     1,410,849N

                                  EDN        4,000,000T     4,000,000T

                                  EDN        6,300,000U     6,300,000U

                                  EDN       10,995,000W    10,995,000W

 

7.   EDN600 - CHARTER SCHOOLS

OPERATING                         EDN       59,680,071A    63,007,613A

INVESTMENT CAPITAL                EDN        2,118,000C              C

 

8.   BUF745 - RETIREMENT BENEFITS PAYMENTS - DOE

OPERATING                         BUF      280,677,870A   277,200,000A

 

9.   BUF765 - HEALTH PREMIUM PAYMENTS - DOE

OPERATING                         BUF      236,284,465A   264,546,608A

 

10.  BUF725 - DEBT SERVICE PAYMENTS - DOE

OPERATING                         BUF      222,989,025A   264,173,610A

 

11.  AGS807 - SCHOOL R&M, NEIGHBOR ISLAND DISTRICTS

                                                 78.00*         78.00*

OPERATING                         AGS        4,470,406A     4,470,406A

                                  AGS        1,500,000U     1,500,000U

 

12.  EDN407 - PUBLIC LIBRARIES

                                                555.50*        555.50*

OPERATING                         EDN       28,847,163A    28,847,163A

                                  EDN        3,125,000B     3,125,000B

                                  EDN        1,365,244N     1,365,244N

INVESTMENT CAPITAL                EDN        3,075,000C     2,020,000C

 

13.  DEF114 - HAWAII NATIONAL GUARD YOUTH CHALLENGE ACADEMY

OPERATING                         DEF        1,570,882A     1,570,882A

                                  DEF        5,631,208N     5,631,208N

 

14.  UOH100 - UNIVERSITY OF HAWAII, MANOA

                                              3,421.12*      3,421.12*

OPERATING                         UOH      203,626,623A   203,626,623A

                                                293.25*        293.25*

                                  UOH      220,023,752B   228,475,255B

                                                 78.06*         78.06*

                                  UOH        5,821,702N     5,941,206N

                                                134.25*        134.25*

                                  UOH       72,091,625W    72,091,625W

INVESTMENT CAPITAL                UOH          700,000C              C

 

15.  UOH110 - UNIVERSITY OF HAWAII, JOHN A. BURNS SCHOOL OF MEDICINE

                                                198.22*        198.22*

OPERATING                         UOH       16,928,514A    16,928,514A

                                  UOH       13,408,949B    13,408,949B

                                  UOH        4,568,547W     4,568,547W

 

16.  UOH210 - UNIVERSITY OF HAWAII, HILO

                                                514.75*        514.75*

OPERATING                         UOH       30,414,945A    30,414,945A

                                                 95.00*         95.00*

                                  UOH       33,378,541B    33,426,134B

                                  UOH          394,018N       394,018N

                                                  8.50*          8.50*

                                  UOH        6,271,946W     6,271,946W

INVESTMENT CAPITAL                UOH       20,000,000C              C

                                  UOH       16,000,000E              E

                                  UOH        4,000,000N              N

 

17.  UOH220 - HAWAII SMALL BUSINESS DEVELOPMENT CENTER

OPERATING                         UOH          978,941A       978,941A

 

18.  UOH700 - UNIVERSITY OF HAWAII, WEST OAHU

                                                 93.00*         93.00*

OPERATING                         UOH        5,694,225A     5,694,225A

                                  UOH        6,897,408B     8,561,172B

                                  UOH           13,193N        13,193N

                                  UOH          327,958W       327,958W

INVESTMENT CAPITAL                UOH        2,500,000C              C

 

19.  UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

                                              1,831.00*      1,831.00*

OPERATING                         UOH      116,190,704A   116,190,704A

                                                 82.00*         82.00*

                                  UOH       85,655,448B    87,965,448B

                                                 15.60*         15.60*

                                  UOH        4,275,325N     4,394,828N

                                  UOH        5,041,211W     5,041,211W

INVESTMENT CAPITAL                UOH       32,013,000C     5,001,000C

 

20.  UOH900 - UNIVERSITY OF HAWAII, SYSTEM WIDE SUPPORT

                                                403.00*        403.00*

OPERATING                         UOH       11,862,050A    10,227,424A

                                                  8.00*          8.00*

                                  UOH       35,736,560B    35,736,560B

                                                  4.00*          4.00*

                                  UOH          909,175N       909,175N

                                                 15.00*         15.00*

                                  UOH       17,096,150W    17,131,574W

INVESTMENT CAPITAL                UOH       80,004,000C    13,977,000C

 

21.  BUF748 - RETIREMENT BENEFITS PAYMENTS - UH

OPERATING                         BUF      123,256,258A   122,684,000A

 

22.  BUF768 - HEALTH PREMIUM PAYMENTS - UH

OPERATING                         BUF       78,550,089A    88,092,504A

 

23.  BUF728 - DEBT SERVICE PAYMENTS - UH

OPERATING                         BUF       82,527,939A    97,770,299A

 


 

H.  CULTURE AND RECREATION

1.   UOH881 - UNIVERSITY OF HAWAII, AQUARIA

                                                 13.00*         13.00*

OPERATING                         UOH          611,256A       611,256A

                                                  7.00*          7.00*

                                  UOH        3,117,141B     3,117,141B

                                  UOH          996,499W       996,499W

 

2.   AGS881 - STATE FOUNDATION ON CULTURE AND THE ARTS

OPERATING                         AGS          936,332A       936,332A

                                                 15.50*         15.50*

                                  AGS        4,215,466B     4,215,466B

                                                  5.00*          5.00*

                                  AGS        1,306,936N     1,306,936N

                                  AGS          625,000U       625,000U

 

3.   AGS818 - KING KAMEHAMEHA CELEBRATION COMMISSION

OPERATING                         AGS           57,874T        57,874T

 

4.   LNR802 - HISTORIC PRESERVATION

                                                 17.00*         17.00*

OPERATING                         LNR        1,360,596A     1,285,596A

                                  LNR          151,228B       151,228B

                                  LNR          751,089N       746,089N

 

5.   LNR804 - FOREST AND OUTDOOR RECREATION

                                                 29.50*         29.50*

OPERATING                         LNR        1,251,336A     1,251,336A

                                                  6.50*          6.50*

                                  LNR          712,912B       712,912B

                                                  5.00*          5.00*

                                  LNR        1,921,072N     1,921,072N

                                  LNR          572,088W       572,088W

INVESTMENT CAPITAL                LNR        3,325,000C              C

 

6.   LNR805 - RECREATIONAL FISHERIES

                                                  7.00*          7.00*

OPERATING                         LNR          265,524A       265,524A

                                  LNR           76,131B        76,131B

                                  LNR        1,021,746N     1,021,746N

 

7.   LNR806 - PARKS ADMINISTRATION AND OPERATION

                                                 78.00*         78.00*

OPERATING                         LNR        4,214,163A     4,214,163A

                                                 38.00*         38.00*

                                  LNR        6,467,439B     6,467,439B

                                  LNR        1,218,456N     1,218,456N

INVESTMENT CAPITAL                LNR       31,075,000C    19,520,000C

                                  LNR          200,000N       200,000N

 

8.   LNR801 - OCEAN-BASED RECREATION

                                                104.00*        104.00*

OPERATING                         LNR       16,808,643B    16,808,643B

                                  LNR        1,001,411N     1,001,411N

INVESTMENT CAPITAL                LNR       13,825,000C     4,000,000C

                                  LNR        2,000,000E              E

                                  LNR        1,500,000N     1,000,000N

 

9.   AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

                                                 38.50*         38.50*

OPERATING                         AGS        8,944,121B     8,944,121B

INVESTMENT CAPITAL                AGS        5,150,000C     5,150,000C

 


 

I.  PUBLIC SAFETY

1.   PSD402 - HALAWA CORRECTIONAL FACILITY

                                                395.00*        395.00*

OPERATING                         PSD       22,526,784A    22,526,784A

                                  PSD           28,719W        28,719W

 

2.   PSD404 - WAIAWA CORRECTIONAL FACILITY

                                                110.00*        110.00*

OPERATING                         PSD        5,943,026A     5,943,026A

                                  PSD           15,000W        15,000W

 

3.   PSD405 - HAWAII COMMUNITY CORRECTIONAL CENTER

                                                163.00*        163.00*

OPERATING                         PSD        8,475,622A     8,475,622A

 

4.   PSD406 - MAUI COMMUNITY CORRECTIONAL CENTER

                                                185.00*        185.00*

OPERATING                         PSD        9,328,952A     9,328,952A

                                  PSD          209,721S       209,721S

 

5.   PSD407 - OAHU COMMUNITY CORRECTIONAL CENTER

                                                488.00*        488.00*

OPERATING                         PSD       26,897,053A    26,897,053A

                                  PSD           30,000W        30,000W

 

6.   PSD408 - KAUAI COMMUNITY CORRECTIONAL CENTER

                                                 68.00*         68.00*

OPERATING                         PSD        3,651,826A     3,651,826A

 

7.   PSD409 - WOMEN'S COMMUNITY CORRECTIONAL CENTER

                                                132.00*        132.00*

OPERATING                         PSD        6,473,553A     6,473,553A

 

8.   PSD410 - INTAKE SERVICE CENTERS

                                                 59.00*         59.00*

OPERATING                         PSD        3,275,470A     3,275,470A

 

9.   PSD420 - CORRECTIONS PROGRAM SERVICES

                                                164.00*        164.00*

OPERATING                         PSD       18,588,472A    18,588,472A

 

10.  PSD421 - HEALTH CARE

                                                196.10*        196.10*

OPERATING                         PSD       20,775,735A    20,775,735A

 

11.  PSD422 - HAWAII CORRECTIONAL INDUSTRIES

                                                  2.00*          2.00*

OPERATING                         PSD        9,987,705W     9,887,705W

 

12.  PSD808 - NON-STATE FACILITIES

                                                  9.00*          9.00*

OPERATING                         PSD       64,659,911A    64,659,911A

 

13.  PSD502 - NARCOTICS ENFORCEMENT

                                                 13.00*         13.00*

OPERATING                         PSD          954,449A       954,449A

                                  PSD          206,161N       206,161N

                                                  7.00*          7.00*

                                  PSD          682,964W       673,984W

 

14.  PSD503 - SHERIFF

                                                296.00*        296.00*

OPERATING                         PSD       13,213,117A    13,423,849A

                                                 59.00*         59.00*

                                  PSD        5,076,280U     5,076,280U

 

15.  PSD611 - ADULT PAROLE DETERMINATIONS

                                                  3.00*          3.00*

OPERATING                         PSD          216,988A       216,988A

 

16.  PSD612 - ADULT PAROLE SUPERVISION AND COUNSELING

                                                 55.00*         55.00*

OPERATING                         PSD        3,523,983A     3,523,983A

 

17.  PSD613 - CRIME VICTIM COMPENSATION COMMISSION

                                                  8.00*          8.00*

OPERATING                         PSD        1,892,173B     1,892,173B

                                  PSD           859,315N       859,315N

 

18.  PSD900 - GENERAL ADMINISTRATION

                                                137.00*        137.00*

OPERATING                         PSD       10,364,924A    10,364,924A

                                  PSD          667,984B       667,984B

                                  PSD           75,065T        75,065T

INVESTMENT CAPITAL                PSD        9,000,000C     8,000,000C

 

19.  ATG231 - STATE CRIMINAL JUSTICE INFORMATION AND IDENTIFICATION

                                                 26.50*         26.50*

OPERATING                         ATG        1,499,894A     1,499,894A

                                  ATG        2,005,443N     2,005,443N

                                                 30.50*         30.50*

                                  ATG        3,485,609W     3,185,609W

 

20.  LNR810 - PREVENTION OF NATURAL DISASTERS

                                                  8.50*          8.50*

OPERATING                         LNR        2,059,158B     2,059,158B

                                                  0.50*          0.50*

                                  LNR          560,602N       370,602N

 

21.  DEF110 - AMELIORATION OF PHYSICAL DISASTERS

                                                114.10*        114.10*

OPERATING                         DEF       10,606,579A    10,664,584A

                                                 99.65*         99.65*

                                  DEF       88,233,296N    85,298,962N

                                  DEF          464,458S       464,458S

                                  DEF       12,044,738U    12,044,738U

INVESTMENT CAPITAL                AGS          707,000C              C

                                  DEF        9,593,000C     6,700,000C

                                  AGS        1,046,000N              N

                                  DEF       47,026,000N    56,385,000N

 


 

J.  INDIVIDUAL RIGHTS

1.   CCA102 - CABLE TELEVISION

                                                  4.00*          4.00*

OPERATING                         CCA        1,786,537B     1,786,537B

 

2.   CCA103 - CONSUMER ADVOCATE FOR COMMUNICATION, UTILITIES, AND TRANSPORTATION SERVICES

                                                 23.00*         23.00*

OPERATING                         CCA        2,701,465B     3,003,599B

 

3.   CCA104 - FINANCIAL SERVICES REGULATION

                                                 34.00*         34.00*

OPERATING                         CCA        3,387,006B     3,384,920B

                                  CCA          110,000T       110,000T

 

4.   CCA105 - PROFESSIONAL AND VOCATIONAL LICENSING

                                                 52.00*         52.00*

OPERATING                         CCA        5,573,217B     5,573,217B

                                                  5.00*          5.00*

                                  CCA        2,086,311T     2,061,311T

 

5.   BUF901 - PUBLIC UTILITIES COMMISSION

                                                 62.00*         62.00*

OPERATING                         BUF       11,049,409B    11,386,174B

 

6.   CCA106 - INSURANCE REGULATORY SERVICES

                                                 81.00*         81.00*

OPERATING                         CCA       14,281,755B    14,281,755B

                                  CCA          200,000T       200,000T

 

7.   CCA110 - OFFICE OF CONSUMER PROTECTION

                                                 14.00*         14.00*

OPERATING                         CCA        1,573,840B     1,573,840B

                                  CCA          100,681T       100,681T

 

8.   AGR812 - MEASUREMENT STANDARDS

                                                  7.00*          7.00*

OPERATING                         AGR          384,525A       384,525A

 

9.   CCA111 - BUSINESS REGISTRATION AND SECURITIES REGULATION

                                                 70.00*         70.00*

OPERATING                         CCA        6,649,240B     6,649,240B

 

10.  CCA112 - REGULATED INDUSTRIES COMPLAINTS OFFICE

                                                 65.00*         65.00*

OPERATING                         CCA        5,579,836B     5,579,836B

 

11.  CCA191 - GENERAL SUPPORT

                                                 43.00*         43.00*

OPERATING                         CCA        6,383,469B     6,267,869B

 

12.  LTG105 - ENFORCEMENT OF INFORMATION PRACTICES

                                                  5.00*          5.00*

OPERATING                         LTG          401,935A       401,935A

 

13.  BUF151 - OFFICE OF THE PUBLIC DEFENDER

                                                 81.00*         81.00*

OPERATING                         BUF        9,795,299A     9,795,299A

 

14.  LNR111 - CONVEYANCES AND RECORDINGS

                                                 60.00*         60.00*

OPERATING                         LNR        4,129,966B     4,129,966B

 

15.  HMS888 - COMMISSION ON THE STATUS OF WOMEN

                                                  1.00*          1.00*

OPERATING                         HMS          161,915A       161,915A

 


 

K.  GOVERNMENT-WIDE SUPPORT

1.   GOV100 - OFFICE OF THE GOVERNOR

                                                 27.00*         27.00*

OPERATING                         GOV        3,176,357A     3,176,357A

                                  GOV           87,147T        87,147T

INVESTMENT CAPITAL                GOV            1,000C         1,000C

 

2.   LTG100 - OFFICE OF THE LIEUTENANT GOVERNOR

                                                  3.00*          3.00*

OPERATING                         LTG          646,188A       646,188A

 

3.   BED144 - STATEWIDE PLANNING AND COORDINATION

                                                 12.00*         12.00*

OPERATING                         BED        1,110,081A     1,110,081A

                                                  5.00*          5.00*

                                  BED        2,692,310N     2,692,310N

                                  BED        2,000,000W     2,000,000W

 

4.   BED103 - STATEWIDE LAND USE MANAGEMENT

                                                  5.00*          5.00*

OPERATING                         BED          488,771A       488,771A

 

5.   BED130 - ECONOMIC PLANNING AND RESEARCH

                                                 13.00*         13.00*

OPERATING                         BED          853,009A       853,009A

 

6.   BUF101 - DEPARTMENTAL ADMINISTRATION AND BUDGET DIVISION

                                                 39.25*         39.25*

OPERATING                         BUF       11,332,082A    11,154,203A

                                                  0.75*          0.75*

                                  BUF           31,343U        31,343U

INVESTMENT CAPITAL                BUF      569,836,000C   200,960,000C

 

7.   AGS871 - CAMPAIGN SPENDING COMMISSION

                                                  5.00*          5.00*

OPERATING                         AGS        1,108,051T     4,683,051T

 

8.   AGS879 - OFFICE OF ELECTIONS

                                                 17.50*         17.50*

OPERATING                         AGS        1,829,581A     2,636,469A

                                                  0.50*          0.50*

                                  AGS        7,473,714N     7,473,714N

 

9.   TAX100 - COMPLIANCE

                                                179.00*        179.00*

OPERATING                         TAX        8,786,865A     8,786,865A

 

10.  TAX105 - TAX SERVICES AND PROCESSING

                                                122.00*        122.00*

OPERATING                         TAX        6,209,621A     6,209,621A

 

11.  TAX107 - SUPPORTING SERVICES - REVENUE COLLECTION

                                                 72.00*         72.00*

OPERATING                         TAX        7,339,726A     7,030,556A

                                  TAX        1,057,875B     1,057,875B

INVESTMENT CAPITAL                TAX          333,000C              C

 

12.  AGS101 - ACCOUNTING SYSTEM DEVELOPMENT AND MAINTENANCE

                                                  6.00*          6.00*

OPERATING                         AGS          513,981A       513,981A

 

13.  AGS102 - EXPENDITURE EXAMINATION

                                                 16.00*         16.00*

OPERATING                         AGS        1,098,527A     1,098,527A

 

14.  AGS103 - RECORDING AND REPORTING

                                                 11.00*         11.00*

OPERATING                         AGS          694,124A       694,124A

 

15.  AGS104 - INTERNAL POST AUDIT

                                                  6.00*          6.00*

OPERATING                         AGS          441,975A       441,975A

 

16.  BUF115 - FINANCIAL ADMINISTRATION

                                                 11.00*         11.00*

OPERATING                         BUF        1,793,147A     1,793,147A

                                                  9.00*          9.00*

                                  BUF        7,018,984T     7,018,984T

                                                  1.00*          1.00*

                                  BUF           70,260U        70,260U

 

17.  BUF721 - DEBT SERVICE PAYMENTS

OPERATING                         BUF      258,583,782A   306,342,481A

 

18.  ATG100 - LEGAL SERVICES

                                                223.46*        223.46*

OPERATING                         ATG       17,712,629A    17,712,629A

                                                 22.52*         22.52*

                                  ATG        2,405,785B     2,405,785B

                                                 13.00*         13.00*

                                  ATG        8,539,330N     8,496,088N

                                                  0.50*          0.50*

                                  ATG        3,990,504T     3,990,504T

                                                 57.35*         57.35*

                                  ATG        9,381,701U     9,476,083U

                                  ATG        2,539,009V       744,959V

                                                  4.45*          4.45*

                                  ATG        3,114,984W     3,114,984W

 

19.  AGS131 - INFORMATION PROCESSING AND COMMUNICATION SERVICES

                                                115.00*        115.00*

OPERATING                         AGS       12,404,923A    12,671,645A

                                  AGS           74,410B        90,016B

                                                 33.00*         33.00*

                                  AGS        3,312,584U     3,312,584U

INVESTMENT CAPITAL                AGS        8,235,000C     8,135,000C

 

20.  AGS111 - ARCHIVES - RECORDS MANAGEMENT

                                                 16.00*         16.00*

OPERATING                         AGS          780,072A       780,072A

 

21.  AGS891 - WIRELESS ENHANCED 911 BOARD

OPERATING                         AGS       14,000,000B     9,000,000B

 

22.  HRD102 - WORK FORCE ATTRACTION, SELECTION, CLASSIFICATION, AND EFFECTIVENESS

                                                 81.00*         81.00*

OPERATING                         HRD       12,979,935A    12,979,935A

                                  HRD          700,000B       700,000B

                                  HRD        4,886,281U     4,886,281U

 

23.  HRD191 - SUPPORTING SERVICES – HUMAN RESOURCES DEV

                                                 11.00*         11.00*

OPERATING                         HRD        1,444,386A     1,444,386A

 

24.  BUF141 - EMPLOYEES’ RETIREMENT SYSTEM

                                                 99.00*         99.00*

OPERATING                         BUF       10,828,223X    10,828,223X

 

25.  BUF143 - HAWAII EMPLOYER - UNION TRUST FUND

                                                 36.00*         36.00*

OPERATING                         BUF        5,109,314T     5,104,514T

 

26.  BUF741 - RETIREMENT BENEFITS PAYMENTS

OPERATING                         BUF      189,315,975A   185,809,000A

 

27.  BUF761 - HEALTH PREMIUM PAYMENTS

OPERATING                         BUF      137,687,959A   160,386,311A

 

28.  LNR101 - PUBLIC LANDS MANAGEMENT

                                                 49.00*         49.00*

OPERATING                         LNR       12,308,577B    12,258,577B

                                  LNR           75,238N        75,238N

INVESTMENT CAPITAL                LNR        2,500,000S              S

 

29.  AGS203 - STATE RISK MANAGEMENT AND INSURANCE ADMINISTRATION

OPERATING                         AGS        6,987,995A     6,987,995A

                                                  4.00*          4.00*

                                  AGS       25,285,334W    25,285,334W

 

30.  AGS211 - LAND SURVEY

                                                 10.00*         10.00*

OPERATING                         AGS          646,586A       646,586A

                                  AGS          285,000U       285,000U

 

31.  AGS223 - OFFICE LEASING

                                                  4.00*          4.00*

OPERATING                         AGS       10,613,034A    10,613,034A

                                  AGS        5,500,000U     5,500,000U

 

32.  AGS221 - PUBLIC WORKS - PLANNING, DESIGN, AND CONSTRUCTION

                                                 16.00*         16.00*

OPERATING                         AGS        1,199,707A     1,199,707A

                                  AGS        4,000,000W     4,000,000W

INVESTMENT CAPITAL                AGS       46,004,000C    23,365,000C

                                  AGS        3,261,000R              R

 

33.  AGS231 - CENTRAL SERVICES - CUSTODIAL SERVICES

                                                117.00*        117.00*

OPERATING                         AGS       15,228,845A    14,628,845A

                                  AGS           58,744B        58,744B

                                  AGS        1,099,084U     1,099,084U

 

34.  AGS232 - CENTRAL SERVICES - GROUNDS MAINTENANCE

                                                 27.00*         27.00*

OPERATING                         AGS        1,652,934A     1,652,934A

 

35.  AGS233 - CENTRAL SERVICES - BUILDING REPAIRS AND ALTERATIONS

                                                 33.00*         33.00*

OPERATING                         AGS        2,860,134A     2,860,134A

 

36.  AGS240 - STATE PROCUREMENT

                                                 22.00*         22.00*

OPERATING                         AGS        1,014,722A     1,126,903A

 

37.  AGS244 - SURPLUS PROPERTY MANAGEMENT

                                                  5.00*          5.00*

OPERATING                         AGS        1,798,996W     1,798,996W

 

38.  AGS251 - AUTOMOTIVE MANAGEMENT - MOTOR POOL

                                                 12.50*         12.50*

OPERATING                         AGS        2,549,863W     2,549,863W

 

39.  AGS252 - AUTOMOTIVE MANAGEMENT - PARKING CONTROL

                                                 24.50*         24.50*

OPERATING                         AGS        3,355,757W     3,355,757W

 

40.  AGS901 - GENERAL ADMINISTRATIVE SERVICES

                                                 35.00*         35.00*

OPERATING                         AGS        2,694,264A     2,694,264A

                                                  2.00*          2.00*

                                  AGS          146,503U       146,503U

 

41.  SUB201 - CITY AND COUNTY OF HONOLULU

INVESTMENT CAPITAL                CCH        2,000,000C     2,000,000C

 

42.  SUB401 - COUNTY OF MAUI

INVESTMENT CAPITAL                COM                 C     1,000,000C

 

43.  SUB501 - COUNTY OF KAUAI

INVESTMENT CAPITAL                COK                 C        30,000C


PART III.  PROGRAM APPROPRIATION PROVISIONS

ECONOMIC DEVELOPMENT

     SECTION 4.  Provided that of the general fund appropriation for agricultural resource management (AGR 141), the sum of $454,415 for fiscal year 2011‑2012 and the sum of $454,415 for fiscal year 2012‑2013 shall be deposited into the irrigation system revolving fund to be expended for the purposes of the fund.

     SECTION 5.  Provided that of the special fund appropriation for agricultural resource management (AGR 141), the sum of $75,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $75,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by the department of agriculture for the continued operation and maintenance of the east Kauai irrigation system.

     SECTION 6.  Provided that of the special fund appropriation for agribusiness development and research (AGR 161), the sum of $500,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $500,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by the department of agriculture for research and training in food security and food sustainability programs of the University of Hawaii at Manoa, college of tropical agriculture and human resources.

     SECTION 7.  Provided that of the general fund appropriation for agribusiness development and research (AGR 161), the sum of $50,601 for fiscal year 2011‑2012 and the sum of $50,601 for fiscal year 2012‑2013 may be deposited into the Hawaii agricultural development revolving fund to be expended for the purposes of the fund.

TRANSPORTATION

     SECTION 8.  Provided that of the special fund appropriations for the airports division (TRN 102‑TRN 195), the following sums specified for special repair and maintenance projects in fiscal biennium 2011‑2013 shall be expended for special repair and maintenance purposes only as follows:

     Program I.D.            FY 2011-2012       FY 2012-2013

       TRN 102               $6,800,000          $6,800,000

       TRN 104               $  500,000          $  500,000

       TRN 111               $1,005,000          $1,000,000

       TRN 114               $1,600,000          $1,600,000

       TRN 116               $  250,000          $  250,000

       TRN 118               $  190,000          $  190,000

       TRN 131               $1,905,000          $1,900,000

       TRN 133               $  100,000          $  100,000

       TRN 135               $  550,000          $  550,000

       TRN 141               $  475,000          $  475,000

       TRN 143               $  210,000          $  160,000

       TRN 151               $  400,000          $  880,000

       TRN 161               $  950,000          $  950,000

       TRN 163               $   18,000          $   25,000

       TRN 195               $3,047,000          $2,620,000;

and provided further that any unexpended funds shall lapse to the airport special fund.

     SECTION 9.  Provided that of the special fund appropriation for airports administration (TRN 195), the sum of $78,107,803 or so much thereof as may be necessary for fiscal year 2011‑2012  and the sum of $95,148,450 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for the following purposes:

     Purpose                 FY 2011‑2012       FY 2012‑2013

Interest and principal on

  revenue bonds              $78,107,803       $95,148,450;

provided further that any unexpended fund appropriation may be expended for principal and interest on revenue bonds payable from the passenger facility charge special fund, as necessary; and provided further that any unexpended funds shall lapse to the airport special fund.

     SECTION 10.  Provided that of the special fund appropriations for the harbors division (TRN 301‑TRN 395), the following sums specified for special repair and maintenance projects in fiscal biennium 2011‑2013 shall be expended for special repair and maintenance purposes only as follows:

     Program I.D.            FY 2011‑2012       FY 2012‑2013

       TRN 301               $7,251,250          $7,251,250

       TRN 303               $1,133,192          $1,133,192

       TRN 311               $  816,000          $  816,000

       TRN 313               $  646,000          $  646,000

       TRN 331               $1,291,000          $1,291,000

       TRN 333               $   30,000          $   30,000

       TRN 341               $  479,229          $  479,229

       TRN 351               $  244,837          $  244,837

       TRN 361               $1,045,000          $1,045,000

       TRN 363               $  252,031          $  252,031;

and provided further that any unexpended funds shall lapse to the harbor special fund.

     SECTION 11.  Provided that of the special fund appropriation for harbors administration (TRN 395), the sum of $35,003,839 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of $35,032,698 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for the following purposes:

     Purpose                 FY 2011‑2012       FY 2012‑2013

Interest and principal on

  general obligation bonds   $ 3,380,916        $ 3,380,832

Interest and principal on

  revenue bonds              $31,622,923        $31,651,866;

provided further that any unexpended funds shall lapse to the harbor special fund.

     SECTION 12.  Provided that of the special fund appropriations for the highways division (TRN 501‑TRN 561), the following sums specified for special repair and maintenance projects in fiscal biennium 2011‑2013 shall be expended for special repair and maintenance purposes only as follows:

     Program I.D.           FY 2011‑2012        FY 2012‑2013

       TRN 501              $20,700,000         $ 36,443,000

       TRN 511              $ 9,500,000         $ 16,500,000

       TRN 531              $12,000,000         $ 20,500,000

       TRN 561              $ 7,000,000         $ 12,000,000;

and provided further that any unexpended funds shall lapse to the state highway fund.

     SECTION 13.  Provided that of the special fund appropriation for highways administration (TRN 595), the sum of $52,871,334 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of $51,523,720 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for the following purposes:

     Purpose                 FY 2011‑2012       FY 2012‑2013

Interest and principal on

  general obligation bonds   $ 8,166,474        $ 4,820,206

Interest and principal on

  revenue bonds              $44,704,860        $46,703,514;

provided that any unexpended funds shall lapse to the highway special fund.

     SECTION 14.  Provided that of the special fund appropriation for Kauai Highways (TRN 561), the sum of $500,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $500,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by the department of transportation to provide Saturday contraflow services along Kuhio Highway State Route 56 from Kapaa to Hanamaulu.

HEALTH

     SECTION 15.  Provided that the department of health and the department of human services shall each prepare a detailed report on the expenditures of funds from the tobacco Master Settlement Agreement; and provided further that each department shall submit quarterly reports to the legislature on October 15, January 15, April 15, and July 15.

     SECTION 16.  Provided that the Hawaii Community Foundation, as the administrator of the Hawaii tobacco prevention and control trust fund, shall prepare a detailed report on the financial condition, use of funds, and performance outcomes for the fund; and provided further that the Hawaii Community Foundation shall submit quarterly reports to the legislature on October 15, January 15, April 15, and July 15.

SOCIAL SERVICES

     SECTION 17.  Provided that of the general fund appropriation for services to veterans (DEF 112), the sum of $634,491 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $3,189,764 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended for the operation and maintenance of veterans' cemeteries, statewide; provided further that only amounts that will be reimbursed by federal sources shall be expended; provided further that the federal reimbursements shall be deposited to the credit of the general fund; and provided further that any unexpended funds shall lapse to the general fund.

     SECTION 18.  Provided that of the general fund appropriation for health care payments (HMS 401), the sum of $5,700,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $5,700,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be utilized to draw down additional federal matching funds specifically for the benefit of the Hawaii health systems corporation; provided that the aforementioned general fund appropriations and the resulting federal matching funds shall be provided as supplemental payments through QUEST and QUEST Expanded health plans to Hawaii health systems corporation facilities; provided further that these payments shall be in addition to the $6,900,000 in supplemental payments currently being paid to Hawaii health systems corporation facilities by the QUEST Expanded health plans; and provided further that if additional funding for the benefit of the Hawaii health systems corporation is made available, any unexpended funds shall be transferred to the Hawaii health systems corporation - regions (HTH 212).

FORMAL EDUCATION

     SECTION 19.  Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $57,446,372 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $60,603,057 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by charter schools to fund their educational programs; provided further that the funds shall not be expended for any other purpose; provided further that for fiscal years 2011-2012 and 2012-2013, any general fund amount that exceeds the product derived from multiplying:

(1)  The actual charter school enrollment count on October 15, 2011, and October 15, 2012, as reviewed and verified by the charter school administrative office by November 15, 2011, and November 15, 2012; and

(2)  The sum of $5,867 for fiscal year 2011-2012 and the sum of $5,749 for fiscal year 2012-2013;

shall lapse to the charter schools account within the state treasury; provided further that charter schools shall prepare a report that shall include but not be limited to a detailed breakout of the all means of financing budget for the current and next fiscal year and actual expenditures for the last completed fiscal year for each charter school, a report of all other funds expended on behalf of each school, and a report detailing by school:

(1)  The enrollment projections used to submit the current budget request;

(2)  The actual October 15, 2011, and the actual October 15, 2012, enrollment count as reported by each school for the current school year;

(3)  The charter school administrative office's reviewed and verified October 15, 2011, and October 15, 2012,  enrollment count; and

(4)  The charter school administrative office's reviewed and verified November 15, 2011, and November 15, 2012, enrollment count;

and provided further that the charter school administrative office shall submit these reports to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 20.  Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $2,233,699 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $2,404,556 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended for facility costs; provided further that the amount that exceeds $228 multiplied by the actual October 15 charter school enrollment count for the current school year, as reviewed and verified by the charter school administrative office by November 15, shall lapse to the charter schools account within the state treasury; provided further that the funds shall be distributed to charter schools based on methodology developed by the charter school administrative office; provided further that charter school administrative office shall prepare a report that shall include but not be limited to a detailed breakout of actual facility-related expenditures for the last completed fiscal year for each charter school and the method of funding; provided further that the report shall include an explanation of the methodology developed by the charter school administrative office to distribute the funds; and provided further that the charter school administrative office shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 21.  Provided that for fiscal years 2011-2012 and 2012-2013, no general funds in excess of the amount the charter school administrative office determines should be allocated to the Myron B. Thompson Academy Public Charter School pursuant to section 302B-12(c), Hawaii Revised Statutes, minus $255,000, shall be expended by or for Myron B. Thompson Academy Public Charter School until the charter school review panel has issued a determination that the Myron B. Thompson Academy Public Charter School administrators and local school board have appeared before the panel and have adequately responded to all inquiries it and the legislature have posed.

     SECTION 22.  Provided that the charter school administrative office (EDN 600) shall prepare a report for each charter school on the internal policies and procedures for the procurement of goods, services, and construction for each school and also the level of conformity with the goals of public accountability and public procurement practices for each school; provided further that the report shall include but not be limited to an evaluation of the benefits for each charter school as a result of being exempt from the requirements of chapter 103D, Hawaii Revised Statutes, and discussion on the frequency with which charter schools and their local school boards use the provisions of chapter 103D, Hawaii Revised Statutes; provided further that the report shall cover the last completed fiscal year and the current fiscal year; and provided further that the charter school administrative office shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 23.  Provided that the University of Hawaii shall prepare a detailed report on the expenditures of the funds from the tobacco Master Settlement Agreement for university revenue-undertakings; and provided further that the university shall submit quarterly reports to the legislature on October 15, January 15, April 15 and July 15.

PUBLIC SAFETY

     SECTION 24.  Provided that for sheriff (PSD 503), the sheriff division of the department of public safety shall prepare a report on special duty assignments that shall include the following:

     (1)  Implemented policies and procedures covering special duty assignments, including a description of how the department is ensuring that all funds received by deputy sheriffs for special duty assignments are reported to federal and state taxing authorities;

     (2)  A detail of amounts charged to each state agency for deputy sheriff special duty assignments;

     (3)  The total amount received by each deputy sheriff for special duty assignments with state agencies and the amount received for special duty assignments with non-state agencies;

     (4)  The average amount of overtime paid, if any, to deputy sheriffs for special duty assignments; and

     (5)  The average amount of other income paid to deputy sheriffs for special duty assignments;

and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 25.  Provided that of the general fund appropriation for amelioration of physical disasters (DEF 110), the sum of $500,000 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of $500,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for relief from major disasters pursuant to section 127‑11, Hawaii Revised Statutes; provided further that any funds not expended for this purpose shall lapse to the general fund.

INDIVIDUAL RIGHTS

     SECTION 26.  Provided that of the special fund appropriation for cable television (CCA 102), the sum of $300,000 for fiscal year 2011-2012 and $300,000 for fiscal year 2012-2013 shall be expended by the department of commerce and consumer affairs for institutional network (INET) projects for equipment and connection on those projects requested by the department of education.

     SECTION 27.  Provided that of the special fund appropriation for general support (CCA 191), the sum of $600,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $600,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used to fully reimburse the department of the attorney general for all services received from that department; and provided further that any unexpended funds shall lapse to the special fund.

GOVERNMENT-WIDE SUPPORT

     SECTION 28.  Provided that of the general fund appropriation for the office of the governor (GOV 100), the sum of $10,000 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of $10,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be used for the governor's "contingent fund" pursuant to section 37‑71(f), Hawaii Revised Statutes; and provided further that such funds may be transferred to other programs and agencies and allotted, with the approval of the governor, to meet contingencies as they arise.

     SECTION 29.  Provided that of the general fund appropriation for departmental administration and budget division (BUF 101), the sum of $612,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $612,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended as a subsidy to the Bishop Museum; provided further that any unexpended funds shall lapse to the general fund.

     SECTION 30.  Provided that of the general fund appropriation for office of elections (AGS 879), the sum of $113,791 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $113,791 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for 14.5 civil service positions converted from exempt under Act 213, Session Laws of Hawaii 2007; provided further that only the amount needed to fund the difference between the exempt position salaries and the actual salary requirements of the civil service positions shall be expended; provided further that the funds shall not be expended for any other purpose; provided further that any unexpended funds shall lapse to the general fund; provided further that the department of accounting and general services shall prepare a report detailing:

     (1)  The positions converted to civil service;

     (2)  The status of each of the 14.5 positions not yet converted to civil service and reason for the delay of conversion; and

(3)  The actual additional amount needed to convert each of the 14.5 exempt positions to civil service for the most recently completed fiscal year; 

and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 31.  Provided that the office of elections (AGS 879) prepare quarterly reports, beginning with the first quarter of fiscal year 2011-2012 and every three months thereafter, to include the following:

     (1)  An updated list of vacant positions, noting current recruitment status;

     (2)  A detailed listing of travel and overtime expenditures for the quarter, including justification or reason for expenditure;

     (3)  A detailed listing of milestones, accomplishments, and activities of the chief elections officer and each section occurring during the quarter; and

     (4)  Updated planning timeline for the 2012 elections, including justification of any changes from the previously reported timeline;

and provided further that the office of elections shall submit the reports to the legislature no later than thirty days after the last day of each quarter.

     SECTION 32.  Provided that of the general fund appropriations for debt service payments (BUF 721-BUF 728), the following sums specified in fiscal biennium 2011‑2013 shall be expended for principal and interest payments on general obligation bonds only as follows:

     Program I.D.     FY 2011-2012       FY 2012-2013

       BUF 721        $258,583,782       $306,342,481

       BUF 725        $222,989,025       $264,173,610

       BUF 728        $ 82,527,939       $ 97,770,299;

provided further that unrequired balances may be transferred only to retirement benefits payments (BUF 741-BUF 748) and health premium payments (BUF 761-BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund.

     SECTION 33.  Provided that of the general fund appropriations for retirement benefits payments (BUF 741-BUF 748), the following sums specified in fiscal biennium 2011‑2013 shall be expended for the state employer's share of the employees' retirement system's pension accumulation only as follows:

     Program I.D.     FY 2011-2012       FY 2012-2013

     BUF 741          $171,388,684       $173,662,109

     BUF 745          $181,970,000       $184,245,000

     BUF 748          $  81,275,000      $ 82,291,000;

Provided that the amounts in BUF 741 accounts for amounts that shall be transferred in pursuant to section 96; provided further that unrequired balances may be transferred only to debt service payments (BUF 721-BUF 728) and health premium payments (BUF 761-BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund.

     SECTION 34.  Provided that of the general fund appropriations for retirement benefits payments (BUF 741-BUF 748), the following sums specified in fiscal biennium 2011-2013 shall be expended for the state employer's share of the social security/Medicare payment for employees only as follows:

     Program I.D.     FY 2011-2012       FY 2012-2013

     BUF 741          $ 90,621,637       $ 84,840,795

     BUF 745          $ 98,707,870       $ 92,955,000

     BUF 748          $ 41,981,258       $ 40,393,000;

Provided that the amounts in BUF 741 accounts for amounts that shall be transferred in pursuant to section 96; provided further that unrequired balances may be transferred only to debt service payments (BUF 721-BUF 728) and health premium payments (BUF 761-BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund.

     SECTION 35.  Provided that of the general fund appropriations for health premium payments (BUF 761-BUF 768), the following sums specified in fiscal biennium 2011‑2013 shall be expended for the state employer's share of health premiums for active employees and retirees only as follows:
     Program I.D.     FY 2011-2012       FY 2012-2013
       BUF 761        $187,687,959       $210,386,311
       BUF 765        $236,284,465       $264,546,608
       BUF 768        $ 78,550,089       $ 88,092,504;
Provided that the amounts in BUF 761 accounts for amounts that shall be transferred in pursuant to section 97; provided further that unrequired balances may be transferred only to debt service payments (BUF 721-BUF 728) and retirement benefits payments (BUF 741-BUF 748); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund.

PART IV.  CAPITAL IMPROVEMENT PROGRAM PROVISIONS

     SECTION 36.  CAPITAL IMPROVEMENT PROJECTS AUTHORIZED.  The sums of money appropriated or authorized in part II of this Act for capital improvements shall be expended for the projects listed below.  Accounting of the appropriations by the department of accounting and general services shall be based on the projects as such projects are listed in this section.  Several related or similar projects may be combined into a single project if such combination is advantageous or convenient for implementation; and provided further that the total cost of the projects thus combined shall not exceed the total of the sum specified for the projects separately.  (The amount after each cost element and the total funding for each project listed in this part are in thousands of dollars.)


A.  ECONOMIC DEVELOPMENT

BED107 - FOREIGN TRADE ZONE

 

1.          FOREIGN TRADE ZONE IMPORT-EXPORT STEP-UP INCUBATOR, MAUKA RENOVATION, OAHU

 

            DESIGN AND CONSTRUCTION FOR RENOVATION OF MAUKA END OF THE FOREIGN TRADE ZONE WAREHOUSE TO PROVIDE 30,000 SQ. FT. OF ADDITIONAL OFFICE SPACE WITH 40 INDIVIDUAL OFFICES, COMMON CONFERENCE ROOM AND OTHER FACILITIES TO SUPPORT IMPORT-EXPORT RELATED SMALL BUSINESSES.  THIS IS A "SHOVEL-READY" PROJECT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          750           

            CONSTRUCTION                                  6,750           

               TOTAL FUNDING              BED             4,500 D           D

                                          BED             3,000 N           N

 

AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

 

2. SW0602   STATE IRRIGATION SYSTEM RESERVOIR SAFETY IMPROVEMENTS, STATEWIDE

 

            LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR STATEWIDE RESERVOIR SAFETY IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                              1           1

            DESIGN                                        1,000           1

            CONSTRUCTION                                  2,499       2,498

               TOTAL FUNDING              AGR             2,500 C      1,500 C

                                          AGR             1,000 N      1,000 N

 


 

3. 980002   LOWER HAMAKUA DITCH WATERSHED PROJECT, HAWAII

 

            LAND, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE LOWER HAMAKUA DITCH SYSTEM, TOGETHER WITH APPURTENANT WORKS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                              2           2

            DESIGN                                            2           2

            CONSTRUCTION                                  6,396       2,996

               TOTAL FUNDING              AGR             3,200 C      1,500 C

                                          AGR             3,200 N      1,500 N

 

4. 200603   WAIMANALO IRRIGATION SYSTEM IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE WAIMANALO IRRIGATION SYSTEM, OAHU

            DESIGN                                          100           

            CONSTRUCTION                                  1,750       1,000

               TOTAL FUNDING              AGR             1,850 C      1,000 C

 

5. P97002   UPCOUNTRY MAUI WATERSHED PROJECT, MAUI

 

            LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE INSTALLATION OF PIPELINE FOR THE UPCOUNTRY MAUI WATERSHED, MAUI.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                              2           2

            DESIGN                                            2           2

            CONSTRUCTION                                  2,996       2,996

               TOTAL FUNDING              AGR             1,500 C      1,500 C

                                          AGR             1,500 N      1,500 N

 


 

6. 201006   KEKAHA DITCH IMPROVEMENTS, KAUAI

 

            PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE BLACK PIPE SIPHON, PALI WOODEN FLUME, AND OTHER STRUCTURES.

            PLANS                                           100           

            DESIGN                                          200           

            CONSTRUCTION                                              1,400

               TOTAL FUNDING              AGR               300 C      1,400 C

 

7. 200402   MOLOKAI IRRIGATION SYSTEM IMPROVEMENTS, MOLOKAI

 

            PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE MOLOKAI IRRIGATION SYSTEM.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,248           

               TOTAL FUNDING              AGR             1,250 C           C

 

8. 201101   KAHUKU AGRICULTURAL PARK SUBDIVISION MISCELLANEOUS IMPROVEMENTS, OAHU

 

            CONSTRUCTION OF MISCELLANEOUS IMPROVEMENTS TO THE KAHUKU AGRICULTURAL PARK SUBDIVISION.

            CONSTRUCTION                                    110           

               TOTAL FUNDING              AGR               110 C           C

 


 

9.          STATE AGRICULTURAL WATER USE DEVELOPMENT PLAN, STATEWIDE

 

            PLANS FOR STATE AGRICULTURAL WATER USE DEVELOPMENT PLAN, STATEWIDE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         2,350       5,350

               TOTAL FUNDING              AGR             1,000 C      1,000 C

                                          AGR             1,350 N      4,350 N

 

10. 201104  WAIAHOLE WATER SYSTEMS IMPROVEMENTS, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO WAIAHOLE WATER SYSTEM, OAHU.

            PLANS                                             1           

            DESIGN                                          499           

            CONSTRUCTION                                              2,500

               TOTAL FUNDING              AGR               500 C      2,500 C

 

11. 21103   KA'U IRRIGATION SYSTEM, HAWAII

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE TRANSMISSION DITCH AND FLUME SYSTEM OF THE FORMER KA'U AGRIBUSINESS PLANTATION'S IRRIGATION SYSTEM.

            PLANS                                             1           

            DESIGN                                          499           

            CONSTRUCTION                                              1,500

               TOTAL FUNDING              AGR               500 C      1,500 C

 


 

AGR161 - AGRIBUSINESS DEVELOPMENT AND RESEARCH

 

12.         HAWAII LIVESTOCK SLAUGHTERHOUSE, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO INSTALL A PHOTVOLTAIC SYSTEM FOR THE LIVESTOCK SLAUGHTERHOUSE LOCATED IN CAMPBELL INDUSTRIAL PARK.

            DESIGN                                            1           

            CONSTRUCTION                                    748           

            EQUIPMENT                                         1           

               TOTAL FUNDING              AGR               750 C           C

 

AGR192 - GENERAL ADMINISTRATION FOR AGRICULTURE

 

13. 981921  MISCELLANEOUS HEALTH, SAFETY, CODE, AND OTHER REQUIREMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO ADDRESS HEALTH, SAFETY, CODE, AND OTHER REQUIREMENTS, STATEWIDE.

            DESIGN                                          250         100

            CONSTRUCTION                                    500         400

               TOTAL FUNDING              AGR               750 C        500 C

 


 

LNR153 - COMMERCIAL FISHERIES AND RESOURCE ENHANCEMENT

 

14.         ANUENUE FISHERIES RESEARCH CENTER MAINTENANCE AND ELECTRICAL UPGRADES, OAHU

 

            DESIGN AND CONSTRUCTION FOR MAINTENANCE AND SAFETY UPGRADES AT THE ANUENUE FISHERIES RESEARCH CENTER, OAHU.

            DESIGN                                           50           

            CONSTRUCTION                                                320

               TOTAL FUNDING              LNR                50 C        320 C

 

BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

 

15. TE0012  CHILLER REPLACEMENT WITH ENERGY EFFICIENT TECHNOLOGIES AT MRTC, MAUI

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPLACEMENT AND RELOCATION OF THE CHILLER WITH ENERGY EFFICIENT TECHNOLOGIES AT THE MAUI RESEARCH AND TECHNOLOGY CENTER.

            PLANS                                            25           

            DESIGN                                           69           

            CONSTRUCTION                                    200           

            EQUIPMENT                                       440           

               TOTAL FUNDING              BED               734 B           B

 

BED146 - NATURAL ENERGY LAB OF HAWAII AUTHORITY

 

16. NELHA28 NELHA 40" SEAWATER PIPES UPGRADE, HAWAII

 

            CONSTRUCTION FOR MOORING SYSTEM OF 40" SEAWATER PIPELINES UPGRADE.

            CONSTRUCTION                                  3,500           

               TOTAL FUNDING              BED             3,500 C           C

 


 

LNR141 - WATER AND LAND DEVELOPMENT

 

17. J45     ROCKFALL AND FLOOD MITIGATION, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR ROCKFALL AND FLOOD MITIGATION AT VARIOUS LOCATIONS, STATEWIDE. THE LEGISLATURE FINDS AND DECLARES THAT THIS APPROPRIATION IS IN THE PUBLIC INTEREST AND FOR THE PUBLIC'S HEALTH, SAFETY AND GENERAL WELFARE OF THE STATE.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  3,238       2,498

               TOTAL FUNDING              LNR             3,240 C      2,500 C

 

18.         KOKEE ROAD, WAIMEA, KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND RESURFACE KOKEE ROAD FROM MILE MARKER 15 TO THE KALALAU LOOKOUT.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    498           

               TOTAL FUNDING              LNR               500 C           C

 


 

BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

 

19. HCD001  HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S COMMUNITY DEVELOPMENT DISTRICTS, OAHU

 

            PLANS FOR COSTS RELATED TO WAGES AND FRINGE BENEFITS FOR PERMANENT AND NON-PERMANENT PROJECT-FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S COMMUNITY DEVELOPMENT DISTRICTS.  FUNDS MAY BE USED TO MATCH FEDERAL AND NON-STATE FUNDS AS MAY BE AVAILABLE.

            PLANS                                         1,855       1,855

               TOTAL FUNDING              BED             1,855 C      1,855 C

 

BED160 - HAWAII HOUSING FINANCE AND DEVELOPMENT CORP

 

20. HFDC04  RENTAL HOUSING TRUST FUND INFUSION, STATEWIDE

 

            CONSTRUCTION TO PROVIDE AN INFUSION OF FUNDS TO FINANCE ADDITIONAL AFFORDABLE RENTAL HOUSING STATEWIDE.

            CONSTRUCTION                                 10,000       5,000

               TOTAL FUNDING              BED            10,000 C      5,000 C

 


 

21. HFDC06  SENIOR RESIDENCE AT IWILEI, OAHU

 

            CONSTRUCTION OF 160 LOW INCOME ELDERLY RENTAL APARTMENTS; MAY INCLUDE ADULT DAY CARE CENTER, OFFICE SPACE FOR NON-PROFIT AGENCIES, ON-SITE PARKING, RESIDENT MANAGER'S UNIT AND OFFICE, AND OTHER COMMON AREAS.

            CONSTRUCTION                                 26,000           

               TOTAL FUNDING              BED            26,000 C           C

 

22.         LOW-INCOME HOUSING TAX CREDIT LOANS, STATEWIDE

 

            CONSTRUCTION TO PROVIDE LOW-INCOME HOUSING TAX CREDIT LOANS PURSUANT TO SECTION 201H, HAWAII REVISED STATUTES.

            CONSTRUCTION                                  7,000           

               TOTAL FUNDING              BED             7,000 C           C

 


 

B.  EMPLOYMENT

LBR903 - OFFICE OF COMMUNITY SERVICES

 

1.          PACIFIC GATEWAY CENTER, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION TO CONSTRUCT THE KE'EHI COMMUNITY RESOURCE CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    998           

               TOTAL FUNDING              LBR             1,000 C           C

 

2.          PAPAKOLEA DEVELOPMENT CENTER, OAHU

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE PAPAKOLEA DEVELOPMENT CENTER, OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                    249           

               TOTAL FUNDING              LBR               250 C           C

 

3.          HAWAII PUBLIC TELEVISION FOUNDATION, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR A NEW BUILDING FOR PBS HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,998           

               TOTAL FUNDING              LBR             2,000 C           C

 


 

4.          EASTER SEALS HAWAII, MAUI

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE EASTER SEALS HAWAII CAMPUS, MAUI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    948           

               TOTAL FUNDING              LBR               950 C           C

 

5.          HALE KIPA, INC., OAHU

 

            PLANS, DESIGN AND CONSTRUCTION TO CONSTRUCT THE HALE KIPA SERVICES CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,298           

               TOTAL FUNDING              LBR             1,300 C           C

 

6.          ST. FRANCIS HEALTHCARE FOUNDATION OF HAWAII, OAHU

 

            DESIGN AND CONSTRUCTION FOR AN INTERGENERATIONAL CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                    999           

               TOTAL FUNDING              LBR             1,000 C           C

 


 

7.          WAIKIKI COMMUNITY CENTER, OAHU

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE WAIKIKI COMMUNITY CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                    229           

               TOTAL FUNDING              LBR               230 C           C

 

8.          SPECIAL OLYMPICS HAWAII, INC, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR A SPORTS AND FITNESS COMPLEX IN KAPOLEI, OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,498           

               TOTAL FUNDING              LBR             1,500 C           C

 

9.          KAUAI ECONOMIC OPPORTUNITY, INC. , KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION TO REPLACE DAMAGED ROOF. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                     78           

               TOTAL FUNDING              LBR                80 C           C

 


 

HMS802 - VOCATIONAL REHABILITATION

 

10.         HOOPONO VOCATIONAL REHABILITATION FOR BLIND DIVISION, DEPARTMENT OF HUMAN SERVICES, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR VARIOUS UPGRADES FOR THE HOOPONO PROGRAM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    494           

            EQUIPMENT                                         1           

               TOTAL FUNDING              HMS               497 C           C

 


 

C.  TRANSPORTATION FACILITIES

TRN102 - HONOLULU INTERNATIONAL AIRPORT

 

1. A23N     HONOLULU INTERNATIONAL AIRPORT, RUNWAY 4R IMPROVEMENTS, OAHU

 

            CONSTRUCTION FOR RUNWAY 4R STRUCTURAL IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES).

            CONSTRUCTION                                 21,400           

               TOTAL FUNDING              TRN            15,000 N           N

                                          TRN             6,400 X           X

 

2. A23O     HONOLULU INTERNATIONAL AIRPORT, RUNWAY 22 CULVERT IMPROVEMENTS, OAHU

 

            CONSTRUCTION FOR RUNWAY 22 CULVERT IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM AND BOX CULVERT AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 14,400           

               TOTAL FUNDING              TRN             3,600 E           E

                                          TRN            10,800 N           N

 


 

3. A23P     HONOLULU INTERNATIONAL AIRPORT, TAXIWAY Z STRUCTURAL IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR STRUCTURAL IMPROVEMENTS TO TAXIWAY Z AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES).

            DESIGN                                        5,000           

            CONSTRUCTION                                             53,500

               TOTAL FUNDING              TRN             1,250 E           E

                                          TRN             3,750 N     37,500 N

                                          TRN                   X     16,000 X

 

4. A10C     HONOLULU INTERNATIONAL AIRPORT, ROADWAY IMPROVEMENTS, OAHU

 

            CONSTRUCTION TO REPAVE AOLELE STREET FROM LAGOON DRIVE TO NIMITZ HIGHWAY AND LAGOON DRIVE FROM AOLELE STREET TO IOLANA STREET.

            CONSTRUCTION                                  7,740           

               TOTAL FUNDING              TRN             7,740 E           E

 

5.          HONOLULU INTERNATIONAL AIRPORT, NOISE MONITORING SYSTEM UPGRADE, OAHU

 

            DESIGN AND CONSTRUCTION FOR THE UPGRADE OF THE EXISTING NOISE MONITORING SYSTEM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                           35           

            CONSTRUCTION                                                350

               TOTAL FUNDING              TRN                35 E         88 E

                                          TRN                   N        262 N

 


 

6. A37F     HONOLULU INTERNATIONAL AIRPORT, LOADING BRIDGE MODERNIZATION, OAHU

 

            CONSTRUCTION FOR THE INSTALLATION OF NEW PASSENGER LOADING BRIDGES AND REMOVAL OF EXISTING LOADING BRIDGES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                              9,450

               TOTAL FUNDING              TRN                   E      2,700 E

                                          TRN                   N      6,750 N

 

7. A35D     HONOLULU INTERNATIONAL AIRPORT, OVERSEAS TERMINAL SIGNAGE AND SIDEWALK IMPROVEMENTS, OAHU

 

            CONSTRUCTION FOR SIGNAGE AND SIDEWALK IMPROVEMENTS AT THE OVERSEAS TERMINAL.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 11,300           

               TOTAL FUNDING              TRN             2,825 E           E

                                          TRN             8,475 N           N

 

8. A18A     HONOLULU INTERNATIONAL AIRPORT, NEW RAMP CONTROL OFFICE, OAHU

 

            CONSTRUCTION FOR A NEW RAMP CONTROL OFFICE.

            CONSTRUCTION                                    685           

               TOTAL FUNDING              TRN               685 E           E

 


 

9. A20C     HONOLULU INTERNATIONAL AIRPORT, WIKI WIKI SHUTTLE STATION IMPROVEMENTS, OAHU

 

            CONSTRUCTION FOR IMPROVEMENTS TO THE TWO WIKI WIKI SHUTTLE STATIONS LOCATED ON THE 3RD LEVEL OF THE OVERSEAS TERMINAL.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  3,852           

               TOTAL FUNDING              TRN             1,152 E           E

                                          TRN             2,700 N           N

 

10. A41M    HONOLULU INTERNATIONAL AIRPORT, TERMINAL FACILITY IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION TO RENOVATE THE TERMINAL AREA TO INCORPORATE THE CURRENT THEME OF THE AIRPORT TO CREATE A POSITIVE IMAGE TO PASSENGERS.

            DESIGN                                        3,000           

            CONSTRUCTION                                             24,400

               TOTAL FUNDING              TRN             3,000 E     24,400 E

 


 

TRN104 - GENERAL AVIATION

 

11. A71C    KALAELOA AIRPORT, FACILITY IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR KALAELOA AIRPORT FACILITY IMPROVEMENTS INCLUDING LEASE LOTS, APRONS, RUNWAYS, TAXIWAYS AND AVIATION FACILITIES SUCH AS THE CONTROL TOWER, AIRPORT RESCUE FIRE FIGHTING (ARFF) BUILDING, T-HANGER, AVIATION FUEL SYSTEMS AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        1,600           

            CONSTRUCTION                                  8,525       8,525

               TOTAL FUNDING              TRN             2,375 B        775 B

                                          TRN             7,750 N      7,750 N

 

TRN111 - HILO INTERNATIONAL AIRPORT

 

12. B10M    HILO INTERNATIONAL AIRPORT, ARFF FACILITY IMPROVEMENTS, HAWAII

 

            CONSTRUCTION FOR THE RENOVATION OF THE AIRCRAFT RESCUE AND FIRE FIGHTING STATION, AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.  THIS PROGRAM IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                              9,450

               TOTAL FUNDING              TRN                   E        900 E

                                          TRN                   N      8,550 N

 


 

13. B10X    HILO INTERNATIONAL AIRPORT, LAND ACQUISITION, HAWAII

 

            LAND ACQUISITION OF A 2.847 ACRE PARCEL.

            LAND                                          2,500           

               TOTAL FUNDING              TRN             2,500 B           B

 

14. B10B    HILO INTERNATIONAL AIRPORT, CARGO BUILDING AND RAMP, HAWAII

 

            CONSTRUCTION FOR ADDITIONAL CARGO FACILITIES WITHIN THE AIRPORT INCLUDING A CARGO RAMP AND OTHER RELATED IMPROVEMENTS.

            CONSTRUCTION                                 14,000           

               TOTAL FUNDING              TRN            14,000 E           E

 

TRN131 - KAHULUI AIRPORT

 

15. D04E    KAHULUI AIRPORT, RE-ROOF TERMINAL BUILDINGS, MAUI

 

            DESIGN AND CONSTRUCTION FOR THE RE-ROOFING OF THE TERMINAL BUILDINGS AND OTHER RELATED IMPROVEMENTS.

            DESIGN                                        1,500           

            CONSTRUCTION                                              6,000

               TOTAL FUNDING              TRN             1,500 B           B

                                          TRN                   E      6,000 E

 

16. D04F    KAHULUI AIRPORT, PASSENGER INFORMATION SYSTEM IMPROVEMENTS, MAUI

 

            CONSTRUCTION OF PASSENGER INFORMATION SYSTEM IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.

            CONSTRUCTION                                  2,500           

               TOTAL FUNDING              TRN             2,500 E           E

 


 

17. D04S    KAHULUI AIRPORT, LOADING BRIDGE MODERNIZATION, MAUI

 

            CONSTRUCTION FOR THE INSTALLATION OF NEW PASSENGER LOADING BRIDGES AND REMOVAL OF EXISTING LOADING BRIDGES.

            CONSTRUCTION                                  9,620           

               TOTAL FUNDING              TRN             9,620 E           E

 

18. D04D    KAHULUI AIRPORT, TERMINAL IMPROVEMENTS, MAUI

 

            DESIGN AND CONSTRUCTION OF TERMINAL IMPROVEMENTS INCLUDING CONFERENCE ROOMS, FAMILY RESTROOMS, HOLDROOMS, SECURITY BADGING OFFICE IMPROVEMENTS, AND OTHER RELATED IMPROVEMENTS.

            DESIGN                                          300           

            CONSTRUCTION                                  2,700           

               TOTAL FUNDING              TRN             3,000 E           E

 

19. D04U    KAHULUI AIRPORT, LAND ACQUISITION, MAUI

 

            LAND ACQUISITION OF A PARCEL NEAR THE AIRPORT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                         15,500           

               TOTAL FUNDING              TRN             3,875 E           E

                                          TRN            11,625 N           N

 


 

TRN135 - KAPALUA AIRPORT

 

20.         KAPALUA AIRPORT, MAUI

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR SOLAR POWERED RUNWAY LIGHTS AND HARDWARE FOR EMERGENCY USE AT KAPALUA AIRPORT.

            PLANS                                                         1

            DESIGN                                                        1

            CONSTRUCTION                                                110

            EQUIPMENT                                                     1

               TOTAL FUNDING              TRN                   E        113 E

 

TRN151 - LANAI AIRPORT

 

21. D70H    LANAI AIRPORT, RUNWAY SAFETY AREA IMPROVEMENTS, LANAI

 

            CONSTRUCTION OF THE RUNWAY SAFETY AREA IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM, CONSTRUCTION OF NEW SERVICE ROAD, RELOCATION OF PERIMETER FENCING AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 35,111           

               TOTAL FUNDING              TRN             2,825 B           B

                                          TRN            32,286 N           N

 


 

TRN161 - LIHUE AIRPORT

 

22. E10B    LIHUE AIRPORT, AIRFIELD IMPROVEMENTS, KAUAI

 

            DESIGN AND CONSTRUCTION FOR AIRFIELD IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        2,400           

            CONSTRUCTION                                             21,600

               TOTAL FUNDING              TRN             2,400 E      1,080 E

                                          TRN                   N     20,520 N

 

23. E03O    LIHUE AIRPORT, AHUKINI LANDFILL RESTORATION, KAUAI

 

            CONSTRUCTION FOR THE RESTORATION OF THE AHUKINI LANDFILL AT LIHUE AIRPORT.

            CONSTRUCTION                                  2,500           

               TOTAL FUNDING              TRN             2,500 E           E

 

24. E03U    LIHUE AIRPORT, TICKET LOBBY AND HOLDROOM IMPROVEMENTS, KAUAI

 

            DESIGN AND CONSTRUCTION FOR TICKET LOBBY AND HOLDROOM IMPROVEMENTS.

            DESIGN                                          800           

            CONSTRUCTION                                              8,300

               TOTAL FUNDING              TRN               800 E      8,300 E

 


 

TRN195 - AIRPORTS ADMINISTRATION

 

25.         AIRPORTS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECT STAFF COSTS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S AIRPORT DIVISION.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM PROJECT RELATED POSITIONS.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES)

            PLANS                                           250         250

            DESIGN                                          900         900

            CONSTRUCTION                                  1,400       1,400

               TOTAL FUNDING              TRN             2,450 B      2,450 B

                                          TRN               100 X        100 X

 

26. F05I    AIRFIELD IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR AIRFIELD IMPROVEMENTS AT STATEWIDE AIRPORTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        1,000       1,000

            CONSTRUCTION                                 11,000      11,000

               TOTAL FUNDING              TRN             4,500 B      4,500 B

                                          TRN             7,500 N      7,500 N

 


 

27. F08G    MISCELLANEOUS AIRPORT PROJECTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION OF IMPROVEMENTS AT VARIOUS STATE AIRPORTS.  IMPROVEMENTS FOR SAFETY AND CERTIFICATION REQUIREMENTS, OPERATIONAL EFFICIENCY, AND PROJECTS REQUIRED FOR AIRPORT RELATED DEVELOPMENT.

            DESIGN                                        1,000       1,000

            CONSTRUCTION                                  2,500       2,500

               TOTAL FUNDING              TRN             3,500 B      3,500 B

 

28. F04J    AIRPORT PLANNING STUDY, STATEWIDE

 

            PLANS FOR AIRPORT IMPROVEMENTS, ECONOMIC STUDIES, RESEARCH, NOISE MONITORING STUDIES, NOISE COMPATIBILITY STUDIES, AND ADVANCE PLANNING OF FEDERAL AID AND NON-FEDERAL AID PROJECTS.

            PLANS                                         1,000       1,000

               TOTAL FUNDING              TRN             1,000 B      1,000 B

 

29. F05N    RADIO COMMUNICATIONS IMPROVEMENTS, STATEWIDE

 

            CONSTRUCTION FOR NEW DIGITAL RADIO INFRASTRUCTURE UPGRADES INCLUDING ANTENNAS, SYSTEM WATCH TERMINALS, FLASH UPGRADES, WIRING AND NETWORKING DIGITAL RADIO RECORDERS, AND OTHER RELATED IMPROVEMENTS AT STATEWIDE AIRPORTS.

            CONSTRUCTION                                              1,400

               TOTAL FUNDING              TRN                   B      1,400 B

 


 

TRN311 - HILO HARBOR

 

30. L16     MITIGATION AT HILO HARBOR, HAWAII

 

            DESIGN AND CONSTRUCTION TO MITIGATE ENVIRONMENTAL MEASURES AT HILO HARBOR.

            DESIGN                                          150           

            CONSTRUCTION                                    600           

               TOTAL FUNDING              TRN               750 B           B

 

TRN331 - KAHULUI HARBOR

 

31.         KAHULUI HARBOR, MAUI

 

            PLANS, DESIGN AND CONSTRUCTION OF A PROTRUDING PIER STRUCTURE DEDICATED TO FUEL TRANSFER.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                 48,398           

               TOTAL FUNDING              TRN            48,400 E           E

 


 

TRN395 - HARBORS ADMINISTRATION

 

32. I21     HMP HARBORS DIVISION CAPITAL IMPROVEMENT PROGRAM STAFF COSTS, STATEWIDE

 

            PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT HARBOR MODERNIZATION PLAN PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF HARBOR MODERNIZATION PLAN CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S HARBORS DIVISION.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

            PLANS                                         1,735       1,735

               TOTAL FUNDING              TRN             1,735 E      1,735 E

 

33. I13     CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

 

            CONSTRUCTION FOR CONSULTANT SERVICES FOR CONSTRUCTION PROJECTS AT HARBOR FACILITIES STATEWIDE.

            CONSTRUCTION                                  1,500           

               TOTAL FUNDING              TRN             1,500 B           B

 

34. I06     ARCHITECTURAL AND ENGINEERING SUPPORT, STATEWIDE

 

            DESIGN FOR CONSULTANT SERVICES DURING THE DESIGN OF CAPITAL PROJECTS AT HARBOR FACILITIES STATEWIDE.

            DESIGN                                          200         200

               TOTAL FUNDING              TRN               200 B        200 B

 


 

35. I20     HMP CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

 

            CONSTRUCTION FOR CONSULTANT SERVICES DURING CONSTRUCTION OF HARBOR MODERNIZATION PLAN PROJECTS AT HARBOR FACILITIES STATEWIDE.

            CONSTRUCTION                                  2,500           

               TOTAL FUNDING              TRN             2,500 E           E

 

36. I01     HARBOR PLANNING, STATEWIDE

 

            PLANS FOR CONTINUING HARBOR STUDIES, RESEARCH, AND ADVANCE PLANNING OF HARBOR AND TERMINAL FACILITIES ON ALL ISLANDS.

            PLANS                                         1,000           

               TOTAL FUNDING              TRN             1,000 B           B

 

37. I22     HMP PROGRAMMATIC MANAGEMENT SUPPORT, STATEWIDE

 

            PLANS FOR CONSULTANT SERVICES DURING PLANS, DESIGN AND CONSTRUCTION OF HARBORS MODERNIZATION PLAN PROJECTS AT HARBOR FACILITIES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  THIS IS A HARBOR MODERNIZATION PROJECT.

            PLANS                                         5,001           

               TOTAL FUNDING              TRN             5,000 E           E

                                          TRN                 1 N           N

 


 

38. I15     SECURITY IMPROVEMENTS AT COMMERCIAL HARBORS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR SECURITY SYSTEM IMPROVEMENTS AT COMMERCIAL HARBOR FACILITIES, STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             2           

            DESIGN                                            2           

            CONSTRUCTION                                  5,000           

               TOTAL FUNDING              TRN             1,002 B           B

                                          TRN             4,002 N           N

 

39. I03     MISCELLANEOUS IMPROVEMENTS TO FACILITIES AT NEIGHBOR ISLAND PORTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, AND OTHER FACILITIES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          250         250

            CONSTRUCTION                                  1,000       1,000

               TOTAL FUNDING              TRN             1,250 B      1,250 B

 


 

40. I05     MISCELLANEOUS IMPROVEMENTS TO PORT FACILITIES, OAHU

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, MARITIME-INDUSTRIAL FACILITIES, AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          250         250

            CONSTRUCTION                                  1,000       1,000

               TOTAL FUNDING              TRN             1,250 B      1,250 B

 

41. I19     BOLLARD IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR BOLLARD IMPROVEMENTS, STATEWIDE.

            DESIGN                                          500           

            CONSTRUCTION                                    800         800

               TOTAL FUNDING              TRN             1,300 B        800 B

 

TRN501 - OAHU HIGHWAYS

 

42. S344    MISCELLANEOUS PERMANENT BEST MANAGEMENT PRACTICES, OAHU

 

            LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR PERMANENT BEST MANAGEMENT PRACTICE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF STRUCTURAL AND NATURAL BEST MANAGEMENT PRACTICES AT VARIOUS LOCATIONS ON OAHU.

            LAND                                            150           

            DESIGN                                          520           

            CONSTRUCTION                                     30       1,640

               TOTAL FUNDING              TRN               700 E      1,640 E

 


 

43. S319    PEARL CITY, WAIANAE, AND KANEOHE BASEYARDS WASHDOWN RACKS, OAHU

 

            CONSTRUCTION FOR INSTALLING WASHDOWN RACKS TO INCLUDE A WATER RECYCLING UNIT, STEAM PRESSURE WASHERS, AND A CONCRETE PAD FOR COMPLIANCE WITH THE DEPARTMENT OF HEALTH REGULATIONS AND THE CLEAN WATER ACT.

            CONSTRUCTION                                    500           

               TOTAL FUNDING              TRN               500 E           E

 

44. S318    HIGHWAY LIGHTING REPLACEMENT AT VARIOUS LOCATIONS, OAHU

 

            DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING HIGHWAY LIGHTING SYSTEM ON STATE HIGHWAYS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                                      150

            CONSTRUCTION                                              8,800

               TOTAL FUNDING              TRN                   E      1,910 E

                                          TRN                   N      7,040 N

 


 

45. S301    FARRINGTON HIGHWAY, MAKAHA BRIDGES NO. 3 AND NO. 3A REPLACEMENT, OAHU

 

            CONSTRUCTION FOR THE REPLACEMENT OF BRIDGES NO. 3 AND 3A IN THE VICINITY OF MAKAHA BEACH PARK TO INCLUDE SIDEWALKS, BRIDGE RAILINGS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  1,700           

               TOTAL FUNDING              TRN               340 E           E

                                          TRN             1,360 N           N

 

46. S296    KAMEHAMEHA HIGHWAY, KAIPAPAU STREAM BRIDGE REPLACEMENT AND/OR REHABILITATION, OAHU

 

            CONSTRUCTION FOR REPLACEMENT AND/OR REHABILITATION OF KAIPAPAU STREAM BRIDGE TO INCLUDE SIDEWALKS, BRIDGE RAILINGS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 18,500           

               TOTAL FUNDING              TRN             3,700 E           E

                                          TRN            14,800 N           N

 


 

47. S317    KAMEHAMEHA HIGHWAY, REHABILITATION OF WAIPILOPILO STREAM BRIDGE, OAHU

 

            LAND ACQUISITION FOR REHABILITATION OF A CONCRETE TEE-BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF HAUULA TO INCLUDE BRIDGE RAILINGS, WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            250           

               TOTAL FUNDING              TRN                50 E           E

                                          TRN               200 N           N

 

48. S348    FARRINGTON HIGHWAY, ULEHAWA STREAM BRIDGE REHABILITATION, OAHU

 

            LAND ACQUISITION AND DESIGN FOR THE REHABILITATION OF ULEHAWA STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALITY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            300           

            DESIGN                                        1,500           

               TOTAL FUNDING              TRN               360 E           E

                                          TRN             1,440 N           N

 


 

49. S328    KAMEHAMEHA HIGHWAY, REHABILITATION AND/OR REPLACEMENT OF MAKAUA STREAM BRIDGE, OAHU

 

            LAND ACQUISITION AND DESIGN FOR THE REHABILITATION AND/OR REPLACEMENT OF MAKAUA STREAM BRIDGE TO INCLUDE BRIDGE RAILINGS, SHOULDERS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            250           

            DESIGN                                          450           

               TOTAL FUNDING              TRN               140 E           E

                                          TRN               560 N           N

 

50. S314    KAMEHAMEHA HIGHWAY, UPPER POAMOHO STREAM BRIDGE REPLACEMENT, OAHU

 

            LAND ACQUISITION FOR REPLACEMENT OF A MULTI-GIRDER REINFORCED CONCRETE BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF WAHIAWA TO INCLUDE BRIDGE RAILINGS, PEDESTRIAN WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            400           

               TOTAL FUNDING              TRN                80 E           E

                                          TRN               320 N           N

 


 

51. S315    KAMEHAMEHA HIGHWAY, REHABILITATION AND/OR REPLACEMENT OF LAIELOA STREAM BRIDGE, OAHU

 

            CONSTRUCTION FOR REHABILITATION AND/OR REPLACEMENT OF A CONCRETE SLAB BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF LAIE TO INCLUDE BRIDGE RAILINGS, WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  8,600           

               TOTAL FUNDING              TRN             1,720 E           E

                                          TRN             6,880 N           N

 

52. S346    INTERSTATE ROUTE H-1, KAPALAMA CANAL BRIDGE REHABILITATION, OAHU

 

            DESIGN FOR THE REHABILITATION OF KAPALAMA CANAL BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          800           

               TOTAL FUNDING              TRN               160 E           E

                                          TRN               640 N           N

 


 

53. S349    KAMEHAMEHA HIGHWAY, WAIALEE STREAM BRIDGE REPLACEMENT, OAHU

 

            LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF WAIALEE STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        500

            DESIGN                                          890           

               TOTAL FUNDING              TRN               178 E        100 E

                                          TRN               712 N        400 N

 

54. S284    INTERSTATE ROUTES H-1 AND H-2, DESTINATION SIGN UPGRADE/REPLACEMENT, OAHU

 

            DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING DESTINATION SIGNS AND SIGN SUPPORT STRUCTURES ON INTERSTATE ROUTES H-1 AND H-2.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                                      350

            CONSTRUCTION                                              2,500

               TOTAL FUNDING              TRN                   E        570 E

                                          TRN                   N      2,280 N

 


 

55. S313    INTERSTATE ROUTE H-1, ADDITION AND/OR MOD. OF FREEWAY ACCS. MAKAKILO TO PALAILAI IC, OAHU

 

            LAND ACQUISITION, DESIGN AND CONSTRUCTION TO IMPROVE AND/OR MODIFY THE MAKAKILO AND PALAILAI INTERCHANGES AND CONSTRUCT A NEW INTERCHANGE (KAPOLEI INTERCHANGE).  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        408

            DESIGN                                                      500

            CONSTRUCTION                                 23,900           

               TOTAL FUNDING              TRN             5,090 E         91 E

                                          TRN            18,810 N        817 N

 

56.         INTERSTATE ROUTE H-3, JUNCTION AT H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU

 

            DESIGN AND CONSTRUCTION FOR A DIVIDED HIGHWAY FROM JUNCTION H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                           25         113

            CONSTRUCTION                                    225       1,017

               TOTAL FUNDING              TRN                25 E        113 E

                                          TRN               225 N      1,017 N

 


 

57.         FLOOD MITIGATION, LUALUALEI VALLEY AND FARRINGTON HIGHWAY, OAHU

 

            DESIGN AND CONSTRUCTION FOR FLOOD MITIGATION EFFORTS ON FARRINGTON HIGHWAY BETWEEN MAILI AND NANAKULI, OAHU.

            DESIGN                                          500           

            CONSTRUCTION                                  7,500           

               TOTAL FUNDING              TRN             8,000 E           E

 

58.         KAHEKILI AND KAMEHAMEHA HIGHWAYS, OAHU

 

            DESIGN AND CONSTRUCTION OF MULTI-USE PATHS ALONG KAHEKILI BEGINNING AT THE INTERSECTION WITH HAIKU ROAD, ALONG KAMEHAMEHA HIGHWAY UP TO WAIAHOLE VALLEY.

            DESIGN                                          300           

            CONSTRUCTION                                  1,300           

               TOTAL FUNDING              TRN             1,600 E           E

 

59.         KALANIANAOLE HIGHWAY, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION TO UPGRADE CROSSWALK.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    298           

               TOTAL FUNDING              TRN               300 E           E

 


 

60.         FARRINGTON HIGHWAY, LAHILAHI STREET, OAHU

 

            DESIGN AND CONSTRUCTION FOR FLOOD MITIGATION SYSTEM.

            DESIGN                                          200           

            CONSTRUCTION                                    800           

               TOTAL FUNDING              TRN             1,000 E           E

 

61.         KAMEHAMEHA HIGHWAY, OAHU

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO KAMEHAMEHA HIGHWAY, INCLUDING SIGNAL OPERATION AND MONITORING IMPROVEMENTS PHASE II, A FEASIBILITY STUDY FOR BOTTLENECK INTERSECTIONS, UTILITY UNDERGROUNDING, PEARL HARBOR HISTORIC SITE GATEWAY PROJECT, AND HARS DEMONSTRATION PROGRAM.

            DESIGN                                           50           

            CONSTRUCTION                                    200           

               TOTAL FUNDING              TRN               250 E           E

 

62.         KAMEHAMEHA HIGHWAY AND KAHEKILI HIGHWAY, OAHU

 

            DESIGN AND CONSTRUCTION FOR CLEAN UP, TREE TRIMMING, INSTALLATION OF CAMERAS, BEAUTIFICATION, AND PLANTING.

            DESIGN                                                      110

            CONSTRUCTION                                              1,000

               TOTAL FUNDING              TRN                   E      1,110 E

 


 

TRN511 - HAWAII HIGHWAYS

 

63. T119    WAIMEA AND HILO BASEYARDS IMPROVEMENTS, HAWAII

 

            CONSTRUCTION TO PROVIDE WASTEWATER IMPROVEMENTS FOR THE WAIMEA BASEYARD AND A SEPTIC TANK SYSTEM TO THE HILO BASEYARD NECESSARY TO MEET DEPARTMENT OF HEALTH COMPLIANCE AND ENVIRONMENTAL PROTECTION AGENCY (EPA) COMPLIANCE.

            CONSTRUCTION                                    250           

               TOTAL FUNDING              TRN               250 E           E

 

64. T145    ROCKFALL PROTECTION/SLOPE STABILIZATION AT VARIOUS LOCATIONS, HAWAII

 

            LAND ACQUISITION AND CONSTRUCTION FOR ROCKFALL/SLOPE PROTECTION, AND SLOPE AND/OR ROADWAY STABILIZATION MITIGATION MEASURES AT VARIOUS LOCATIONS ON HAWAII.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            125           

            CONSTRUCTION                                  3,000           

               TOTAL FUNDING              TRN               625 E           E

                                          TRN             2,500 N           N

 


 

65. T110    HAWAII BELT ROAD ROCKFALL PROTECTION AT MAULUA, LAUPAHOEHOE, AND KAAWALII, HAWAII

 

            DESIGN FOR SLOPE PROTECTION ALONG ROUTE 19, HAWAII BELT ROAD IN THE VICINITY OF MAULUA GULCH, LAUPAHOEHOE GULCH, AND KAAWALII GULCH.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                                    2,000

               TOTAL FUNDING              TRN                   E        400 E

                                          TRN                   N      1,600 N

 

66. T146    HAWAII BELT ROAD, REHABILITATION OF UMAUMA STREAM BRIDGE, HAWAII

 

            CONSTRUCTION FOR THE REHABILITATION OF UMAUMA STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 20,000           

               TOTAL FUNDING              TRN             4,000 E           E

                                          TRN            16,000 N           N

 


 

67. T144    HAWAII BELT ROAD, REPLACEMENT OF PAHOEHOE STREAM BRIDGE, HAWAII

 

            LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF A CONCRETE ARCH-DECK BRIDGE ON HAWAII BELT ROAD (ROUTE 19) ON THE BIG ISLAND IN THE VICINITY OF PAPAIKOU.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                      1,100

            DESIGN                                           50           

               TOTAL FUNDING              TRN                10 E        220 E

                                          TRN                40 N        880 N

 

68. T147    HAWAII BELT ROAD, KAALAU BRIDGE REPLACEMENT, HAWAII

 

            LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF KAALAU BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        600

            DESIGN                                                    1,200

               TOTAL FUNDING              TRN                   E        360 E

                                          TRN                   N      1,440 N

 


 

69. T148    HAWAII BELT ROAD, KAPEHU BRIDGE REPLACEMENT, HAWAII

 

            LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF KAPEHU BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        700

            DESIGN                                                    1,200

               TOTAL FUNDING              TRN                   E        380 E

                                          TRN                   N      1,520 N

 

70. T126    KUAKINI HWY ROADWAY AND DRAINAGE IMPROVEMENTS, VICINITY OF KAMEHAMEHA III ROAD, HAWAII

 

            CONSTRUCTION FOR BUILDING UP PAVEMENT CROSS SLOPE TO IMPROVE DRAINAGE AND OTHER INCIDENTAL IMPROVEMENTS.

            CONSTRUCTION                                  3,400           

               TOTAL FUNDING              TRN             3,400 E           E

 

71. T149    KOHALA MOUNTAIN ROAD DRAINAGE IMPROVEMENTS, HAWAII

 

            CONSTRUCTION FOR DRAINAGE IMPROVEMENTS IN THE VICINITY OF M.P. 10.60.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                              3,000

               TOTAL FUNDING              TRN                   E        600 E

                                          TRN                   N      2,400 N

 


 

72. T136    HAWAII BELT ROAD DRAINAGE IMPROVEMENTS, VICINITY OF HAKALAU BRIDGE, HAWAII

 

            CONSTRUCTION FOR DRAINAGE IMPROVEMENTS, INCLUDING INSTALLING A DRAINAGE SPILLWAY AND BOX CULVERTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  2,000           

               TOTAL FUNDING              TRN               400 E           E

                                          TRN             1,600 N           N

 

73. T132    VOLCANO ROAD INTERSECTION AND DRAINAGE IMPROVEMENTS, VICINITY OF KULANI ROAD, HAWAII

 

            CONSTRUCTION FOR LEFT TURN LANES AND DRAINAGE IMPROVEMENTS AT THE KULANI ROAD INTERSECTION.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  2,800           

               TOTAL FUNDING              TRN               560 E           E

                                          TRN             2,240 N           N

 


 

74. T118    TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, HAWAII

 

            CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

            CONSTRUCTION                                    200           

               TOTAL FUNDING              TRN               200 E           E

 

75. T141    QUEEN KAAHUMANU HIGHWAY IMPROVEMENTS, KEAHOLE AIRPORT TO KAWAIHAE HARBOR, HAWAII

 

            PLANS FOR IMPROVEMENTS TO QUEEN KAAHUMANU HIGHWAY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                                       400

               TOTAL FUNDING              TRN                   E         80 E

                                          TRN                   N        320 N

 

76.         KUPULAU ROAD EXTENSION, HAWAII

 

            PLANS, DESIGN AND CONSTRUCTION TO REDUCE CONGESTION OF TRAFFIC ON KOMOHANA STREET.

            PLANS                                           250           

            DESIGN                                          500           

            CONSTRUCTION                                  2,000           

               TOTAL FUNDING              TRN             2,750 E           E

 


 

TRN531 - MAUI HIGHWAYS

 

77. V075    HANA HIGHWAY ROCKFALL MITIGATION, HUELO TO HANA, MAUI

 

            CONSTRUCTION TO MITIGATE ROCKFALLS AND POTENTIAL LANDSLIDE AREAS ALONG THE SLOPES OF ROUTE 360 HANA HIGHWAY AT VARIOUS LOCATIONS.

            CONSTRUCTION                                  4,382           

               TOTAL FUNDING              TRN             4,382 E           E

 

78. W0008   GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, MOLOKAI

 

            DESIGN AND CONSTRUCTION TO BUILD ASPHALT CONCRETE PAVED SHOULDERS AND INSTALLING AND/OR UPGRADING EXISTING GUARDRAILS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                           75           

            CONSTRUCTION                                    750         750

               TOTAL FUNDING              TRN               225 E        150 E

                                          TRN               600 N        600 N

 

79. V084    HANA HIGHWAY IMPROVEMENTS, HUELO TO HANA, MAUI

 

            CONSTRUCTION FOR IMPROVING, UPGRADING, AND/OR REPAIRING ROADWAYS, BRIDGES, WALLS, DRAINAGE STRUCTURES, GUARDRAILS, AND OTHER FACILITIES ON ROUTE 360 HANA HIGHWAY.

            CONSTRUCTION                                    840           

               TOTAL FUNDING              TRN               840 E           E

 


 

80. V094    HONOAPIILANI HIGHWAY, REPLACEMENT OF HONOLUA BRIDGE, MAUI

 

            LAND ACQUISITION FOR REPLACEMENT OF A CONCRETE TEE-BEAM BRIDGE ON HONOAPIILANI HIGHWAY IN THE VICINITY OF HONOLUA BAY TO INCLUDE BRIDGE RAILINGS AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            425           

               TOTAL FUNDING              TRN                85 E           E

                                          TRN               340 N           N

 

81. W014    KAMEHAMEHA V HIGHWAY, DRAINAGE IMPROVEMENTS, VICINITY OF MILE POST 12.5, MOLOKAI

 

            CONSTRUCTION TO UPGRADE THE EXISTING CULVERT, OTHER DRAINAGE FACILITIES, SHOULDERS, AND OTHER IMPROVEMENTS IN THE VICINITY OF MILE POST 12.5.

            CONSTRUCTION                                    450           

               TOTAL FUNDING              TRN               450 E           E

 

82. V099    HANA HIGHWAY, DRAINAGE IMPROVEMENTS, VICINITY OF HOOLAWA BRIDGE, MAUI

 

            DESIGN AND CONSTRUCTION TO REGRADE THE ROADWAY TO REDIRECT RUNOFF FROM THE TRAVEL LANES AND SHOULDERS AND TOWARDS THE EXISTING CULVERT.

            DESIGN                                           80           

            CONSTRUCTION                                              1,200

               TOTAL FUNDING              TRN                80 E      1,200 E

 


 

83. V098    KAHEKILI HIGHWAY DRAINAGE IMPROVEMENTS AT WAIHEE TOWN, MAUI

 

            CONSTRUCTION OF A DRAINAGE FACILITY ON KAHEKILI HIGHWAY NEAR WAIHEE TOWN.

            CONSTRUCTION                                     75           

               TOTAL FUNDING              TRN                75 E           E

 

84. V103    HANA HIGHWAY BRIDGE PRESERVATION PLAN, MAUI

 

            PLANS FOR DEVELOPING A BRIDGE PRESERVATION PLAN FOR HANA HIGHWAY IN THE VICINITY OF THE HANA PRESERVATION DISTRICT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AND FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         1,600           

               TOTAL FUNDING              TRN               320 E           E

                                          TRN             1,280 N           N

 

85. V107    KAHULUI BASEYARD IMPROVEMENTS, MAUI

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR KAHULUI BASEYARD IMPROVEMENTS.

            DESIGN                                           75           

            CONSTRUCTION                                                700

            EQUIPMENT                                                   100

               TOTAL FUNDING              TRN                75 E        800 E

 


 

86. V051    HONOAPIILANI HIGHWAY WIDENING AND/OR REALIGNMENT, HONOKOWAI TO LAUNIUPOKO, MAUI

 

            LAND ACQUISITION AND CONSTRUCTION FOR A NEW ALIGNMENT OF HONOAPIILANI HIGHWAY FROM LAHAINALUNA ROAD TO THE VICINITY OF LAUNIUPOKO.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                         50

            CONSTRUCTION                                 32,000           

               TOTAL FUNDING              TRN            13,000 E         10 E

                                          TRN            17,500 N         40 N

                                          TRN             1,500 S           S

 

87. V100    HANA HIGHWAY IMPROVEMENTS, VICINITY OF MILEPOST 28.1, MAUI

 

            LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR ROADWAY WIDENING AND/OR REALIGNMENT AND OTHER IMPROVEMENTS ALONG HANA HIGHWAY IN THE VICINITY OF MILEPOST 28.1.

            LAND                                             50           

            DESIGN                                          105           

            CONSTRUCTION                                                675

               TOTAL FUNDING              TRN               155 E        675 E

 

88. V089    HANA HIGHWAY IMPROVEMENTS, UAKEA ROAD TO KEAWA PLACE, MAUI

 

            CONSTRUCTION FOR WIDENING THE EXISTING ROADWAY AND CONSTRUCT SAFETY IMPROVEMENTS.

            CONSTRUCTION                                    290           

               TOTAL FUNDING              TRN               290 E           E

 


 

89. V083    TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, MAUI

 

            DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

            DESIGN                                          125           

            CONSTRUCTION                                  2,690       1,000

               TOTAL FUNDING              TRN             2,815 E      1,000 E

 

90. V063    KAHULUI AIRPORT ACCESS ROAD, MAUI

 

            CONSTRUCTION FOR A PORTION OF THE NEW ACCESS ROAD TO KAHULUI AIRPORT FROM THE VICINITY OF PUUNENE AVENUE TO HANA HIGHWAY.  INCLUDES AN AT-GRADE INTERSECTION AT HANA HIGHWAY, STRIPING, LANDSCAPING, DRAINAGE, HIGHWAY LIGHTING, UTILITIES, AND OTHER MISCELLANEOUS IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                              9,525

               TOTAL FUNDING              TRN                   E      1,905 E

                                          TRN                   N      7,620 N

 


 

91.         HALEAKALA HIGHWAY IMPROVEMENTS, MAUI

 

            CONSTRUCTION TO INSTALL RIGHT TURN LANE ON WEST-BOUND HALEAKALA HIGHWAY, INSTALL WALKWAYS AND PAVED SHOULDERS AND/OR SIDEWALKS FROM INTERSECTION TO KING KEKAULIKE HIGH SCHOOL ENTRANCES, AND TO MAKE TRAFFIC SIGNAL IMPROVEMENTS, SIGNAGE, MARKINGS, AND OTHER RELATED IMPROVEMENTS.

            CONSTRUCTION                                  1,500           

               TOTAL FUNDING              TRN             1,500 E           E

 

TRN561 - KAUAI HIGHWAYS

 

92. X051    GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, KAUAI

 

            CONSTRUCTION FOR INSTALLING AND/OR UPGRADING OF GUARDRAILS, END TERMINALS, TRANSITIONS, BRIDGE RAILINGS, BRIDGE ENDPOSTS AND CRASH ATTENUATORS; AND RECONSTRUCTING AND PAVING OF SHOULDERS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                                400

               TOTAL FUNDING              TRN                   E         80 E

                                          TRN                   N        320 N

 


 

93. X134    KUHIO HIGHWAY, SLOPE STABILIZATION AT LUMAHAI HILLSIDE, KAUAI

 

            LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR SLOPE STABILIZATION AT LUMAHAI HILLSIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                            150           

            DESIGN                                          400           

            CONSTRUCTION                                              2,000

               TOTAL FUNDING              TRN               550 E        400 E

                                          TRN                   N      1,600 N

 

94. X128    KUHIO HIGHWAY, REPLACEMENT OF WAIOLI, WAIPA, AND WAIKOKO STREAM BRIDGES, KAUAI

 

            LAND ACQUISITION FOR THE REPLACEMENT OF WAIOLI STREAM BRIDGE, WAIPA STREAM BRIDGE, AND WAIKOKO STREAM BRIDGE ON KUHIO HIGHWAY, ROUTE 560.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        250

               TOTAL FUNDING              TRN                   E         50 E

                                          TRN                   N        200 N

 


 

95. X127    KAPULE HWY/RICE ST/WAAPA RD IMPROVEMENTS AND STRENGTHENING/WIDENING OF NAWILIWILI BRIDGE, KAUAI

 

            LAND ACQUISITION FOR THE IMPROVEMENT OF KAPULE HIGHWAY, RICE STREET AND WAAPA ROAD; AND STRENGTHENING/WIDENING OF NAWILIWILI BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            LAND                                                        150

               TOTAL FUNDING              TRN                   E         30 E

                                          TRN                   N        120 N

 

96. X124    KUHIO HIGHWAY, KAPAIA BRIDGE REPLACEMENT, KAUAI

 

            CONSTRUCTION FOR REPLACEMENT OF A MULTI-TEE BEAM REINFORCED CONCRETE GIRDER BRIDGE ON KUHIO HIGHWAY IN THE VICINITY OF KAPAIA TO INCLUDE PEDESTRIAN WALKWAYS, BRIDGE RAILINGS AND APPROACHES, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                              8,650

               TOTAL FUNDING              TRN                   E      1,730 E

                                          TRN                   N      6,920 N

 


 

97. X123    WAIMEA CANYON DRIVE/KOKEE ROAD IMPROVEMENTS, MILE POST 0 TO MILE POST 14, KAUAI

 

            CONSTRUCTION FOR PAVED SHOULDERS, INSTALLING GUARDRAILS, PAVEMENT MARKINGS AND SIGNS, AND OTHER IMPROVEMENTS IN THE VICINITY OF MILE POST 0 TO MILE POST 14.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  6,000           

               TOTAL FUNDING              TRN             1,200 E           E

                                          TRN             4,800 N           N

 

98. X007    KUHIO HIGHWAY IMPROVEMENTS, HANAMAULU TO KAPAA, KAUAI

 

            PLANS AND CONSTRUCTION FOR A NEW KAPAA BYPASS AND/OR WIDEN SECTIONS OF KUHIO HIGHWAY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         1,000           

            CONSTRUCTION                                 22,900           

               TOTAL FUNDING              TRN             7,500 E           E

                                          TRN            16,400 N           N

 


 

99. X006    KAUMUALII HIGHWAY IMPROVEMENTS, LIHUE TO WEST OF MALUHIA ROAD, KAUAI

 

            CONSTRUCTION FOR WIDENING OF KAUMUALII HIGHWAY, LIHUE TO WEST OF MALUHIA ROAD, FROM TWO TO FOUR LANES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  6,900           

               TOTAL FUNDING              TRN               800 E           E

                                          TRN             1,600 N           N

                                          TRN             4,500 S           S

 

100. X121   KUHIO HIGHWAY, REPLACEMENT OF WAINIHA BRIDGES NOS. 1, 2, AND 3, KAUAI

 

            DESIGN FOR REPLACEMENT OF WAINIHA BRIDGES NOS. 1, 2, AND 3.  PROJECT WILL CONSTRUCT BRIDGE APPROACHES, DETOUR ROADS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        1,000           

               TOTAL FUNDING              TRN             1,000 E           E

 


 

101. X112   TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS, KAUAI

 

            CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

            CONSTRUCTION                                  2,380       2,500

               TOTAL FUNDING              TRN             2,380 E      2,500 E

 

102. X135   NAWILIWILI ROAD IMPROVEMENTS, KANANI STREET TO KAUMUALII HIGHWAY, KAUAI

 

            DESIGN AND CONSTRUCTION FOR NAWILIWILI ROAD IMPROVEMENTS, INCLUDING PAVEMENT RECONSTRUCTION, SIDEWALKS, AND TRAFFIC SIGNALS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          400           

            CONSTRUCTION                                              7,500

               TOTAL FUNDING              TRN                80 E      1,500 E

                                          TRN               320 N      6,000 N

 


 

103.        ROADWAY RECONSTRUCTION, MILE MARKER 18 TO KALALAU LOOKOUT, KAUAI

 

            DESIGN AND CONSTRUCTION TO RENOVATE AND RESURFACE ROADWAY, INCLUDING DRAINAGE IMPROVEMENTS.

            DESIGN                                                      800

            CONSTRUCTION                                              7,200

               TOTAL FUNDING              TRN                   E      8,000 E

 

104.        WAINIHA BRIDGE REPLACEMENT PROJECT, KAUAI

 

            CONSTRUCTION FOR THE BRIDGE REPLACEMENT PROJECT.

            CONSTRUCTION                                 10,000           

               TOTAL FUNDING              TRN            10,000 E           E

 


 

TRN595 - HIGHWAYS ADMINISTRATION

 

105. X225   HIGHWAY DIVISION CAPITAL IMPROVEMENTS PROGRAM PROJECT STAFF COSTS, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR COSTS RELATED TO WAGES & FRINGES FOR PERMANENT PROJECT-FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CIP PROJECTS FOR DEPARTMENT OF TRANSPORTATION'S HIGHWAYS DIVISION.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CIP PROJECT RELATED POSITIONS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            LAND                                              1           1

            DESIGN                                            1           1

            CONSTRUCTION                                 17,997      17,997

               TOTAL FUNDING              TRN            12,000 B     12,000 B

                                          TRN             6,000 N      6,000 N

 

106. X227   ROCKFALL PROTECTIONS/SLOPE STABILIZATION AT VARIOUS LOCATIONS, STATEWIDE

 

            CONSTRUCTION FOR ROCKFALL/SLOPE PROTECTION AND SLOPE STABILIZATION MITIGATION MEASURES AT VARIOUS LOCATIONS STATEWIDE.  THIS PRACTICE IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                             21,000

               TOTAL FUNDING              TRN                   E      4,200 E

                                          TRN                   N     16,800 N

 


 

107. X224   HIGHWAY SHORELINE PROTECTION, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR SHORELINE PROTECTION IMPROVEMENTS OF EXISTING STATE HIGHWAY FACILITIES, INCLUDING SHORELINE PROTECTION STRUCTURES, RELOCATION AND REALIGNMENT OF THE HIGHWAY AND BEACH FILL/NOURISHMENT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        3,065         350

            CONSTRUCTION                                  5,650       5,300

               TOTAL FUNDING              TRN             4,195 E      1,410 E

                                          TRN             4,520 N      4,240 N

 

108. X097   MISCELLANEOUS DRAINAGE IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR DRAINAGE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF DRAINAGE FACILITIES, CATCH BASINS, GRATED DROP INLETS, LINED SWALES, HEADWALLS, AND CULVERTS AT VARIOUS LOCATIONS.

            DESIGN                                                      200

            CONSTRUCTION                                  1,360       1,150

               TOTAL FUNDING              TRN             1,360 E      1,350 E

 


 

109. X241   MAJOR PAVEMENT IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR MAJOR PAVEMENT RECONSTRUCTION, RESURFACING, RESTORATION AND/OR REHABILITATION ALONG STATE ROUTES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          500           

            CONSTRUCTION                                 12,500      13,000

               TOTAL FUNDING              TRN            12,000 E     12,000 E

                                          TRN             1,000 N      1,000 N

 

110. X235   MOTOR CARRIER SAFETY AND HIGHWAY SAFETY OFFICE FACILITY, STATEWIDE

 

            CONSTRUCTION TO RENOVATE AND REFURBISH EXISTING BUILDING STRUCTURES AND INSTALL MISCELLANEOUS SITE IMPROVEMENTS UNDER THE WAIMALU VIADUCT.

            CONSTRUCTION                                  1,100           

               TOTAL FUNDING              TRN             1,100 E           E

 


 

111. X099   HIGHWAY PLANNING, STATEWIDE

 

            PLANS FOR FEDERAL AID AND NON-FEDERAL AID PROGRAMS AND PROJECTS THAT INCLUDE ROADWAY CLASSIFICATION, DATA COLLECTION, LONG- AND MID-RANGE PLANNING, TRANSPORTATION NEEDS STUDIES, RESEARCH, HRS 343/NEPA STUDIES, CORRIDOR STUDIES, AND SCOPING.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         4,525       7,875

               TOTAL FUNDING              TRN               905 E      1,575 E

                                          TRN             3,620 N      6,300 N

 

112. X098   IMPROVEMENTS TO INTERSECTIONS AND HIGHWAY FACILITIES, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR TRAFFIC SAFETY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          100         250

            CONSTRUCTION                                  1,350       4,700

               TOTAL FUNDING              TRN               450 E      1,190 E

                                          TRN             1,000 N      3,760 N

 


 

113. X242   STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM (ITS) ARCHITECTURE PLAN, STATEWIDE

 

            PLANS FOR DEVELOPING A STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         1,000           

               TOTAL FUNDING              TRN               200 E           E

                                          TRN               800 N           N

 

114. X200   TRAFFIC COUNTING STATIONS AT VARIOUS LOCATIONS, STATEWIDE

 

            CONSTRUCTION FOR INSTALLING TRAFFIC DETECTOR LOOPS, ASSOCIATED WIRING, JUNCTION BOXES, CABINETS AND TELEMETRY STATIONS AT VARIOUS LOCATIONS ON STATE ROADWAYS, INCLUDING AUTOMATIC TRAFFIC RECORDERS AND OTHER DATA PROCESSING IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                                 75

               TOTAL FUNDING              TRN                   E         15 E

                                          TRN                   N         60 N

 


 

115.        STUDY ON ALTERNATIVE ACCESS ROAD INTO AND OUT OF LEEWARD COAST, OAHU

 

            PLANS FOR AN ALTERNATIVE ACCESS ROAD MAUKA OF FARRINGTON HIGHWAY BEGINNING AT LUALUALEI NAVAL MAGAZINE ROAD TO PROVIDE ACCESS INTO AND OUT OF THE LEEWARD COAST, OAHU. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                         1,000           

               TOTAL FUNDING              TRN               200 E           E

                                          TRN               800 N           N

 

116.        ALTERNATIVE ACCESS AND TRAFFIC MITIGATION STUDY FROM MILILANI ON TO THE H-2 FREEWAY, OAHU

 

            PLANS FOR AN ALTERNATE ACCESS OR MODIFICATION OF EXISTING ACCESS, AS WELL AS TRAFFIC MITIGATION MEASURES TO PROVIDE ACCESS FROM MILILANI ON TO THE H-2 FREEWAY.

            PLANS                                           350           

               TOTAL FUNDING              TRN               350 E           E

 


 

D.  ENVIRONMENTAL PROTECTION

HTH840 - ENVIRONMENTAL MANAGEMENT

 

1. 840121   WASTEWATER TREATMENT REVOLVING FUND FOR POLLUTION CONTROL, STATEWIDE

 

            CONSTRUCTION FUNDS TO PROVIDE STATE MATCH (20%) FOR FEDERAL CAPITALIZATION GRANTS FOR WASTEWATER PROJECTS.  FUNDS TO BE TRANSFERRED TO THE WATER POLLUTION CONTROL REVOLVING FUND PURSUANT TO CHAPTER 342D, HRS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 18,938      18,938

               TOTAL FUNDING              HTH             3,157 C      3,157 C

                                          HTH            15,781 N     15,781 N

 

2. 840122   SAFE DRINKING WATER REVOLVING FUND, STATEWIDE

 

            CONSTRUCTION FUNDS TO PROVIDE STATE MATCH (20%) FOR FEDERAL CAPITALIZATION GRANTS FOR DRINKING WATER PROJECTS.  FUNDS TO BE TRANSFERRED TO THE DRINKING WATER TREATMENT REVOLVING FUND LOAN, PURSUANT TO CHAPTER 340E, HRS.  THIS PROJECT IS DEEMED NECESSARY TO QUALITY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                 16,288      16,288

               TOTAL FUNDING              HTH             2,715 C      2,715 C

                                          HTH            13,573 N     13,573 N

 


 

LNR401 - AQUATIC RESOURCES

 

3.          HANALEI RIVER, KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION TO UPGRADE, REPAIR AND REINFORCE THE HANALEI RIVER BREACH. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    998           

               TOTAL FUNDING              LNR             1,000 C           C

 

LNR402 - NATIVE RESOURCES AND FIRE PROTECTION PROGRAM

 

4.          LUMP SUM IMPROVEMENTS AT DOFAW FACILITIES FOR NATIVE RESOURCES AND/OR FIRE PROTECTION, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AT DOFAW FACILITIES FOR NATIVE RESOURCES AND/OR FIRE PROTECTION, STATEWIDE.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  1,178       2,498

               TOTAL FUNDING              LNR             1,180 C      2,500 C

 


 

LNR405 - CONSERVATION AND RESOURCES ENFORCEMENT

 

5.          LUMP SUM IMPROVEMENTS AT DOCARE OFFICE AND/OR BASEYARD FACILITIES, STATEWIDE

 

            CONSTRUCTION FOR VARIOUS IMPROVEMENTS AT DOCARE OFFICE AND/OR BASEYARD FACILITIES, STATEWIDE.

            CONSTRUCTION                                    280         120

               TOTAL FUNDING              LNR               280 C        120 C

 

LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

 

6. G01B     CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

 

            PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF LAND AND NATURAL RESOURCES.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

            PLANS                                         2,540       2,540

               TOTAL FUNDING              LNR             2,540 C      2,540 C

 


 

7. G01C     TSUNAMI DAMAGE RESPONSE AT DLNR FACILITIES, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO ADDRESS, REPAIR AND/OR RECONSTRUCT DLNR FACILITIES DAMAGED IN THE MARCH 2011 TSUNAMI RESULTING FROM THE PACIFIC EARTHQUAKE.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  7,798           

               TOTAL FUNDING              LNR             7,800 C           C

 


 

E.  HEALTH

HTH595 - HEALTH RESOURCES ADMINISTRATION

 

1.          HALE HOOLUOLU HOSPICE FACILITY, MAUI

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT OF A 12-BED HOSPICE CENTER ON THE ISLAND OF MAUI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            LAND                                              1           

            DESIGN                                            1           

            CONSTRUCTION                                    496           

            EQUIPMENT                                         1           

               TOTAL FUNDING              HTH               500 C           C

 

2.          MOLOKAI OHANA HEALTH CENTER, MOLOKAI

 

            DESIGN AND CONSTRUCTION FOR RENOVATION AND RELOCATION OF THE MOLOKAI COMMUNITY HEALTH CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                    499           

               TOTAL FUNDING              HTH               500 C           C

 


 

3.          REHABILITATION HOSPITAL OF THE PACIFIC FOUNDATION, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE REHAB HOSPITAL OF THE PACIFIC FOR HEALTH AND SAFETY. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  2,498           

               TOTAL FUNDING              HTH             2,500 C           C

 

4.          WAHIAWA GENERAL HOSPITAL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR MODERNIZATION AND EXPANSION OF EMERGENCY DEPARTMENT. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  2,498           

               TOTAL FUNDING              HTH             2,500 C           C

 

HTH210 - HAWAII HEALTH SYSTEMS CORPORATION – CORPORATE OFFICE

 

5.          LANAI COMMUNITY HOSPITAL, LANAI

 

            PLANS AND DESIGN FOR EMERGENCY ROOM EXPANSION; FIRE SUPPRESSION & EXHAUST VENTILATION SYSTEM; REPAIRS, INSTALLATION OF HURRICANE WINDOW UPGRADE; MASTER PLANNING.

            PLANS                                             1           

            DESIGN                                        1,339           

               TOTAL FUNDING              HTH             1,340 C           C

 


 

HTH212 - HAWAII HEALTH SYSTEMS CORPORATION –  REGIONS

 

6.          HAWAII HEALTH SYSTEMS CORPORATION, HEALTH AND SAFETY PROJECTS, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR PROJECTS THAT ARE OF HEALTH AND SAFETY TO THE FACILITIES IN THE HAWAII HEALTH SYSTEMS CORPORATION.

            DESIGN                                            1           1

            CONSTRUCTION                                 14,998      14,998

            EQUIPMENT                                         1           1

               TOTAL FUNDING              HTH            15,000 C     15,000 C

 

7.          KONA COMMUNITY HOSPITAL UPGRADE, HAWAII

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO REPAIR AND UPGRADE THE EMERGENCY/ DISASTER INFRASTRUCTURE.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  4,997           

            EQUIPMENT                                         1           

               TOTAL FUNDING              HTH             5,000 C           C

 

8.          KAHUKU MEDICAL CENTER, OAHU

 

            PLANS, DESIGN, AND CONSTRUCTION TO UPGRADE AND RENOVATE HOSPITAL FACILITIES. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  4,998           

               TOTAL FUNDING              HTH             5,000 C           C

 


 

HTH430 - ADULT MENTAL HEALTH - INPATIENT

 

9. 430122   HAWAII STATE HOSPITAL, REPAIRS AND IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR VARIOUS REPAIRS AND IMPROVEMENTS.

            DESIGN                                        1,430           

            CONSTRUCTION                                 10,184           

               TOTAL FUNDING              AGS            11,614 C           C

 

HTH907 - GENERAL ADMINISTRATION

 

10. 907121  DEPARTMENT OF HEALTH, HEALTH AND SAFETY, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO HEALTH FACILITIES STATEWIDE.  PROJECTS ARE NECESSARY TO MAINTAIN HEALTH AND SAFETY FOR CLIENTS AND STAFF.

            DESIGN                                          495         620

            CONSTRUCTION                                  3,633       3,508

               TOTAL FUNDING              AGS             4,128 C      4,128 C

 

11. 907122  DEPARTMENT OF HEALTH, ENERGY EFFICIENCY IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO HEALTH FACILITIES STATEWIDE TO PROVIDE FOR ENERGY SAVINGS.

            DESIGN                                          466           

            CONSTRUCTION                                  1,751           

               TOTAL FUNDING              AGS             2,217 C           C

 


 

12.         DEPARTMENT OF HEALTH, REPAIRS AND IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS TO HEALTH FACILITIES, STATEWIDE

            DESIGN                                          827         191

            CONSTRUCTION                                  6,338       1,112

               TOTAL FUNDING              AGS             7,165 C      1,303 C

 


 

F.  SOCIAL SERVICES

DEF112 - SERVICES TO VETERANS

 

1. P90037   VETERANS CEMETERY IMPROVEMENTS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR MISCELLANEOUS UPGRADES AND IMPROVEMENTS TO VETERANS CEMETERIES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  6,760       3,033

               TOTAL FUNDING              DEF             6,761 C      3,034 C

                                          DEF                 1 N          1 N

 

2. P70036   COLUMBARIA NICHES, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR ADDITIONAL COLUMBARIA NICHES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          200           

            CONSTRUCTION                                  1,000           

               TOTAL FUNDING              DEF             1,199 C           C

                                          DEF                 1 N           N

 


 

3. OVS004   AIEA BAY PUMPHOUSE PROPERTY ENVIRONMENTAL REMEDIATION, OAHU

 

            DESIGN AND CONSTRUCTION FOR REMEDIATION ACTION FOR ENVIRONMENTAL CLEANUP.  SITE ASSESSMENT WILL INCLUDE A PRIORITY FOCUS ON THE MERCURY CONTAMINATION ISSUES.  MAY ALSO INCLUDE MISCELLANEOUS WORK RELATING TO SITE CLEANUP, SECURITY OF PROPERTY, AND VARIOUS CLOSE OUT ACTIONS REQUIRED BY OTHER STATE AND FEDERAL GOVERNMENT AGENCIES.

            DESIGN                                          100           

            CONSTRUCTION                                                500

               TOTAL FUNDING              DEF               100 C        500 C

 

4.          USS MISSOURI MEMORIAL ASSOCIATION, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    158           

               TOTAL FUNDING              DEF               160 C           C

 

HMS220 - RENTAL HOUSING SERVICES

 

5.          KUHIO PARK TERRACE IMPROVEMENTS, OAHU

 

            CONSTRUCTION FOR DRY STANDPIPE, RAISED CROSSWALK AND SITE IMPROVEMENTS.

            CONSTRUCTION                                  9,200       7,000

               TOTAL FUNDING              HMS             9,200 C      7,000 C

 


 

6. HPHA02   MAYOR WRIGHT HOMES, RENOVATIONS AND IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR MAYOR WRIGHT HOMES, TO INCLUDE THE REMOVAL OF SOLAR WATER HEATERS, ROOF REPLACEMENT, INSTALLATION OF INSTANT HOT WATER SYSTEM, PAINTING, AND OTHER IMPROVEMENTS.

            DESIGN                                            1           

            CONSTRUCTION                                  5,599           

               TOTAL FUNDING              HMS             5,600 C           C

 

7. HPHA03   PALOLO VALLEY HOMES PHYSICAL IMPROVEMENTS PHASE 2, OAHU

 

            CONSTRUCTION FOR PALOLO VALLEY HOMES, PHYSICAL IMPROVEMENTS PHASE 2.

            CONSTRUCTION                                  5,000           

               TOTAL FUNDING              HMS             5,000 C           C

 

8. HPHA05   LANAKILA HOMES, MASTER PLAN FOR DEMOLITION OF REMAINING PARCELS, HAWAII

 

            PLANS FOR LANAKILA HOMES, MASTER PLAN FOR THE DEMOLITION OF REMAINING PARCELS.

            PLANS                                           100           

               TOTAL FUNDING              HMS               100 C           C

 


 

9. HPHA06   LANAKILA HOMES, RENOVATION OF EXISTING BUILDINGS, HAWAII

 

            DESIGN AND CONSTRUCTION FOR LANAKILA HOMES, RENOVATION OF EXISTING BUILDINGS.

            DESIGN                                          750           

            CONSTRUCTION                                              7,500

               TOTAL FUNDING              HMS               750 C      7,500 C

 

10. HPHA07  HALE LAULIMA, MAJOR MODERNIZATION, ROOF REPLACEMENT, TERMITE DAMAGE, OAHU

 

            CONSTRUCTION FOR HALE LAULIMA, TO INCLUDE MAJOR MODERNIZATION, ROOF REPLACEMENT, AND EXTENSIVE TERMITE DAMAGE REPAIR.

            CONSTRUCTION                                              5,000

               TOTAL FUNDING              HMS                   C      5,000 C

 

11. HPHA08  ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS, STATEWIDE

 

            CONSTRUCTION FOR RENOVATIONS FOR ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS.

            CONSTRUCTION                                 10,000      10,000

               TOTAL FUNDING              HMS            10,000 C     10,000 C

 


 

12. HPHA09  PUAHALA HOMES, PHASE 1B ABATEMENT AND MODERNIZATION BUILDINGS 4, 5, 6, OAHU

 

            DESIGN AND CONSTRUCTION FOR PUAHALA HOMES, TO INCLUDE PHASE 1B ABATEMENT AND MODERNIZATION OF BUILDINGS 4, 5, AND 6.

            DESIGN                                          105           

            CONSTRUCTION                                              1,900

               TOTAL FUNDING              HMS               105 C      1,900 C

 

13. HPHA10  KALIHI VALLEY HOMES, SITE AND DWELLING IMPROVEMENTS PHASE IV, OAHU

 

            DESIGN AND CONSTRUCTION FOR KALIHI VALLEY HOMES, TO INCLUDE SITE AND DWELLING IMPROVEMENTS PHASE IV.

            DESIGN                                          700           

            CONSTRUCTION                                              7,000

               TOTAL FUNDING              HMS               700 C      7,000 C

 

14. HPHA11  HAUIKI HOMES, SITE WORK AND ROOF REPAIRS, OAHU

 

            DESIGN AND CONSTRUCTION FOR HAUIKI HOMES, SITE WORK AND ROOF REPAIRS.

            DESIGN                                           65           

            CONSTRUCTION                                                600

               TOTAL FUNDING              HMS                65 C        600 C

 


 

15. HPHA12  KAAHUMANU HOMES, SPALL REPAIR AND PAINTING FOR 19 BUILDINGS, SITE IMPROVEMENTS, OAHU

 

            DESIGN AND CONSTRUCTION FOR KAAHUMANU HOMES, TO INCLUDE SPALL REPAIR AND PAINTING FOR 19 BUILDINGS, SITE IMPROVEMENTS, AND INTERIOR RENOVATIONS.

            DESIGN                                          550           

            CONSTRUCTION                                  1,800       1,800

               TOTAL FUNDING              HMS             2,350 C      1,800 C

 

16. HPHA13  POMAIKAI, MAJOR RENOVATIONS AND SITE IMPROVEMENTS, HAWAII

 

            CONSTRUCTION FOR POMAIKAI, TO INCLUDE MAJOR RENOVATIONS, ROOF REPLACEMENT, INTERIOR REPAIRS, EXTERIOR AND SITE IMPROVEMENTS.

            CONSTRUCTION                                  2,000           

               TOTAL FUNDING              HMS             2,000 C           C

 

17. HPHA14  DAVID MALO CIRCLE, EXTERIOR IMPROVEMENTS AND SITE WORK, MAUI

 

            DESIGN FOR DAVID MALO CIRCLE, TO INCLUDE EXTERIOR IMPROVEMENTS, PAINTING, ROOF REPAIRS, AND SITE WORK.

            DESIGN                                        1,800           

               TOTAL FUNDING              HMS             1,800 C           C

 


 

HHL602 - PLANNING AND DEVELOPMENT FOR HAWAIIAN HOMESTEADS

 

18. P11013  NAHASDA DEVELOPMENT PROJECTS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR VARIOUS HAWAIIAN HOMESTEAD PROJECTS AND IMPROVEMENTS STATEWIDE, PURSUANT TO THE NATIVE AMERICAN HOUSING ASSISTANCE AND SELF-DETERMINATION ACT, PUBLIC LAW 107-73, 107TH CONGRESS.  FUNDS NOT NEEDED IN A COST ELEMENT MAY BE USED IN ANOTHER.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                 19,998      19,998

               TOTAL FUNDING              HHL            20,000 N     20,000 N

 

19. P11002  PAPAKOLEA SEWER SYSTEM UPGRADES, PAPAKOLEA, OAHU

 

            DESIGN AND CONSTRUCTION TO REBUILD EXISTING SEWER SYSTEM IN DHHL PAPAKOLEA SUBDIVISION.

            DESIGN                                            1           

            CONSTRUCTION                                  4,999           

               TOTAL FUNDING              HHL             5,000 C           C

 


 

HTH904 - EXECUTIVE OFFICE ON AGING

 

20.         PALOLO CHINESE HOME, OAHU

 

            CONSTRUCTION FOR RENOVATION OF THE DINING HALL IN THE CARE HOME BUILDING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            CONSTRUCTION                                    500           

               TOTAL FUNDING              HTH               500 C           C

 


 

G.  FORMAL EDUCATION

EDN100 - SCHOOL-BASED BUDGETING

 

1. 20       LUMP SUM CIP -- SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE.  MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING AND ROOF MAINTENANCE AGREEMENTS, AIR CONDITIONING, PAINTING, PLUMBING, FURNITURE AND REPLACEMENT FURNITURE, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

            DESIGN                                        2,000      10,000

            CONSTRUCTION                                  8,288      51,500

               TOTAL FUNDING              EDN            10,288 B     61,500 B

 

2. 10       LUMP SUM CIP -- PROJECT ADJUSTMENT FUND, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT.  OTHER DEPARTMENT OF EDUCATION PROJECTS WITHIN THIS ACT WITH UNREQUIRED BALANCES MAY BE TRANSFERRED INTO THIS PROJECT.

            PLANS                                             1           1

            LAND                                              1           1

            DESIGN                                          600         600

            CONSTRUCTION                                  1,397       1,397

            EQUIPMENT                                         1           1

               TOTAL FUNDING              EDN             2,000 B      2,000 B

 


 

3. 001001   LUMP SUM CIP -- RELOCATE/CONSTRUCT TEMPORARY FACILITIES, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR RELOCATION OR CONSTRUCTION OF TEMPORARY FACILITIES (INCLUDING RESTROOMS) AND RELATED SITE IMPROVEMENTS, EACH SCHOOL YEAR TO MEET ENROLLMENT SHIFTS, UNFORESEEN EMERGENCIES, AND TO PROVIDE TEMPORARY FACILITIES WHILE NEW SCHOOLS ARE BEING PLANNED AND/OR CONSTRUCTED; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                        2,000         964

            CONSTRUCTION                                  5,676       3,880

            EQUIPMENT                                       324         156

               TOTAL FUNDING              EDN             8,000 B      5,000 B

 

4. 006      LUMP SUM CIP -- ADA COMPLIANCE, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR THE PROVISION OF RAMPS, ELEVATORS, AND OTHER CORRECTIVE MEASURES FOR ACCESSIBILITY TO SCHOOL FACILITIES FOR HANDICAPPED PERSONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          900         500

            CONSTRUCTION                                  4,100       2,000

               TOTAL FUNDING              EDN             5,000 B      2,500 B

 


 

5. 009      LUMP SUM CIP -- HEALTH AND SAFETY, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO SCHOOL FACILITIES AND GROUNDS TO MEET HEALTH AND SAFETY REQUIREMENTS INCLUDING FIRE PROTECTION PROVISIONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          400         400

            CONSTRUCTION                                  1,100       1,100

               TOTAL FUNDING              EDN             1,500 B      1,500 B

 

6. 008009   LUMP SUM CIP -- HAZARDOUS MATERIALS REMOVAL, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR THE CORRECTION, AND RENOVATION OF ALL EXISTING SCHOOL BUILDINGS AND CAMPUSES RELATED TO THE IDENTIFICATION AND/OR REMOVAL OF HAZARDOUS MATERIALS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                           100          50

            DESIGN                                          200         150

            CONSTRUCTION                                    700         800

               TOTAL FUNDING              EDN             1,000 B      1,000 B

 


 

7. 012      LUMP SUM CIP -- ELECTRICAL/INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ELECTRICAL, TELECOMMUNICATIONS, PROGRAM BELL AND OTHER INFRASTRUCTURE IMPROVEMENTS AT VARIOUS SCHOOLS.

            PLANS                                             1           1

            DESIGN                                            1         498

            CONSTRUCTION                                 10,797       1,500

            EQUIPMENT                                         1           1

               TOTAL FUNDING              EDN            10,800 B      2,000 B

 

8. 031      LUMP SUM CIP -- HIGH SCHOOL SCIENCE FACILITIES UPGRADES, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE IMPROVEMENT OF EXISTING OR NEW HIGH SCHOOL SCIENCE FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                        2,000         200

            CONSTRUCTION                                 12,500       4,800

            EQUIPMENT                                       500           

               TOTAL FUNDING              EDN            15,000 B      5,000 B

 

9. 000007   LUMP SUM CIP -- SPECIAL EDUCATION RENOVATIONS, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE CLASSROOMS TO ADDRESS SPECIAL EDUCATION NEEDS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          200         200

            CONSTRUCTION                                    799         799

            EQUIPMENT                                         1           1

               TOTAL FUNDING              EDN             1,000 B      1,000 B

 


 

10. 19      LUMP SUM CIP -- GENDER EQUITY, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR GENDER EQUITY PROJECTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          450         450

            CONSTRUCTION                                  1,500       1,500

            EQUIPMENT                                        50          50

               TOTAL FUNDING              EDN             2,000 B      2,000 B

 

11. 004004  LUMP SUM CIP -- NOISE/HEAT ABATEMENT, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR CORRECTIVE MEASURES TO SCHOOLS AFFECTED BY EXCESSIVE NOISE AND VENTILATION PROBLEMS.

            DESIGN                                          500         400

            CONSTRUCTION                                  2,500       1,600

               TOTAL FUNDING              EDN             3,000 B      2,000 B

 

12. 002002  LUMP SUM CIP -- MINOR RENOVATIONS AND IMPROVEMENTS, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR MINOR ADDITIONS, RENOVATIONS AND IMPROVEMENTS TO BUILDINGS AND SCHOOL SITES TO IMPROVE THE EDUCATIONAL PROGRAM AND TO CORRECT EDUCATIONAL SPECIFICATIONS DEFICIENCIES, INCLUDING STATE AND DISTRICT OFFICE IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          300         400

            CONSTRUCTION                                  1,625       1,000

            EQUIPMENT                                        75         100

               TOTAL FUNDING              EDN             2,000 B      1,500 B

 


 

13. 18      LUMP SUM CIP -- MASTER PLAN/LAND ACQUISITION, STATEWIDE

 

            PLANS AND LAND ACQUISITION FOR MASTER PLANNING, SITE SELECTION, PRE-LAND ACQUISITION STUDIES, ACQUISITION OF PARCELS, ACQUISITION SERVICES, FEASIBILITY STUDIES TO UPGRADE EXISTING FACILITIES, AND OTHER SERVICES NEEDED TO MEET FUTURE AND UNFORESEEN NEEDS.

            PLANS                                           500         500

            LAND                                            500         500

               TOTAL FUNDING              EDN             1,000 B      1,000 B

 

14. 031     LUMP SUM CIP -- ENERGY IMPROVEMENTS, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ENERGY IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                           200         200

            DESIGN                                          300         300

            CONSTRUCTION                                  1,499       1,499

            EQUIPMENT                                         1           1

               TOTAL FUNDING              EDN             2,000 B      2,000 B

 


 

15.         LUMP SUM CIP -- PLAYGROUND EQUIPMENT AND ACCESSIBILITY, STATEWIDE

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO REPLACE PLAYGROUND EQUIPMENT WHICH DO NOT MEET SAFETY STANDARDS, PROVIDE APPROPRIATE PADDING IN THE AREA OF PLAYGROUND EQUIPMENT, PROVIDE ACCESSIBILITY TO THE PLAY AREAS/EQUIPMENT PER AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG); GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                           50          50

            CONSTRUCTION                                    449         449

            EQUIPMENT                                         1           1

               TOTAL FUNDING              EDN               500 B        500 B

 

16.         AIEA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING. GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    199           

               TOTAL FUNDING              EDN               200 B           B

 

17.         AIEA HIGH SCHOOL, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO COMPLETE THE EXPANSION AND RENOVATION FOR THE ADMINISTRATION BUILDING, AND GROUND AND SITE APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    228           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN               230 B           B

 


 

18.         AINA HAINA ELEMENTARY SCHOOL, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR VARIOUS PROJECTS AT THE SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    252           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN               255 B           B

 

19.         ALA WAI ELEMENTARY SCHOOL, OAHU

 

            CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES.

            CONSTRUCTION                                  1,000           

               TOTAL FUNDING              EDN             1,000 B           B

 

20. 120028  DOE DATA CENTER, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR BACKUP GENERATOR FOR EXISTING DATA CENTER OR NEW DATA CENTER AT A DIFFERENT SITE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          300           

            CONSTRUCTION                                  1,800           

            EQUIPMENT                                       100           

               TOTAL FUNDING              EDN             2,200 B           B

 


 

21. 120024  EAST KAPOLEI HIGH SCHOOL, OAHU

 

            PLANS, LAND ACQUISITION AND DESIGN FOR A NEW HIGH SCHOOL CAMPUS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                           900           

            LAND                                            100           

            DESIGN                                                    2,300

               TOTAL FUNDING              EDN             1,000 B      2,300 B

 

22. 120026  EAST KAPOLEI MIDDLE SCHOOL, OAHU

 

            DESIGN FOR A NEW MIDDLE SCHOOL CAMPUS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                        2,500           

               TOTAL FUNDING              EDN             2,500 B           B

 

23.         ENCHANTED LAKE ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS WIDE ELECTRICAL UPGRADE.

            DESIGN                                            1           

            CONSTRUCTION                                  1,399           

               TOTAL FUNDING              EDN             1,400 B           B

 

24.         EWA ELEMENTARY SCHOOL, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO CONSTRCUT AN EIGHT-CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          700           

            CONSTRUCTION                                              9,500

            EQUIPMENT                                                   100

               TOTAL FUNDING              EDN               700 B      9,600 B

 


 

25. P10128  FARRINGTON HIGH SCHOOL, OAHU

 

            PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE REHABILITATION OF THE CAMPUS FACILITIES, INCLUDING SWIMMING POOL AND LOCKER ROOM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                                         1

            DESIGN                                                        1

            CONSTRUCTION                                              4,997

            EQUIPMENT                                                     1

               TOTAL FUNDING              EDN                   B      5,000 B

 

26.         HAUULA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION OF FACULTY PARKING FACILITY, NEW DRAINAGE SYSTEM AND FLOOD CONTROL MEASURES, AND RETROFIT BUILDINGS FOR SOLAR PANELING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                           50           

            CONSTRUCTION                                    100           

               TOTAL FUNDING              EDN               150 B           B

 

27.         HELEMANO ELEMENTARY SCHOOL, OAHU

 

            PLANS AND DESIGN FOR A NEW LIBRARY AT HELEMANO ELEMENTARY SCHOOL. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          499           

               TOTAL FUNDING              EDN               500 B           B

 


 

28.         HIGHLANDS INTERMEDIATE SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO RENOVATE THE CHORUS CLASSROOM, INCLUDING ASBESTOS REMOVAL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                           80           

            CONSTRUCTION                                    400           

               TOTAL FUNDING              EDN               480 B           B

 

29.         ILIAHI ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR INSTALLATION OF COVERING FOR PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  1,499           

               TOTAL FUNDING              EDN             1,500 B           B

 

30.         JAMES CAMPBELL HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR UPGRADES AND RENOVATION TO THE ATHLETIC FIELD. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    998           

               TOTAL FUNDING              EDN             1,000 B           B

 


 

31.         JAMES B. CASTLE HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION TO REPLACE THE LIGHTING SYSTEM AND SOUND SYSTEM IN THE RONALD BRIGHT AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                            20           

            DESIGN                                           80           

            CONSTRUCTION                                    485           

               TOTAL FUNDING              EDN               585 B           B

 

32.         KAILUA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL SYTEM UPGRADE. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          100           

            CONSTRUCTION                                  1,300           

               TOTAL FUNDING              EDN             1,400 B           B

 

33.         KAILUA HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR REMOVAL AND REPLACEMENT OF SOCCER/FOOTBALL FIELD BLEACHERS/STORAGE ROOMS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                            50           

            DESIGN                                          500           

            CONSTRUCTION                                  1,950           

               TOTAL FUNDING              EDN             2,500 B           B

 


 

34.         KAISER HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR A GIRLS ATHLETIC LOCKER ROOM. PROJECTS TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          699           

            CONSTRUCTION                                              6,500

               TOTAL FUNDING              EDN               700 B      6,500 B

 

35.         KALAHEO HIGH SCHOOL, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR IMPROVEMENTS TO THE ATHLETIC FIELD. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,497           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN             1,500 B           B

 

36.         KALANI HIGH SCHOOL, OAHU

 

            DESIGN FOR GIRLS' LOCKER ROOM/SHOWER BUILDING PER TITLE IX REQUIREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          800           

               TOTAL FUNDING              EDN               800 B           B

 


 

37.         KALEIOPUU ELEMENTARY SCHOOL, OAHU

 

            CONSTRUCTION FOR ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            CONSTRUCTION                                                550

               TOTAL FUNDING              EDN                   B        550 B

 

38.         KAMAILE ELEMENTARY SCHOOL, OAHU

 

            CONSTRUCTION FOR ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            CONSTRUCTION                                                800

               TOTAL FUNDING              EDN                   B        800 B

 

39.         KANEOHE ELEMENTARY SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR ADA TRANSITION PLAN; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                            30           

            DESIGN                                          150           

            CONSTRUCTION                                    600           

               TOTAL FUNDING              EDN               780 B           B

 

40.         KANEOHE ELEMENTARY SCHOOL, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW PORTABLE CLASSROOM BUILDING.

            DESIGN                                            1           

            CONSTRUCTION                                    398           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN               400 B           B

 


 

41.         KANOELANI ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL SYSTEM UPGRADE.

            DESIGN                                            1           

            CONSTRUCTION                                    949           

               TOTAL FUNDING              EDN               950 B           B

 

42. 454051  KAPAA ELEMENTARY SCHOOL, KAUAI

 

            DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                           75           

            CONSTRUCTION                                  5,850           

            EQUIPMENT                                        75           

               TOTAL FUNDING              EDN             6,000 B           B

 

43. P90080  KAPOLEI II ELEMENTARY SCHOOL, OAHU

 

            LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW ELEMENTARY SCHOOL IN THE KAPOLEI REGION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            LAND                                                          1

            DESIGN                                                        1

            CONSTRUCTION                                             39,398

            EQUIPMENT                                                   600

               TOTAL FUNDING              EDN                   B     40,000 B

 


 

44.         KAUAI HIGH SCHOOL, KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION FOR A NEW GYMNATORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          100           

            CONSTRUCTION                                 10,835           

               TOTAL FUNDING              EDN            10,936 B           B

 

45. 370051  KEAAU MIDDLE SCHOOL, HAWAII

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          200           

            CONSTRUCTION                                  2,200           

            EQUIPMENT                                       100           

               TOTAL FUNDING              EDN             2,500 B           B

 

46.         KEONEULA ELEMENTARY SCHOOL, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR 4 NEW PORTABLE CLASSROOMS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  1,373           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN             1,375 B           B

 


 

47.         KING KEKAULIKE HIGH SCHOOL, MAUI

 

            DESIGN AND CONSTRUCTION FOR A NEW AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  1,949           

               TOTAL FUNDING              EDN             1,950 B           B

 

48.         KING LUNALILO ELEMENTARY, OAHU

 

            PLANS, CONSTRUCTION AND EQUIPMENT FOR RESURFACING OF BASKETBALL COURTS AND PURCHASE OF HOOPS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            CONSTRUCTION                                    198           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN               200 B           B

 

49.         KIPAPA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING.

            DESIGN                                                        1

            CONSTRUCTION                                                199

               TOTAL FUNDING              EDN                   B        200 B

 

50.         KOHALA HIGH SCHOOL, HAWAII

 

            PLANS AND DESIGN FOR A STEM/SCIENCE BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          799           

               TOTAL FUNDING              EDN               800 B           B

 


 

51. 120020  KUALAPUU ELEMENTARY SCHOOL, MOLOKAI

 

            DESIGN AND CONSTRUCTION FOR A NEW WATERLINE AND/OR OTHER PROVISIONS FOR FIRE SUPPRESSION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  2,749           

               TOTAL FUNDING              EDN             2,750 B           B

 

52.         LAHAINA INTERMEDIATE SCHOOL, MAUI

 

            DESIGN AND CONSTRUCTION FOR RENOVATION OF STUDENT RESTROOMS; GROUND AND SITE IMPROVEMENTS.

            DESIGN                                                       85

            CONSTRUCTION                                                855

               TOTAL FUNDING              EDN                   B        940 B

 

53. F12018  LAIE ELEMENTARY SCHOOL, OAHU

 

            CONSTRUCTION FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            CONSTRUCTION                                     62           

               TOTAL FUNDING              EDN                62 B           B

 

54.         LEHUA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO EXPAND THE SCHOOL PARKING LOT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          100           

            CONSTRUCTION                                    500           

               TOTAL FUNDING              EDN               600 B           B

 


 

55.         LINCOLN ELEMENTARY SCHOOL, OAHU

 

            DESIGN FOR AIR CONDITIONING UPGRADES FOR BUILDING C AND D IN ORDER OF PRIORITY. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          200           

               TOTAL FUNDING              EDN               200 B           B

 

56.         MANOA ELEMENTARY SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR THE RESURFACING OF THE BLACKTOP PLAY AREA FOR THE STUDENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                            10           

            DESIGN                                           10           

            CONSTRUCTION                                    480           

               TOTAL FUNDING              EDN               500 B           B

 

57.         MCKINLEY HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR A NEW SYNTHETIC TRACK AND FIELD; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  4,998           

               TOTAL FUNDING              EDN             5,000 B           B

 


 

58.         MILILANI HIGH SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO RESURFACE TENNIS COURTS, PARKING LOT, AND DRIVEWAY.

            DESIGN                                                        1

            CONSTRUCTION                                                469

               TOTAL FUNDING              EDN                   B        470 B

 

59.         MILILANI HIGH SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO REPLACE AND UPGRADE FIBER-OPTIC BACKBONE AND BUILDING NETWORK CABLING.

            DESIGN                                            1           

            CONSTRUCTION                                    999           

               TOTAL FUNDING              EDN             1,000 B           B

 

60.         MILILANI MAUKA ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR INSTALLATION OF COVERED WALKWAYS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    500           

               TOTAL FUNDING              EDN               501 B           B

 

61.         MILILANI MIDDLE SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR INSTALLATION OF A COVERING FOR OUTDOOR PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    500           

               TOTAL FUNDING              EDN               501 B           B

 


 

62.         MILILANI MIDDLE SCHOOL, OAHU

 

            CONSTRUCTION TO REPAIR AND REPLACE ROOFS ON BUILDINGS G AND F.

            CONSTRUCTION                                    750           

               TOTAL FUNDING              EDN               750 B           B

 

63.         MILILANI IKE ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR REPAIR AND RENOVATION OF COVERED PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    149           

               TOTAL FUNDING              EDN               150 B           B

 

64.         MILILANI UKA ELEMENTARY SCHOOL, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR INSTALLATION OF NEW PLAYGROUND EQUIPMENT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                     72           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN                75 B           B

 


 

65.         MOANALUA HIGH SCHOOL, OAHU

 

            CONSTRUCTION AND EQUIPMENT FOR SCHOOL AUDITORIUM/PERFORMING ARTS CENTER TO COMPLETE PHASE 1. GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

            CONSTRUCTION                                    599           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN               600 B           B

 

66.         MOMILANI ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    599           

               TOTAL FUNDING              EDN               600 B           B

 

67.         NOELANI ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO EXPAND THE CURRENT SCHOOL LIBRARY SPACE FOR AN EXPANDED LIBRARY COLLECTION, WORK SPACE, AND INCLUSION OF A TECHNOLOGY/MEDIA CENTER WITHIN THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          100           

            CONSTRUCTION                                    900           

               TOTAL FUNDING              EDN             1,000 B           B

 


 

68.         OLOMANA SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION OF A TWELVE-FOOT EXTENSION TO THE EXISTING PHYSICAL EDUCATION PORTABLE TO ACCOMMODATE INCREASING NUMBERS OF "AT-RISK" STUDENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             5           

            DESIGN                                            8           

            CONSTRUCTION                                     75           

               TOTAL FUNDING              EDN                88 B           B

 

69.         PAHOA ELEMENTARY SCHOOL, HAWAII

 

            PLANS AND DESIGN FOR A NEW CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          999           

               TOTAL FUNDING              EDN             1,000 B           B

 

70.         PEARL CITY HIGHLANDS, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    949           

               TOTAL FUNDING              EDN               950 B           B

 


 

71.         PEARLRIDGE ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  1,149           

               TOTAL FUNDING              EDN             1,150 B           B

 

72.         PRINCESS NAHIENAENA ELEMENTARY SCHOOL, MAUI

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR TWO PORTABLE CLASSROOMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                           60           

            CONSTRUCTION                                    656           

            EQUIPMENT                                        24           

               TOTAL FUNDING              EDN               740 B           B

 

73.         PUOHALA ELEMENTARY SCHOOL, OAHU

 

            PLANS AND DESIGN FOR A STRUCTURAL ASSESSMENT TO ADDRESS THE SEPARATION OF WALLS IN BUILDINGS ON CAMPUS.

            PLANS                                             1           

            DESIGN                                          249           

               TOTAL FUNDING              EDN               250 B           B

 

74.         ROYAL ELEMENTARY SCHOOL, OAHU

 

            PLANS AND DESIGN FOR BUILDING C. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          199           

               TOTAL FUNDING              EDN               200 B           B

 


 

75.         SALT LAKE ELEMENTARY SCHOOL, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE INTERIOR CLASSROOMS OF C-1; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          200           

            CONSTRUCTION                                    500           

            EQUIPMENT                                       300           

               TOTAL FUNDING              EDN             1,000 B           B

 

76.         SEAGULL SCHOOLS PRESCHOOL, OAHU

 

            CONSTRUCTION OF A NEW CLASSROOM BUILDING LOCATED AT KAPOLEI ELEMENTARY SCHOOL. THIS PROJECT QUALIFIES AS A GRANT PURSUANT TO CHAPTER 42F, HRS.

            CONSTRUCTION                                    300           

               TOTAL FUNDING              EDN               300 C           C

 

77.         STEVENSON MIDDLE SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION OF BUILDING A, MULTI-PURPOSE SCIENCE LEARNING CENTER; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                           225           

            DESIGN                                          225           

            CONSTRUCTION                                              6,750

               TOTAL FUNDING              EDN               450 B      6,750 B

 


 

78.         WAIAKEA HIGH SCHOOL, HAWAII

 

            CONSTRUCTION AND EQUIPMENT FOR THE SCHOOL'S NEW ALL-WEATHER TRACK AND FIELD FACILITY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            CONSTRUCTION                                  3,000           

            EQUIPMENT                                                   500

               TOTAL FUNDING              EDN             3,000 B        500 B

 

79.         WAIAKEAWAENA ELEMENTARY SCHOOL, HAWAII

 

            CONSTRUCTION FOR ADDITIONAL PARKING ON KINOOLE STREET; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            CONSTRUCTION                                                450

               TOTAL FUNDING              EDN                   B        450 B

 

80.         WAIAU ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                                        1

            CONSTRUCTION                                              1,199

               TOTAL FUNDING              EDN                   B      1,200 B

 


 

81.         WAIMANALO ELEMENTARY AND INTERMEDIATE SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION TO INSTALL CAMPUS-WIDE IRRIGATION SYSTEM. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    499           

               TOTAL FUNDING              EDN               500 B           B

 

82. P90122  WAIPAHU ELEMENTARY SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR A CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                  8,099           

               TOTAL FUNDING              EDN             8,100 B           B

 

83.         WAIPAHU HIGH SCHOOL, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR ELECTRICAL UPGRADES IN BUILDINGS H, G, AND Q; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                     58           

               TOTAL FUNDING              EDN                60 B           B

 

84.         WAIPAHU INTERMEDIATE SCHOOL, OAHU

 

            DESIGN FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                          800           

               TOTAL FUNDING              EDN               800 B           B

 


 

85.         WASHINGTON MIDDLE SCHOOL, OAHU

 

            DESIGN AND CONSTRUCTION FOR ELECTRICAL UPGRADES FOR THE SCHOOL KITCHEN, CAFETERIA, AND BUILDING B; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            DESIGN                                            1           

            CONSTRUCTION                                    179           

               TOTAL FUNDING              EDN               180 B           B

 

EDN400 - SCHOOL SUPPORT

 

86. 000014  LUMP SUM CIP -- PROJECT POSITIONS, STATEWIDE

 

            PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT, PROJECT-FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF EDUCATION.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

            PLANS                                         5,200       5,200

               TOTAL FUNDING              EDN             5,200 B      5,200 B

 


 

EDN600 - CHARTER SCHOOLS

 

87.         WEST HAWAII EXPLORATIONS ACADEMY, HAWAII

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR RELOCATION OF CAMPUS FACILITIES.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            LAND                                              1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,496           

            EQUIPMENT                                         1           

               TOTAL FUNDING              EDN             1,500 C           C

 

88.         VOLCANO SCHOOL OF ARTS AND SCIENCES, HAWAII

 

            PLANS AND DESIGN TO RELOCATE VOLCANO SCHOOL OF ARTS AND SCIENCES TO KEAKEALANI SCHOOL IN VOLCANO VILLAGE ON THE ISLAND OF HAWAII.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                           309           

            DESIGN                                          309           

               TOTAL FUNDING              EDN               618 C           C

 


 

EDN407 - PUBLIC LIBRARIES

 

89. 01-H S  HEALTH AND SAFETY, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR HEALTH, SAFETY, ACCESSIBILITY, AND OTHER CODE REQUIREMENTS.  PROJECTS MAY INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL OF HAZARDOUS MATERIALS, RENOVATIONS FOR LIBRARY PATRONS AND EMPLOYEES, ENVIRONMENTAL CONTROLS, FIRE PROTECTION, IMPROVEMENTS TO BUILDINGS AND GROUNDS, AND OTHERS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                           200         200

            DESIGN                                          600         600

            CONSTRUCTION                                  1,200       1,200

               TOTAL FUNDING              EDN             2,000 C      2,000 C

 

90.         KANEOHE PUBLIC LIBRARY, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION OF NEW, ADA COMPLIANT CIRCULATION DESK.

            PLANS                                                         5

            DESIGN                                                        5

            CONSTRUCTION                                                 10

               TOTAL FUNDING              EDN                   C         20 C

 

91.         NEW NANAKULI PUBLIC LIBRARY, OAHU

 

            DESIGN FOR A NEW NANAKULI PUBLIC LIBRARY.

            DESIGN                                        1,075           

               TOTAL FUNDING              EDN             1,075 C           C

 


 

UOH100 - UNIVERSITY OF HAWAII, MANOA

 

92.         MOKU O LO'E  (COCONUT ISLAND), OAHU

 

            PLANS, CONSTRUCTION AND EQUIPMENT TO DEMOLISH THE OLD AND DILIPIDATED STRUCTURE THAT WAS ONCE PART OF THE PAULEY GUEST HOUSE AND RESIDENCE ON THE ISLAND. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

            PLANS                                             1           

            CONSTRUCTION                                    698           

            EQUIPMENT                                         1           

               TOTAL FUNDING              UOH               700 C           C

 

UOH210 - UNIVERSITY OF HAWAII, HILO

 

93.         UHH, STUDENT HOUSING DEVELOPMENTS, PHASE 1, HAWAII

 

            PLANS, DESIGN AND CONSTRUCTION FOR THE DEVELOPMENT OF STUDENT HOUSING FACILITIES FOR THE UNIVERSITY OF HAWAII AT HILO; GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                 31,998           

               TOTAL FUNDING              UOH            16,000 C           C

                                          UOH            16,000 E           E

 


 

94.         LIVING LEARNING COMMUNITY, UNIVERSITY OF HAWAII AT HILO, HAWAII

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION OF EXISTING FACILITIES AND DEVELOPMENT OF AN ADDITION TO UNIVERSITY OF HAWAII AT HILO STUDENT HOUSING.PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          700           

            CONSTRUCTION                                  7,100           

            EQUIPMENT                                       200           

               TOTAL FUNDING              UOH             4,000 C           C

                                          UOH             4,000 N           N

 

UOH700 - UNIVERSITY OF HAWAII, WEST OAHU

 

95.         UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A PHOTOVOLTAIC PANEL ARRAY TO GENERATE POWER FOR THE NEW UH WEST OAHU CAMPUS IN KAPOLEI.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  2,497           

            EQUIPMENT                                         1           

               TOTAL FUNDING              UOH             2,500 C           C

 


 

UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

 

96. L28     LEE, EDUCATION AND INNOVATION FACILITY, OAHU

 

            DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW EDUCATION AND INNOVATION INSTRUCTIONAL FACILITY AT LEEWARD COMMUNITY COLLEGE.

            DESIGN                                          332           

            CONSTRUCTION                                 16,810           

            EQUIPMENT                                     1,871           

               TOTAL FUNDING              UOH            19,013 C           C

 

97.         MAU, RENOVATION OF THE ORIGINAL SCIENCE BUILDING, MAUI

 

            CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION OF THE EXISTING SCIENCE BUILDING TO HOUSE ALLIED HEALTH PROGRAMS AT UNIVERSITY OF HAWAII MAUI COLLEGE. PROJECT INCLUDES RENOVATION OF EXISTING FACILITY, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

            CONSTRUCTION                                              4,000

            EQUIPMENT                                                   501

               TOTAL FUNDING              UOH                   C      4,501 C

 

98.         HAW, HAWAII COMMUNITY COLLEGE, HAWAII

 

            PLANS TO UPDATE THE LONG RANGE DEVELOPMENT PLAN FOR THE HAWAII COMMUNITY COLLEGE CAMPUS.

            PLANS                                                       500

               TOTAL FUNDING              UOH                   C        500 C

 


 

99.         LEE, WAIANAE EDUCATION CENTER, OAHU

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE WAIANAE EDUCATION CENTER.

            PLANS                                             1           

            LAND                                            500           

            DESIGN                                          500           

            CONSTRUCTION                                  1,998           

            EQUIPMENT                                         1           

               TOTAL FUNDING              UOH             3,000 C           C

 

100.        SYS, MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUSES OF THE COMMUNITY COLLEGE SYSTEM, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUS FACILITIES WITHIN THE UNIVERSITY OF HAWAII, COMMUNITY COLLEGE SYSTEM.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  9,997           

            EQUIPMENT                                         1           

               TOTAL FUNDING              UOH            10,000 C           C

 


 

UOH900 - UNIVERSITY OF HAWAII, SYSTEM WIDE SUPPORT

 

101. 536    SYS, HEALTH, SAFETY, AND CODE REQUIREMENTS, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MODIFICATIONS TO EXISTING FACILITIES AND/OR CONSTRUCTION OF NEW FACILITIES FOR HEALTH, SAFETY, AND CODE REQUIREMENTS.

            PLANS                                           301           

            DESIGN                                        1,255           

            CONSTRUCTION                                 28,444       3,977

               TOTAL FUNDING              UOH            30,000 C      3,977 C

 

102. 541    SYS, CAPITAL RENEWAL AND DEFERRED MAINTENANCE, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS TO UNIVERSITY OF HAWAII FACILITIES.  PROJECTS TO INCLUDE CAPITAL RENEWAL, REDUCTION OF MAINTENANCE BACKLOG, MAJOR AND MINOR RENOVATIONS, MODERNIZATION OF FACILITIES, REROOFING, MECHANICAL AND ELECTRICAL SYSTEMS, RESURFACING, REPAINTING, AND OTHER REPAIRS AND PROJECT COSTS TO UPGRADE FACILITIES AT ALL UNIVERSITY CAMPUSES.

            PLANS                                             1           1

            DESIGN                                        3,000           1

            CONSTRUCTION                                 46,998       9,997

            EQUIPMENT                                         1           1

               TOTAL FUNDING              UOH            50,000 C     10,000 C

 


 

103. 548    SYS, UNIVERSITY OF HAWAII PROJECT ADJUSTMENT FUND, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A PROJECT ADJUSTMENT FUND FOR THE UNIVERSITY OF HAWAII.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                      1           

            EQUIPMENT                                         1           

               TOTAL FUNDING              UOH                 4 C           C

 


 

H.  CULTURE AND RECREATION

LNR804 - FOREST AND OUTDOOR RECREATION

 

1. D00K     LUMP SUM IMPROVEMENTS AT DOFAW FACILITIES FOR FORESTS AND/OR OUTDOOR RECREATION, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION AT DOFAW FACILITIES FOR FORESTS AND/OR OUTDOOR RECREATION.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  3,323           

               TOTAL FUNDING              LNR             3,325 C           C

 

LNR806 - PARKS ADMINISTRATION AND OPERATION

 

2.          STATE PARKS ENERGY AND WATER EFFICIENCY IMPROVEMENTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION OF ENERGY AND WATER EFFICIENCY AND RELATED IMPROVEMENTS.

            DESIGN                                          500           

            CONSTRUCTION                                    500       1,000

               TOTAL FUNDING              LNR             1,000 C      1,000 C

 


 

3.          LUMP SUM CIP, STATE PARKS IMPROVEMENTS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION OF REPAIR AND MAINTENANCE IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS AT STATE PARKS FACILITIES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            DESIGN                                        2,029         899

            CONSTRUCTION                                 16,245      17,820

               TOTAL FUNDING              LNR            18,075 C     18,520 C

                                          LNR               200 N        200 N

 

4.          CENTRAL MAUI REGIONAL PARK, MAUI

 

            PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR ESTABLISHMENT OF A REGIONAL PARK IN THE AREA OF CENTRAL MAUI; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            LAND                                              1           

            DESIGN                                            1           

            CONSTRUCTION                                  8,997           

               TOTAL FUNDING              LNR             9,000 C           C

 

5.          LUALUALEI FLATS/PUHAWAI STREAM, OAHU

 

            CONSTRUCTION FOR FLOOD MITIGATION.

            CONSTRUCTION                                  2,000           

               TOTAL FUNDING              LNR             2,000 C           C

 


 

6.          MANA DRAG RACING STRIP, KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND RESURFACE MANA DRAG RACING STRIP. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    498           

               TOTAL FUNDING              LNR               500 C           C

 

7.          FRIENDS OF IOLANI PALACE, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR CONTINUING RENOVATIONS, REPAIRS AND RESTORATION WITHIN THE PALACE COMPLEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                    498           

               TOTAL FUNDING              LNR               500 C           C

 

LNR801 - OCEAN-BASED RECREATION

 

8.          MALA BOAT RAMP AND LOADING DOCK, LAHAINA, MAUI

 

            CONSTRUCTION FOR NEW LOADING DOCKS, IMPROVEMENTS TO BOAT RAMP, PARKING LOT AND RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                    800           

               TOTAL FUNDING              LNR               200 C           C

                                          LNR               600 N           N

 


 

9.          KIKIAOLA SMALL BOAT HARBOR SAND BY-PASS PROGRAM, KEKAHA, KAUAI

 

            PLANS, DESIGN AND CONSTRUCTION FOR A SAND BY-PASS PROJECT TO MOVE SAND FROM THE EAST SIDE OF THE HARBOR TO THE WEST SIDE OF THE HARBOR.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                           200           

            DESIGN                                          200           

            CONSTRUCTION                                              1,000

               TOTAL FUNDING              LNR               400 N      1,000 N

 

10. B99     LUMP SUM IMPROVEMENTS AT BOATING AND OCEAN RECREATION FACILITIES, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AT VARIOUS BOATING FACILITIES TO INCLUDE PIERS, LOADING DOCKS, UTILITIES, BOAT RAMPS, RESTROOMS, PARKING AREAS, STRUCTURES, DREDGING, SEWER SYSTEMS, BUILDING, FENCING, RENDERING, MOORINGS, LANDSCAPING AND OTHER RELATED WORK.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  7,498       3,998

               TOTAL FUNDING              LNR             7,000 C      4,000 C

                                          LNR               500 N           N

 


 

11.         MAUNALUA BAY LAUNCH RAMP FACILITY, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE THE MAUNALUA BAY LAUNCH RAMP FACILITY.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,997           

            EQUIPMENT                                         1           

               TOTAL FUNDING              LNR             2,000 E           E

 

12.         HALEIWA SMALL BOAT HARBOR, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION OF NEW PIERS, CATWALKS, APPROACHES, AND FLOATING DOCK SYSTEM AT THE HALEIWA SMALL BOAT HARBOR.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  1,998           

               TOTAL FUNDING              LNR             2,000 C           C

 

13.         HANA BOAT RAMP AND WHARF IMPROVEMENTS, MAUI

 

            PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE BOAT RAMP, REVETMENT, APPROACH AREA, AND OTHER RELATED WORK.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  3,123           

               TOTAL FUNDING              LNR             3,125 C           C

 


 

14.         WAIANAE BOAT HARBOR IMPROVEMENTS, OAHU

 

            PLANS AND DESIGN FOR IMPROVEMENTS AT WAIANAE BOAT HARBOR. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

            PLANS                                             1           

            DESIGN                                          499           

               TOTAL FUNDING              LNR               500 C           C

 

15.         WAILOA SMALL BOAT HARBOR DREDGING, HAWAII

 

            CONSTRUCTION FOR REMOVAL OF SAND AT THE ENTRANCE TO THE WAILOA SMALL BOAT HARBOR.

            CONSTRUCTION                                  1,000           

               TOTAL FUNDING              LNR             1,000 C           C

 

AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

 

16. Q104    LUMP SUM HEALTH AND SAFETY, ALOHA STADIUM, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR THE MITIGATION/ELIMINATION OF CONDITIONS THAT MAY BECOME HAZARDOUS TO HEALTH AND SAFETY, INCLUDING REPAIRS, ALTERATIONS, AND IMPROVEMENTS TO THE ALOHA STADIUM TO MEET CODE, SAFETY, AND/OR OPERATIONAL REQUIREMENTS.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  5,148       5,148

               TOTAL FUNDING              AGS             5,150 C      5,150 C

 


 

I.  PUBLIC SAFETY

PSD900 - GENERAL ADMINISTRATION

 

1. P-20110  LUMP SUM CIP, RENOVATION, REPLACEMENT AND IMPROVEMENT PROJECTS, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR VARIOUS RENOVATIONS, REPLACEMENTS AND OTHER IMPROVEMENTS TO ANY PSD PROGRAM, STATEWIDE.  SAID ACTIONS MAY INCLUDE, BUT NOT BE LIMITED TO, BUILDINGS AND BUILDINGS OPERATING SYSTEMS; SITE UTILITIES AND/OR OTHER IMPROVEMENTS.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  7,998       7,998

               TOTAL FUNDING              PSD             8,000 C      8,000 C

 

2. P20112   PLANNING FOR THE ORDERLY DEVELOPMENT OF NEW CORRECTIONAL FACILITIES, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR THE ORDERLY DEVELOPMENT OF NEW AND/OR REPLACEMENT CORRECTIONAL FACILITIES BY THE DEPARTMENT OF PUBLIC SAFETY, STATEWIDE.

            PLANS                                             1           

            LAND                                              1           

            DESIGN                                            1           

            CONSTRUCTION                                    997           

               TOTAL FUNDING              PSD             1,000 C           C

 


 

DEF110 - AMELIORATION OF PHYSICAL DISASTERS

 

3. A0201    RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT TO RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES AND INCREASE THE NUMBER OF PUBLIC SHELTERS STATEWIDE.

            PLANS                                             2           1

            LAND                                              2           1

            DESIGN                                           46          98

            CONSTRUCTION                                  1,200       1,050

            EQUIPMENT                                       750         500

               TOTAL FUNDING              DEF             2,000 C      1,650 C

 

4. A40      DISASTER WARNING AND COMMUNICATIONS DEVICES, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE INCREMENTAL ADDITION, REPLACEMENT AND UPGRADE OF STATE CIVIL DEFENSE WARNING AND COMMUNICATIONS EQUIPMENT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            LAND                                              1           1

            DESIGN                                          158         158

            CONSTRUCTION                                  1,200       1,200

            EQUIPMENT                                       240         240

               TOTAL FUNDING              DEF             1,500 C      1,500 C

                                          DEF               100 N        100 N

 


 

5. A45      AMERICANS WITH DISABILITIES ACT (ADA) AND INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

 

            CONSTRUCTION FOR MODIFICATIONS FOR PERSONS WITH DISABILITIES AND TO IDENTIFY AND CORRECT EXISTING DEFICIENCIES FOR THE DEPARTMENT OF DEFENSE (DOD) FACILITIES.  THIS PROJECT IS NECESSARY TO MEET REQUIREMENTS IN ACCORDANCE WITH STATE AND FEDERAL LAWS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            CONSTRUCTION                                  1,753           

               TOTAL FUNDING              AGS               707 C           C

                                          AGS             1,046 N           N

 


 

6. A46      HEALTH AND SAFETY REQUIREMENTS FOR BIRKHIMER TUNNEL AND SUPPORT FACILITIES, OAHU

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR HEALTH AND SAFETY IMPROVEMENTS TO THE STATE EMERGENCY OPERATING CENTER, BIRKHIMER TUNNEL & SUPPORT FACILITIES TO INCLUDE ADA COMPLIANCE, SPRINKLER SYSTEM, AND ADDITIONAL INSTALLATION OF CONDUITS, REMOVAL OF OVERHEAD UTILITY LINES, & OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           1

            LAND                                              1           1

            DESIGN                                           23          23

            CONSTRUCTION                                    395         400

            EQUIPMENT                                       123         175

               TOTAL FUNDING              DEF               543 C        600 C

 


 

7. AD2071   ENERGY SAVINGS IMPROVEMENTS AND RENEWABLE ENERGY PROJECTS, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR REPLACEMENT OF ENERGY EFFICIENT STATE OF THE ART BLDG AC SYSTEMS TO REPLACE FAILING AND INEFFICIENT EQUIPMENT.  IMPLEMENT EXT CONTROLS TO PROVIDE SET BACKS AND REDUCE ENERGY CONSUMPTION STATEWIDE.  DESIGN AND CONSTRUCT RENEWABLE ENERGY TECHNOLOGIES TO REDUCE USE OF FOSSIL FUELS AND PROVIDE CLEAN AND RELIABLE ENERGY FOR HIGH CONSUMPTION ON FACILITIES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                          100         200

            CONSTRUCTION                                  3,395       6,300

               TOTAL FUNDING              DEF               250 C      1,250 C

                                          DEF             3,245 N      5,250 N

 


 

8. A44      RENOVATION OF BLDG 117, KALAELOA, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR AN ARMY NATIONAL GUARD CONSOLIDATED FACILITY OF PERMANENT STEEL AND MASONRY TYPE CONSTRUCTION, UTILITIES, ACCESS ROAD, PARKING AREAS, SECURITY FENCING, INTERIM RENOVATIONS AND OTHER RELATED WORK.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                        1,581           

            CONSTRUCTION                                 39,500           

            EQUIPMENT                                        50         745

               TOTAL FUNDING              DEF             1,650 C         50 C

                                          DEF            39,481 N        695 N

 

9. AB2073   29TH INFANTRY BRIGADE COMBAT TEAM READINESS CENTER, KALAELOA, OAHU

 

            PLANS, DESIGN AND CONSTRUCTION FOR THE NEW 29TH BRIGADE COMBAT TEAM READINESS CENTER WILL BE BUILT TO NATIONAL GUARD BUREAU STANDARDS AND WILL MEET LEED SILVER USAGE LEVEL REQUIREMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                             1           

            DESIGN                                          449         450

            CONSTRUCTION                                             33,000

               TOTAL FUNDING              DEF               450 C        450 C

                                          DEF                   N     33,000 N

 


 

10. A42     MINOR MILITARY CONSTRUCTION AND RENOVATIONS AT ARMY GUARD FACILITIES, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPLACEMENT OF EXISTING HAWAII ARMY NATIONAL GUARD KALAELOA AND RTI CAMPUS UTILITIES INFRASTRUCTURE, LARGER REPAIR PROJECTS, AND FEDERAL ENERGY PROJECTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            PLANS                                           300           

            DESIGN                                        1,500           

            CONSTRUCTION                                  1,000         500

            EQUIPMENT                                                16,500

               TOTAL FUNDING              DEF             1,800 C        500 C

                                          DEF             1,000 N     16,500 N

 

11.         UPGRADE AND IMPROVEMENTS TO NATIONAL GUARD FACILITIES, STATEWIDE

 

            DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AND UPGRADES TO NATIONAL GUARD ARMORIES TO CONFORM TO CURRENT NATIONAL GUARD BUREAU STANDARDS AND CRITERIA, AND TO MEET UNANTICIPATED HEALTH, SAFETY, AND BUILDING CODE REQUIREMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

            DESIGN                                                      700

            CONSTRUCTION                                  4,600         840

               TOTAL FUNDING              DEF             1,400 C        700 C

                                          DEF             3,200 N        840 N

 


 

K.  GOVERNMENT-WIDE SUPPORT

GOV100 - OFFICE OF THE GOVERNOR

 

1. G01      PROJECT ADJUSTMENT FUND, STATEWIDE

 

            PLANS FOR THE ESTABLISHMENT OF A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT.

            PLANS                                             1           1

               TOTAL FUNDING              GOV                 1 C          1 C

 

BUF101 - DEPARTMENTAL ADMINISTRATION AND BUDGET DIVISION

 

2. 00-01    HAWAIIAN HOME LANDS TRUST FUND, STATEWIDE

 

            CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE HAWAIIAN HOME LANDS TRUST FUND TO SATISFY THE PROVISIONS OF ACT 14, SPSLH 1995.

            CONSTRUCTION                                 30,000      30,000

               TOTAL FUNDING              BUF            30,000 C     30,000 C

 

3. 00-02    STATE EDUCATIONAL FACILITIES IMPROVEMENT FUND, STATEWIDE

 

            CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND.

            CONSTRUCTION                                539,836     170,960

               TOTAL FUNDING              BUF           539,836 C    170,960 C

 


 

TAX107 - SUPPORTING SERVICES - REVENUE COLLECTION

 

4. 1        KEELIKOLANI BLDG, AIR CONDITIONING UPGRADE FOR THE TAX DEPARTMENT'S COMPUTER ROOM, OAHU

 

            DESIGN AND CONSTRUCTION TO UPGRADE THE 24/7 AC THAT COOLS MULTIPLE DOTAX COMPUTER EQUIPMENT INCLUDING THE MULTI-MILLION DOLLAR ITIMS IMAGING SYSTEMS (IIS).

            DESIGN                                           33           

            CONSTRUCTION                                    300           

               TOTAL FUNDING              TAX               333 C           C

 

AGS131 - INFORMATION PROCESSING AND COMMUNICATION SERVICES

 

5. Q102     LUMP SUM HEALTH AND SAFETY, INFORMATION AND COMMUNICATION SERVICE DIVISION, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPAIRS, UPGRADES AND EXPANSION OF CRITICAL COMMUNICATIONS BACKBONE SYSTEMS, INCLUDING THE STATEWIDE ANUENUE AND HAWAIIAN MICROWAVE SYSTEMS AND THE WINDWARD, NORTH SHORE AND CENTRAL OAHU RADIO SITES.  EFFORTS INCLUDE WORK THAT ALSO SUPPORTS FUTURE BROADBAND AIR INTERFACE DEVELOPMENT AND IMPLEMENTATION.

            PLANS                                           150         150

            LAND                                             50          50

            DESIGN                                          300         300

            CONSTRUCTION                                  7,035       6,935

            EQUIPMENT                                       600         600

               TOTAL FUNDING              AGS             8,135 C      8,035 C

 


 

6. S101     ICSD KALANIMOKU BUILDING DATA CENTER OPTIMIZATION AND ENERGY EFFICIENCY, OAHU

 

            PLANS AND DESIGN FOR REPAIRS, UPGRADES AND EXPANSION OF CRITICAL DATA CENTER SYSTEMS AND SUPPORT INFRASTRUCTURE WITHIN THE KALANIMOKU BUILDING, OAHU.  WORK WILL OPTIMIZE NECESSARY STATEWIDE FUNCTIONALITY AND INCREASE ENERGY EFFICIENCY WITHIN THE FACILITY.

            PLANS                                            50           

            DESIGN                                           50         100

               TOTAL FUNDING              AGS               100 C        100 C

 

LNR101 - PUBLIC LANDS MANAGEMENT

 

7. J42A     DAM ASSESSMENTS, MAINTENANCE AND REMEDIATION, STATEWIDE

 

            PLANS, DESIGN AND CONSTRUCTION FOR ASSESSMENTS, MAINTENANCE AND REMEDIATION OF DAMS UNDER THE JURISDICTION OF THE DEPARTMENT OF LAND AND NATURAL RESOURCES.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  2,498           

               TOTAL FUNDING              LNR             2,500 S           S

 


 

AGS221 - PUBLIC WORKS - PLANNING, DESIGN, AND CONSTRUCTION

 

8. E109     CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR COSTS RELATING TO WAGES AND FRINGES FOR PERMANENT, PROJECT-FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF ACCOUNTING AND GENERAL SERVICES.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

            PLANS                                         7,361       7,361

            LAND                                              1           1

            DESIGN                                            1           1

            CONSTRUCTION                                      1           1

            EQUIPMENT                                         1           1

               TOTAL FUNDING              AGS             7,365 C      7,365 C

 

9. Q101     LUMP SUM MAINTENANCE OF EXISTING FACILITIES, PUBLIC WORKS DIVISION, STATEWIDE

 

            PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS AND MAINTENANCE OF PUBLIC FACILITIES AND SITES, STATEWIDE.  PROJECTS MAY INCLUDE ROOFING, OTHER REPAIRS, AND IMPROVEMENTS.

            PLANS                                            50          50

            LAND                                              1           1

            DESIGN                                          200         200

            CONSTRUCTION                                 16,240      13,740

            EQUIPMENT                                         9           9

               TOTAL FUNDING              AGS            16,500 C     14,000 C

 


 

10. P60131  ENERGY CONSERVATION AND SUSTAINABLE DESIGN IMPROVEMENTS, STATEWIDE

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR DEVELOPMENT AND IMPLEMENTATION OF A COMPREHENSIVE ENERGY CONSERVATION PLAN TO MAXIMIZE ENERGY EFFICIENCY IN PUBLIC FACILITIES AND OPERATIONS.  EFFORTS WILL INCLUDE CONSIDERATION FOR SUSTAINABLE DESIGN TO THE FULLEST EXTENT POSSIBLE.

            PLANS                                             1           1

            DESIGN                                            1           1

            CONSTRUCTION                                  3,436       1,997

            EQUIPMENT                                         1           1

               TOTAL FUNDING              AGS             3,439 C      2,000 C

 

11. L102    KAMAMALU BUILDING, ASBESTOS REMOVAL AND BUILDING RENOVATION, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ASBESTOS MITIGATION AND RENOVATION OF THE APPROXIMATELY 75,000 GROSS SQUARE FOOT KAMAMALU BUILDING.

            PLANS                                           150           

            DESIGN                                        2,000           

            CONSTRUCTION                                 10,849           

            EQUIPMENT                                         1           

               TOTAL FUNDING              AGS            13,000 C           C

 


 

12. P104    WASHINGTON PLACE, HEALTH AND SAFETY AND QUEEN'S GALLERY RENOVATION, OAHU

 

            PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO ADDRESS IMMEDIATE HEALTH AND SAFETY NEEDS AT WASHINGTON PLACE, PROJECT INCLUDES LEAD BASED PAINT ABATEMENT/ENCAPSULATION, BLDG CODE REQUIREMENTS (STRUCTURAL, ELECTRICAL, PLUMBING, AND VENTILATION) AND ADAAG REQUIREMENTS.  ASSOCIATED TO THIS WORK IS RENOVATION FOR BUILDING PRESERVATION WITH THE RETENTION OF EXISTING HISTORIC MATERIAL.

            PLANS                                             1           

            DESIGN                                            1           

            CONSTRUCTION                                  4,758           

            EQUIPMENT                                         1           

               TOTAL FUNDING              AGS             1,500 C           C

                                          AGS             3,261 R           R

 

13.         BISHOP MUSEUM, RENOVATION OF PLANETARIUM, OAHU

 

            DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT TO BISHOP MUSEUM PLANETARIUM. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                  1,498           

            EQUIPMENT                                         1           

               TOTAL FUNDING              AGS             1,500 C           C

 


 

14.         BISHOP MUSEUM, RENOVATION OF POLYNESIAN HALL, OAHU

 

            CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT OF THE POLYNESIAN HALL. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            CONSTRUCTION                                    999           

            EQUIPMENT                                         1           

               TOTAL FUNDING              AGS             1,000 C           C

 

15.         LAHAINALUNA HIGH SCHOOL FOUNDATION, MAUI

 

            DESIGN AND CONSTRUCTION FOR STADIUM PROJECT, PHASE 2. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            DESIGN                                            1           

            CONSTRUCTION                                  1,699           

               TOTAL FUNDING              AGS             1,700 C           C

 


 

SUB201 - CITY AND COUNTY OF HONOLULU

 

16.         MAINTENANCE AND REPAIR OF PUBLIC ROADS, OAHU

 

            DESIGN AND CONSTRUCTION FOR MAINTENANCE, IMPROVEMENT, AND REPAIR OF PUBLIC ROADS IN THE TWENTIETH REPRESENTATIVE DISTRICT; PROVIDED THAT THE SUMS NOT LAPSE AT THE END OF THE FISCAL BIENNIUM FOR WHICH THE APPROPRIATION IS MADE; PROVIDED THAT ALL MONEYS FROM THE APPROPRIATION THAT ARE ENCUMBERED AS OF JUNE 30, 2014 SHALL LAPSE AS OF THAT DATE.

            DESIGN                                            1           1

            CONSTRUCTION                                  1,999       1,999

               TOTAL FUNDING              CCH             2,000 C      2,000 C

 

SUB401 - COUNTY OF MAUI

 

17.         OLD HALEAKALA HIGHWAY SIDEWALK, MAUI

 

            PLANS, DESIGN AND CONSTRUCTION OF SIDEWALK ALONG ONE SIDE OF OLD HALEAKALA HIGHWAY FROM KULA HIGHWAY TO PUKALANI STREET; PROVIDED THAT PARTIAL MATCHING FUNDS BE PROVIDED BY THE COUNTY OF MAUI.

            PLANS                                                         1

            DESIGN                                                        1

            CONSTRUCTION                                                998

               TOTAL FUNDING              COM                   C      1,000 C

 


 

SUB501 - COUNTY OF KAUAI

 

18.         FILIPINO COMMUNITY CENTER, KAUAI

 

            PLANS TO CONSTRUCT THE FILIPINO COMMUNITY CENTER ON KAUAI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

            PLANS                                                        30

               TOTAL FUNDING              COK                   C         30 C


PART V. CAPITAL IMPROVEMENT PROGRAM PROVISOS

     SECTION 37.  Provided that of the general obligation bond fund appropriation for Hawaii community development authority (BED 150), the sum of $1,855,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for Hawaii community development authority's community development districts and capital improvement program staff costs, statewide; provided further that the Hawaii community development authority shall prepare a project funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvements program related positions; and provided further that the Hawaii community development authority shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 38.  Provided that of the general obligation fund appropriation for plans, land acquisition, design, and construction for miscellaneous upgrade and improvements to veterans cemeteries statewide, services to veterans (DEF112), the sum of $5,300,000 or so much thereof as may be necessary for fiscal year 2011-2012 shall be used for land acquisition for expansion of burial space for the veterans cemetery in Makawao, Maui.

     SECTION 39.  Provided that of the general obligation fund appropriation for plans, design, and construction for rockfall and flood mitigation at various locations, statewide, water and land development (LNR141), the sum of $240,000 or so much thereof as may be necessary for fiscal year 2011-2012 shall be used for plans and construction to remove boulders in Niu Valley.

     SECTION 40.  Provided that of the general obligation fund appropriation for design and construction for repair, maintenance, and related improvements at state parks facilities, statewide, parks administration and operation (LNR806), the sum of $2,500,000 or so much thereof as may be necessary for fiscal year 2011-2012 shall be used for construction of a test well to serve as the first phase in the construction of a ground water well to supplement the surface water system on the island of Maui (upcountry).

SECTION ­41.  Provided that of the special funds appropriation for school support (EDN 400), the sum of $5,200,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for department of education capital improvement program project positions, statewide; provided further that the department of education shall prepare a project-funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvement program related positions; and provided further that the department of education shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

SECTION 42.  Provided that of the general obligation bond fund appropriation for land and natural resources – natural physical environment (LNR 906), the sum of $2,540,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for department of land and natural resources capital improvement program staff costs, statewide; provided further that the department of land and natural resources shall prepare a project-funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvement program related positions; and provided further that the department of land and natural resources shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 43.  Provided that of the special funds and other funds appropriations for airports administration (TRN 195), the sums of $2,450,000 and $100,000, respectively, or so much thereof as may be necessary for fiscal year 2011-2012 and the same sums or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for airports division capital improvement program project staff costs, statewide; provided further that the airports division shall prepare a project-funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvement program related positions; and provided further that the airports division shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 44.  Provided that of the revenue bond appropriation for harbors administration (TRN 395), the sum of $1,735,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for harbors modernization plan harbors division capital improvement program staff costs, statewide; provided further that the harbors division shall prepare a project-funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvement program related positions; and provided further that the harbors division shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 45. Provided that of the $2,815,000 revenue bond funds and $1,000,000 of other federal funds appropriated for Maui highways, (TRN 531) to be used for traffic operations improvements to existing intersections and highway facilities on Maui, the sum of $1,500,000 or so much thereof as may be necessary shall be used for the left-turn lane and traffic signals at the intersection of Piilani highway and Mano o'kala street.

SECTION 46.  Provided that of the special funds and other federal funds appropriations for highways administration (TRN 595), the sums of $12,000,000 and $6,000,000, respectively, or so much thereof as may be necessary for fiscal year 2011-2012 and the same sums or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for highways division capital improvements program project staff costs, statewide; provided further that the highways division shall prepare a project funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvement program related positions; and provided further that the highways division shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

SECTION 47.  Provided that the department of education shall submit a quarterly report on progress made over the preceding three months towards implementation of all of the department's capital improvement program appropriations; provided further that for each active project the report shall provide for each cost element the total appropriation amount, lapse amount to date, expenditures to date, unallotted amount, allotment balance, encumbrance claim amount, encumbrance contract amount, and percent of work completed; provided further that the department shall report on all work undertaken using the appropriation for the first report and then work completed over the preceding three months for subsequent reports; and provided further that the first report shall be due to the legislature no later than October 15 for the first quarter of fiscal year 2011-2012 and subsequent reports shall be due fifteen days after the quarter ends.

     SECTION 48.  Provided that of the general obligation fund appropriation for Hawaii health systems corporation (HTH 212), the sum of $15,000,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by the Hawaii health systems corporation to correct health and safety deficiencies; provided further that of the total sum:

(1)  $1,050,000 shall be used to upgrade the emergency power generators at Kona community hospital;

(2)  $3,000,000 shall be used for facility expansion for imaging, laboratory, pharmacy, and other departments at Maui memorial medical center;

(3)  $1,345,000 shall be used to upgrade the dietary plumbing and flooring at Maluhia health center;

(4)  $1,680,000 shall be used for fire sprinklers, smoke detectors, and signage at Maui memorial medical center;

(5)  $820,000 shall be used to upgrade the dietary electrical system and emergency generator at Leahi hospital;

(6)  $1,600,000 shall be used for air conditioning upgrades at Maui memorial medical center;

(7)  $2,000,000 shall be used for plumbing improvements at Maui memorial medical center;

(8)  $1,000,000 shall be used for dietary equipment upgrades at Maui memorial medical center;

(9)  $1,000,000 shall be used for elevator upgrades at Kula hospital; and

(10) $1,505,000 shall be used for a new nurse call system at Kula hospital.

     Section 49. Provided that of the general obligation bond fund appropriation for school based budgeting (EDN 100), lump sum capital improvement project school building improvements statewide, the sum of $10,288,000 or so much thereof as may be necessary for fiscal year 2011-2012 shall be expended by the department of education to correct health and safety deficiencies; provided further that of the total sum:

(1) $250,000 shall be used for air conditioning of the administration building at Sunset Beach elementary school, Oahu; and

(2) $50,000 shall be used to upgrade the stage area and equipment for Mililani Uka elementary school, Oahu.

     SECTION 50.  Provided that of the general obligation fund appropriation for plans, design, construction and equipment for improvements to the University of Hawaii facilities, the sum of $5,760,000 or so much thereof as may be necessary for fiscal year 2011-2012 shall be expended by the University of Hawaii as follows:

(1)  $960,000 shall be used for design and construction of improvements to the entrance of the basketball offices;

(2)  $300,000 shall be used for design and construction of two additional sand volleyball courts;

(3)  $1,200,000 shall be used for design and construction of sun and rain covering for the tennis courts;

(4)  $900,000 shall be used for design and construction of sun and rain covering for the diving portion of the swimming complex;

(5)  $2,400,000 shall be used for design for renovation of the softball stadium, phase 2; and

(6)  $600,000 shall be used for plans and design for renovations to the nursing and culinary wing at the north Hawaii education and research center, Hawaii; provided that no funds from this program ID shall be expended for this project unless all funding necessary for the completion of the project, including funding for construction and equipment, in their entirety, have been secured.

 

     SECTION 51. Provided that of the general obligation bond fund and other federal funds appropriations for the department of defense, disaster warning and communication devices statewide, amelioration of physical disasters(DEF 110), the sums of $1,500,000 and $100,000 respectively, or so much thereof as may be necessary for fiscal year 2011-2012 shall be expended by the department of defense to correct health and safety deficiencies; provided further that of the total sum, $85,000 shall be used to install a new outdoor warning siren on Haneoo Road in Hana, Maui located at parcel TMK 1-4-7-9.

     Section 52.  Provided that of the general obligation bond fund appropriation for public works – planning, design, and construction (AGS 221), the sum of 7,365,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for department of accounting and general services capital improvement program staff costs, statewide; provided further that the department of accounting and general services shall prepare a project-funded staff services budget report detailing each permanent position by number, position title, and compensation (including fringe benefits), in accordance with section 92F-12(a)(14), Hawaii Revised Statutes; provided further that the report shall include the details for non-permanent capital improvements program related positions; and provided further that the department of accounting and general services shall submit the budget report to the legislature no later than twenty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 53.  Provided that of the general obligation fund appropriation for design and construction for maintenance, improvement, and repair of public roads in the twentieth representative district, city and county of Honolulu (SUB201), the sums appropriated shall be used to address potholes, fissures, and other deficiencies resulting from weather, overuse, and lack of sufficient maintenance resources over time.

     SECTION 54.  Any law to the contrary notwithstanding, the appropriations under Act 289, Session Laws of Hawaii 1993, section 127, as amended and renumbered by Act 252, Session Laws of Hawaii 1994, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.          Amount (MOF)

       C-01            $   46,824 E

       C-02             3,986,198 B

       C-02                 2,926 E

       C-03                17,175 B

       C-03                14,898 E

       C-04               139,487 E

       C-06               455,551 E

       C-10                39,606 B

       C-10                21,314 E

       C-11               260,079 B

       C-11             2,012,635 E

       C-12               325,452 B

       C-13                91,464 B

       C-14             1,627,377 B

       C-14               131,435 E

       C-15             2,644,754 B

       C-16             2,217,398 B

       C-18             2,208,106 B

       C-19                 1,063 B

       C-19                10,887 E

       C-21             1,577,737 B

       C-21               236,062 E

     SECTION 55.  Any law to the contrary notwithstanding, the appropriations under Act 218, Session Laws of Hawaii 1995, section 99, as amended and renumbered by Act 287, Session Laws of Hawaii 1996, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-01           $ 2,356,749 B

       C-01               205,883 E

       C-02               654,500 B

       C-02             1,000,000 E

       C-04D              281,250 B

       C-06            16,385,029 B

       C-06B               72,665 B

       C-08               135,541 B

       C-10               172,730 B

       C-10                60,216 E"

     SECTION 56.  Any law to the contrary notwithstanding, the appropriations under Act 328, Session Laws of Hawaii 1997, section 140A, as amended and renumbered by Act 116, Session Laws of Hawaii 1998, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-03            $  134,298 B

       C-10A              794,861 B

       C-37A              295,898 B

       C-42             2,163,815 B

       C-48             7,336,453 B

       C-67                79,000 B

       C-73                29,037 B

       C-75                 2,895 B

       C-76                 3,649 B"

     SECTION 57.  Any law to the contrary notwithstanding, the appropriations under Act 91, Session Laws of Hawaii 1999, section 64, as amended and renumbered by Act 281, Session Laws of Hawaii 2000, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-12              $ 61,989 B

       C-13               116,325 B"

     SECTION 58.  Any law to the contrary notwithstanding, the appropriations under Act 259, Session Laws of Hawaii 2001, section 91, as amended and renumbered by Act 177, Session Laws of Hawaii 2002, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-04            $  927,443 B

       C-05             2,460,595 B

       C-07B                2,500 B

       C-08                88,132 B

       C-11C               64,878 B

       C-11F              642,418 B

       C-14               487,632 B"

     SECTION 59.  Any law to the contrary notwithstanding, the appropriations under Act 200, Session Laws of Hawaii 2003, section 77, as amended and renumbered by Act 41, Session Laws of Hawaii 2004, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-01             $252,700 B

       C-03               443,162 B

       C-06                     1 E

       C-07.01             30,764 B

       C-09.01            182,080 E

       C-09.02            306,924 B

       C-13             1,000,000 B

  K-11.01           319,640 C"

 

     SECTION 60.  Any law to the contrary notwithstanding, the appropriations under Act 178, Session Laws of Hawaii 2005, section 85, as amended and renumbered by Act 160, Session Laws of Hawaii 2006, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-03              $156,895 B

       C-11               180,200 B

       C-12               260,078 B

       C-15                 5,191 B

       C-15               121,539 X

       C-16                 5,000 B

       C-20               570,046 X

       C-23               304,388 B

       C-26               329,822 B

       C-29                 4,120 B"

     SECTION 61.  Any law to the contrary notwithstanding, the appropriations under Act 213, Session Laws of Hawaii 2007, section 125, as amended and renumbered by Act 158, Session Laws of Hawaii 2008, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-24              $148,948 R"

     SECTION 62.  Any law to the contrary notwithstanding, the appropriations under Act 162, Session Laws of Hawaii 2009, section 62, as amended and renumbered by Act 180, Session Laws of Hawaii 2010, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     "Item No.          Amount (MOF)

       C-23           $33,585,000 E

       G-102           23,825,000 C

       G-105           3,000,000 C"

 

     SECTION 63.  Act 178, Session Laws of Hawaii 2005, as amended by Act 160, Session Laws of Hawaii 2006, is amended by adding a new section to read as follows:

     SECTION 64.  Act 178, Session Laws of Hawaii 2005, Section 85, as amended by Act 160, Session Laws of Hawaii 2006, Section 5, is amended by amending Item E-13.02 to read as follows:

 

"13.02    KOOLAULOA COMMUNITY HEALTH AND WELLNESS CENTER, OAHU

PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR FACILITIES FOR THE KOOLAULOA COMMUNITY HEALTH AND WELLNESS CENTER.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

PLANS                                 25

DESIGN                                25

LAND ACQUISITION AND CONSTRUCTION    550

TOTAL FUNDING   HMS         C   600C"

"SECTION 91.0.1.  Provided that of the general obligation bond fund appropriation for facilities for the Koolauloa community health and wellness center (HTH907), the sum of $550,000 for fiscal year 2006-2007 authorized for land acquisition and construction may be used for the acquisition of land and any improvements made thereto."

     Section 65.   Any law to the contrary notwithstanding, the appropriations under Act 162, Session Laws of Hawaii 2009, as amended by Act 180, Session Laws of Hawaii 2010, is amended:

     (1)  By amending Item E-6 to read as follows:

"6. P90032 MAUI MEMORIAL MEDICAL CENTER, NEW DIALYSIS UNIT, MAUI

PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW DIALYSIS UNIT[.} AND RELATED RENOVATIONS TO ACCOMMODATE THE CONSTRUCTION OF THE NEW DIALYSIS UNIT.

          PLANS         1

          DESIGN        1

          CONSTRUCTION  6,630

          EQUIPMENT     568      

              TOTAL FUNDING HTH  7,200 C       C"

    

     (2)  By amending Item G—49 to read as follows:

“P90083   KEAUKAHA ELEMENTARY SCHOOL, HAWAII

PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW CAFETERIA[.], INCLUDING A FULL-SERVICE, CONVENTIONAL KITCHEN TO BOTH PREPARE AND SERVE FOOD; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

PLANS         80

DESIGN        520

CONSTRUCTION 7,200

EQUIPMENT          200

TOTAL FUNDING EDN 8,000B    B”

(3)  By amending Item A-8 to read

"P90002   MULTIPURPOSE RESEARCH AND DEVELOPMENT FACILITY FOR THE PRODUCTION OF VALUE ADDED AGRICULTURAL PRODUCTS, MAUI

     PLANS, DESIGN, AND CONSTRUCTION TO REPAIR AND MODIFY FACILITIES AT MAUI COMMUNITY COLLEGE TO FURTHER THE VALUE ADDED AGRICULTURAL INDUSTRY[, PROVIDED THAT NO FUNDS SHALL BE MADE AVAILABLE UNLESS MATCHED DOLLAR-FOR-DOLLAR IN CASH OR BY IN-KIND DONATIONS BY THE PRIVATE SECTOR.]  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

PLANS                            1       1

DESIGN                           1       1

CONSTRUCTION                   187   1,650

   TOTAL FUNDING      AGR     125C  1,100C

                      AGR       1N      1N

                      AGR      62R    550R

                      AGR       1S     1S"

     "SECTION 62.1.  Provided that of the appropriation for the department of agriculture (AGR141) to plan, design, and construct a multipurpose research and development facility for the production of value added agricultural products, Maui, the department shall oversee the development of an agriculture value-added facility in cooperation with and support of the university of Hawaii, Maui college; provided further that the appropriation shall be used to renovate a room in the old student center building to create value-added agriculture and other products in cooperation with the Maui farm bureau and other interested parties; and provided further that the department shall use this appropriation to leverage other project-related funds from other sources."


 

PART VI.  ISSUANCE OF BONDS

     SECTION 66.  AIRPORT REVENUE BONDS.  The department of transportation is authorized to issue airport revenue bonds for airport capital improvement program projects authorized in part II and listed in part IV of this Act and designated to be financed by revenue bond funds or by general obligation bond funds with debt service cost to be paid from special funds, in such principal amount as shall be required to yield the amounts appropriated for such capital improvements program projects, and, if so determined by the department and approved by the governor, any additional principal amount as may be necessary by the department to pay interest on the airport revenue bonds during the estimated period of construction of the capital improvements program project for which the airport revenue bonds are issued, to establish, maintain, or increase reserves for the airport revenue bonds and to pay the expenses of issuance of the bonds.  The airport revenue bonds shall be issued pursuant to the provisions of part III of chapter 39, Hawaii Revised Statutes, as the same may be amended from time to time.  The principal of and interest on airport revenue bonds, to the extent not paid from the proceeds of such bonds, shall be payable solely from and secured solely by the revenues from airports and related facilities under the ownership of the State or operated and managed by the department and the aviation fuel taxes levied and paid pursuant to sections 2434(a)(2) and 2488, Hawaii Revised Statutes, or such parts of either thereof as the department may determine, including rents, landing fees, and other fees or charges presently or hereafter derived from or arising through the ownership, operation, and management of airports and related facilities and the furnishing and supplying of the services thereof, and passenger facility charges pursuant to section 2615.5, Hawaii Revised Statutes, as amended, and as determined by the department.  The expenses of the issuance of such airport revenue bonds, to the extent not paid from the proceeds of such bonds, shall be paid from the airport revenue fund and passenger facility charge special fund as determined by the department.

     The governor, in the governor's discretion, is authorized to use the airport revenue fund and passenger facility charge special fund to finance those projects authorized in part II and listed in part IV of this Act where the method of financing is designated to be by airport revenue bond funds; provided that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 67.  HARBOR REVENUE BONDS.  The department of transportation is authorized to issue harbor revenue bonds for harbor capital improvement program projects authorized in part II and listed in part IV of this Act and designated to be financed by revenue bond funds or by general obligation bond funds with debt service cost to be paid from special funds, in such principal amount as shall be required to yield the amounts appropriated for such capital improvement program projects, and, if so determined by the department and approved by the governor, such additional amounts as may be deemed necessary by the department to pay interest on such revenue bonds during the estimated construction period of the capital improvement project for which such harbor revenue bonds are issued, to establish, maintain, or increase reserves for the harbor revenue bonds or harbor revenue bonds heretofore authorized (whether authorized and issued or authorized and still unissued), and to pay the expenses of issuance of such bonds.  The aforementioned harbor revenue bonds shall be issued pursuant to the provisions of part III of chapter 39, Hawaii Revised Statutes, as the same may be amended from time to time.  The principal of and interest on harbor revenue bonds, to the extent not paid from the proceeds of such bonds, shall be payable solely from and secured solely by the revenues derived from harbors and related facilities under the ownership of the State or operated and managed by the department, including rents, mooring, wharfage, dockage, pilotage fees, and other fees or charges presently or hereafter derived from or arising through the ownership, operation, and management of harbor and related facilities and the furnishing and supplying of the services thereof.  The expenses of the issuance of such harbor revenue bonds, to the extent not paid from the proceeds of such bonds, shall be paid from the harbor special fund.

     The governor, in the governor's discretion, is authorized to use the harbor revenue fund to finance those projects authorized in part II and listed in part IV of this Act where the method of financing is designated to be by harbor revenue bond funds; provided that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 68.  HIGHWAY REVENUE BONDS.  The department of transportation is authorized to issue highway revenue bonds for highway capital improvement program projects authorized in part II and listed in part IV of this Act and designated to be financed by revenue bond funds or by general obligation bond funds with the debt service cost to be paid from special funds, in such principal amount as shall be required to yield the amounts appropriated for such capital improvement projects, and, if so determined by the department and approved by the governor, such additional principal amount as may be deemed necessary by the department to pay interest on such highway revenue bonds during the estimated period of construction of the capital improvement project for which such highway revenue bonds are issued, to establish, maintain, or increase reserves for such highway revenue bonds or highway revenue bonds heretofore authorized (whether authorized and issued or authorized and still unissued), and to pay all or any part of the expenses related to the issuance of such highway revenue bonds.  The aforementioned highway revenue bonds shall be issued pursuant to the provisions of part III of chapter 39, Hawaii Revised Statutes, as the same may be amended from time to time.  The principal of and interest on such highway revenue bonds, to the extent not paid from the proceeds of such highway revenue bonds, shall be payable from and secured by the revenues derived from highways and related facilities under the ownership of the State or operated and managed by the department, from the highway fuel taxes, vehicle weight taxes, and vehicle registration fees, levied and paid pursuant to sections 2434, 2488, 24931, and 24933, Hawaii Revised Statutes, and federal moneys received by the State or any department thereof that are available to pay principal of and/or interest on indebtedness of the State, or such part of any thereof as the department may determine, and other user taxes, fees, or charges currently or hereafter derived from or arising through the ownership, operation, and management of highways and related facilities and the furnishing and supplying of the services thereof.  The expenses related to the issuance of such highway revenue bonds, to the extent not paid from the proceeds of such bonds, shall be paid from the state highway fund.

     The governor, in the governor's discretion, is authorized to use the state highway fund to finance those projects authorized in part II and listed in part IV of this Act where the method of financing is designated to be by highway revenue bond funds; provided that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 69.  UNIVERSITY OF HAWAII REVENUE BONDS.  The University of Hawaii board of regents is authorized to issue revenue bonds for capital improvement program projects authorized in part II and listed in part IV of this Act and designated to be financed by revenue bond funds, in principal amounts as are required to yield the amounts appropriated for capital improvement program projects, and if determined by the board of regents and approved by the governor, any additional principal amount deemed necessary by the board of regents to pay interest on the revenue bonds during the estimated period of construction of the capital improvement program project for which the revenue bonds are issued, to establish, maintain, or increase reserves for the revenue bonds, and to pay all or any part of the expenses related to the issuance of the revenue bonds.  The revenue bonds shall be issued pursuant to the provisions of part III of chapter 39, Hawaii Revised Statutes, as amended, except that the bonds shall be issued in the name of the University of Hawaii and not in the name of the State.  The principal of and interest on the revenue bonds, to the extent not paid from the proceeds of the revenue bonds, shall be payable from and secured by the revenues derived from facilities under the ownership of the University of Hawaii or operated and managed by the University of Hawaii, or any part thereof as the board of regents may determine, including other moneys, rates, rents, fees, or charges currently or hereafter derived from or arising through the ownership, operation, and management of university facilities and the furnishings and supplying of the services thereof.  The expenses related to the issuance of the revenue bonds, to the extent not paid from the proceeds of the bonds, shall be paid from the special funds of the University of Hawaii.

     The governor, in the governor's discretion, is authorized to use University of Hawaii special funds to finance those projects authorized in part II and listed in part IV of this Act where the method of financing is designated to be by University of Hawaii revenue bonds; provided that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 70.  HAWAIIAN HOME LANDS REVENUE BONDS.  The department of Hawaiian home lands is authorized to issue Hawaiian home lands revenue bonds for Hawaiian home lands capital improvement program projects authorized in part II and listed in part IV of this Act and designated to be financed by revenue bond funds or by general obligation bond funds with debt service cost to be paid from special funds, in such principal amount as shall be required to yield the amounts appropriated for such capital improvements program projects, and, if so determined by the department and approved by the governor, such additional principal amount as may be deemed necessary by the department to pay interest on the Hawaiian home lands revenue bonds during the estimated period of construction of the capital improvements program project for which the Hawaiian home lands revenue bonds are issued, to establish, maintain, or increase reserves for the Hawaiian home lands revenue bonds heretofore authorized (whether authorized and issued or authorized and still unissued), and to pay the expenses of issuance of the bonds.  The aforementioned Hawaiian home lands revenue bonds shall be issued pursuant to the provisions of part III of chapter 39, Hawaii Revised Statutes, as the same may be amended from time to time.  The principal of and interest on Hawaiian home lands revenue bonds, to the extent not paid from the proceeds of such bonds, shall be payable solely from and secured solely by the revenues from Hawaiian home lands, revenues from available lands as defined in section 203 of the Hawaii Homes Commission Act, 1920, and related facilities under the ownership of the State or operated and managed by the department or such parts of either thereof as the department may determine, including rents and other fees or charges presently or hereafter derived from or arising through the ownership, operation, and management of Hawaiian home lands, available lands as defined in section 203 of the Hawaii Homes Commission Act, 1920, and related facilities.  The expenses of the issuance of the Hawaiian home lands revenue bonds, to the extent not paid from the proceeds of such bonds, shall be paid from the department of Hawaiian home lands revenue bond special fund.

     The governor, in the governor's discretion, is authorized to use the department of Hawaiian home lands revenue bond special fund to finance those projects authorized in part II and listed in part IV of this Act where the method of financing is designated to be by Hawaiian home lands revenue bond funds; provided that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

PART VII.  SPECIAL PROVISIONS

     SECTION 71.  GOVERNOR'S DISCRETIONARY POWERS.  Any law or provision to the contrary notwithstanding, the governor may replace general obligation bond funds appropriated for capital improvement projects with general obligation reimbursable bond funds, when the expenditure of such general obligation reimbursable bond funds is deemed appropriate for the project.

     SECTION 72.  All general obligation bond funds used for a public undertaking, improvement, or system designated by the letter (D) shall have the bond principal and interest reimbursed from the special fund in which the net revenue, or net user tax receipts, or combination of both, of such public undertaking, improvement, or system, are deposited or credited.  Bonds issued for irrigation and housing projects shall be reimbursed as provided by section 174‑21 and chapter 201H, Hawaii Revised Statutes, respectively.

     The governor is authorized to use, at the governor's discretion, the state highway fund, the harbor special fund, the boating special fund, the airport revenue fund, the special land and development fund, or other appropriate special funds to finance the respective public undertaking, improvement, or system described above and authorized in this Act, where the method of financing is designated to be general obligation bond fund with debt service cost to be paid from the funds.

     SECTION 73.  The governor may supplement funds for any cost element for a capital improvement project authorized under this Act by transferring such sums as may be needed from the funds appropriated for other cost elements of the same project by this Act or any other prior or future act that has not lapsed; provided that the total expenditure of funds for all cost elements shall not exceed the total appropriations for that project; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 74.  After the objectives and purposes of appropriations made in this Act from the general obligation bond fund for capital improvement projects have been met, unrequired balances, except those from University of Hawaii projects, shall be transferred to the project adjustment fund appropriated in part II and described in part IV of this Act, and shall be considered a supplementary appropriation thereto; provided that all other unrequired allotment balances, unrequired appropriation balances, and unrequired encumbrance balances shall lapse as of June 30, 2014, as provided in section 80 of this Act; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 75.  If the authorized appropriations specified for capital improvement projects listed in this Act or in any other act currently authorized by the legislature are insufficient, and where the source of funding for the project is designated as the general obligation bond fund, the governor may make supplemental allotments from the project adjustment fund appropriated in part II and described in part IV of this Act to supplement any currently authorized capital investment cost elements; provided further that such supplemental allotments from the project adjustment fund shall not be used to increase the scope of the project; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 76.  After the objectives and the purposes of appropriations made in this Act for capital investment purposes from the state educational facilities improvement special fund have been met, any unrequired balances shall be transferred to the special funded project adjustment fund for state educational facilities appropriated in part II and described further in part IV, and shall be considered a supplementary appropriation thereto; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 77.  If the currently authorized appropriations specified for capital investment purposes listed in this Act or in any other act currently authorized by the legislature are insufficient, and where the source of funding for the project is designated as the state educational facilities improvement special fund, the governor may make supplemental allotments from the special funded project adjustment fund for state educational facilities; provided further that the supplemental allotments from the special funded project adjustment fund for state educational facilities shall not be used to increase the scope of the project and may only be made to supplement currently authorized capital investment project cost elements; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 78.  After the objectives and purposes of appropriations made in this Act from the general obligation bond fund for capital improvement projects for the University of Hawaii have been met, unrequired balances shall be transferred to the University of Hawaii project adjustment fund appropriated in part II and described in part IV of this Act, and shall be considered a supplementary appropriation thereto; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 79.  If the authorized appropriations specified for University of Hawaii capital improvement projects listed in this Act or in any other act currently authorized by the legislature are insufficient, and where the source of funding for the project is designated as the general obligation bond fund, the governor may make supplemental allotments from the University of Hawaii project adjustment fund appropriated in part II and described in part IV of this Act to supplement any currently authorized capital investment cost elements; provided further that such supplemental allotments from the project adjustment fund shall not be used to increase the scope of the project; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 80.  Any provision of this Act to the contrary notwithstanding, the appropriations made for capital improvement projects authorized under this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all appropriations made to be expended in fiscal biennium 2011‑2013 that are unencumbered as of June 30, 2014, shall lapse as of that date; provided further that this lapsing date shall not apply to:  (1) appropriations for projects described in section 36 of this Act where the means of financing is designated to be the state educational facilities improvement special fund, where such appropriations have been authorized for more than three years for the construction or acquisition of public school facilities; and (2) non‑general fund appropriations for projects described in section 36 of this Act where such appropriations have been deemed necessary to qualify for federal aid financing and reimbursement.

     SECTION 81.  Where it has been determined that changed conditions, such as a reduction in the particular population being served, permit the reduction in the scope of a capital improvement project described in this Act, the governor may authorize such reduction of project scope; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 82.  In releasing funds for capital improvement projects, the governor shall consider legislative intent and the objectives of the user agency and its programs; the scope and level of the user agency's intended service; and the means, efficiency, and economics by which the project will meet the objectives of the user agency and the State; provided further that agencies responsible for construction shall take into consideration legislative intent, the objectives of the user agency and its programs, and the scope and level of the user agency's intended service and construct the improvement to meet the objectives of the user agency in the most efficient and economical manner possible.

     SECTION 83.  With the approval of the governor, designated expending agencies for capital improvement projects authorized in this Act may delegate to other state or county agencies the implementation of projects when it is determined advantageous to do so by both the original expending agency and the agency to which expending authority is to be delegated; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 84.  Where county capital improvement projects are partially or totally funded by state grants as authorized in this Act or any other act of the legislature, this fact should be appropriately acknowledged during construction and upon completion of these projects.

     SECTION 85.  The governor may authorize the expenditure of funds for capital improvement projects not previously authorized in this Act to cope with the effects of natural disasters or unforeseen emergencies, when the effects of the natural disasters or unforeseen emergencies create an urgent need to pursue a course of action that is in the best interest of the State; provided further that no funds shall be expended without a formal declaration of a natural disaster or emergency by the governor; and provided further that the governor shall use the project adjustment fund authorized in part II and described in part IV to accomplish the purposes of this section; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 86.  Notwithstanding any provision in part III of this Act, the governor is authorized to transfer savings or unrequired balances as may be available from the appropriated funds of any program in this Act to supplement the appropriation for any other program in this Act to cope with the effects of natural disasters or other unforeseen emergencies; provided that the effects of such natural disasters or emergencies create an urgent need to pursue a course of action that is in the best interest of the State; provided further that the use of such funds does not conflict with general law; and provided further that no funds shall be expended without a formal declaration of a natural disaster or emergency by the governor; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 87.  No appropriation authorized in this Act for expenditure by a political subdivision of this State shall be considered to be a mandate to undertake new programs or to increase the level of services under existing programs of that political subdivision.  If any appropriation authorized in this Act constitutes such a mandate within the provisions of section 5 of article VIII of the Hawaii State Constitution, such authorization shall be void and, in the case of capital improvement appropriations designated to be financed from the general obligation bond fund, the total general obligation bonds authorized for such projects shall be correspondingly decreased.

     SECTION 88.  Whenever the expending agency to which an appropriation is made is changed due to legislation enacted during any session of the legislature that affects the appropriations made by this Act, the governor shall transfer the necessary funds and positions to the proper expending agency as provided by law.

     SECTION 89.  If the State should assume the direct operation of any non‑governmental agency receiving state funds under the provisions of this Act, all such funds shall constitute a credit to the State against the costs of acquiring all or any portion of the property, real, personal, or mixed, of such non‑governmental agency.  This credit shall be applicable regardless of when such acquisition takes place.

     SECTION 90.  If unanticipated federal funding cutbacks diminish or curtail essential, federally funded state programs, the governor may utilize savings as determined to be available from other state programs for the purpose of maintaining such programs until the next legislative session; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 91.  The governor may approve the expenditure of federal funds, including federal stimulus funds, that are in excess of levels authorized by the legislature; provided further that the governor may allow for an increase in the federal fund authorization ceiling for the program to accommodate the expenditure of such funds; provided further that prior to the governor's approval to expend these funds, the governor shall submit a report to the legislature; provided further that the report shall include the date when the program to receive the federal funds was first notified that additional federal funds may be available, the date that additional federal funds were known to be available, the reasons why additional federal fund appropriations were not sought during the preceding legislative session, and an explanation of the public benefit; provided further that if federal funds are received as a result of a natural or manmade disaster, the governor shall submit notification to the legislature within five days after the governor's approval to expend funds has been granted; and provided further that the governor shall submit a summary report of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 92.  Where an agency is authorized to secure funds or other property from private organizations or individuals to be expended or utilized in connection with any authorized program, the agency, with the governor's approval, may enter into such undertaking, provided that the provisions of the undertaking comply with applicable state constitutional and statutory requirements; and provided further that the governor shall notify the legislature within five days of each use of this authority and submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 93.  Except as otherwise provided by general law, negotiations for the purchase of land by state agencies shall be subject to the approval of the governor and the department of land and natural resources, or other appropriate agency; provided further that private lands may be acquired for the purpose of exchange for federal lands when the department of land and natural resources and the governor determine that the acquisition and exchange are necessary for the completion of any project specifically authorized by this Act.

     SECTION 94.  Except as otherwise provided, or except as prohibited by specific grant conditions, all federal or non‑general fund reimbursements received by state programs shall be returned to the general fund or fund of originating expenses.

     SECTION 95.  Unless otherwise provided in this Act, the governor is authorized to transfer operating funds between appropriations within the same fund, within an expending agency, for operating purposes; provided further that the governor shall submit a report to the legislature within five days of each use of this authority; provided further that the report shall include the date of transfer, the amount of the transfer, the program ID from which funds were transferred, the program ID to which funds were transferred, the impact to the program ID funds are transferred from, and a detailed explanation of the public purposes served by the transfer of resources; and provided further that the governor shall submit to the legislature a summary report containing the aforementioned information for each use of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 96.  Notwithstanding any provision to the contrary, the director of finance, with the approval of the governor, shall transfer into retirement benefit – state (BUF 741) $88,200,000 for fiscal year 2011-2012 and $88,200,000 for fiscal year 2012-2013 for labor savings attributable to collective bargaining agreements for all bargaining units and pursuant to any executive memoranda that results in salary savings for all employees not included under collective bargaining in respective state agencies; provided further that the governor shall submit a report to the legislature within five days of each transfer that shall include the date of the transfer, the amount of the transfer, the program ID from which funds are transferred, and the collective bargaining unit for which the transfer was made; and provided further that the governor shall submit to the legislature a summary report for all transfers by December 1 for the previous twelve-month period.

     SECTION 97.  Notwithstanding any provision to the contrary, the director of finance, with the approval of the governor, shall transfer into health premium payments - state (BUF 761) $50,000,000 for fiscal year 2011-2012 and $50,000,000 for fiscal year 2012-2013; provided further that in making each transfer, the governor shall consider the legislature's intent that the administration assess state needs and make appropriate reductions to programs that are consistent with an effort to reprioritize state government; provided further that the governor shall submit a report to the legislature within five days of each use of this authority that shall include the date of the assessment, the amount of the assessment, the program ID from which funds were assessed, a detailed explanation of the reason for which funds were transferred from a particular program ID, including a detailed report of any performance measurements or standards used in evaluating such assessment, and the impact to the program ID from which funds are transferred; from and provided further that the governor shall submit to the legislature a summary report for all transfers by December 1 for the previous twelve-month period.

     SECTION 98.  Except as otherwise provided in this Act, each department or agency is authorized to transfer positions within its respective authorized position ceiling for the purpose of maximizing the utilization of personnel resources and staff productivity; provided further that all such actions shall be with the prior approval of the governor and shall be consistent with appropriations provided in this Act and with part II of chapter 37, Hawaii Revised Statutes; provided further that the governor shall submit a report to the legislature within five days of each use of this authority; provided further that the report shall include the date of the transfer, the position transferred, the program from which the position was transferred, the program to which the position was transferred, responsibilities of the position prior to transfer, the responsibilities of the position after the transfer, and the manner in which the transfer maximizes the utilization of personnel resources and staff productivity; and provided further that the governor shall submit to the legislature a summary report of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 99.  Any law or provision to the contrary notwithstanding, in expending funds for social welfare programs, education programs, and other programs and agencies having appropriations that are based on population and workload data as specified in the executive budget document, only so much as is necessary to provide the level of services intended by the legislature shall be expended.  Affected agencies shall reduce expenditures below appropriations under procedures prescribed by the department of budget and finance in the event actual population and workload trends are less than the figures projected; and provided further that the department of budget and finance shall notify the legislature within five business days of each application of this proviso and submit a report of all applications of this proviso for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 100.  With the approval of the governor, agencies that use appropriations authorized in part II of this Act for audit services may delegate that responsibility and transfer funds to the internal post audit program (AGS 104), when it is determined by such agencies that it is advantageous to do so; and provided further that the governor shall submit to the legislature a summary report of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 101.  With the approval of the governor, expending agencies that use appropriations authorized in part II of this Act for planning, land acquisition, design, construction, and equipment for repair and alterations may delegate responsibility and transfer funds to public works – planning, design and construction (AGS 221) for the implementation of the repair and alterations, when it is determined by the agencies that it is advantageous to do so; and provided further that the governor shall submit to the legislature a summary report of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 102.  Agencies with appropriations authorized in part II of this Act for risk management costs shall transfer funds authorized for that purpose to the state risk management and insurance administration (AGS 203) for the administration and implementation of state risk management costs and expenses, except as otherwise provided by law.

     SECTION 103.  With the approval of the governor, the Hawaii health systems corporation in the department of health may transfer to the department of human services funds appropriated to the Hawaii health systems corporation for the care and treatment of patients, whenever the department of human services can utilize such funds to match federal funds that may be available to help finance the cost of outpatient, acute hospital, or longterm care of indigents or medical indigents in designated critical access hospitals; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 104.  With the approval of the governor, the department of health may transfer to the department of human services funds appropriated to the department of health for the care and treatment of patients, whenever the department of human services can utilize such funds to match federal funds to finance the cost of outpatient, hospital, or skilled nursing home care of indigents or medical indigents; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 105.  The department of human services is authorized to enter into agreements with the department of health to furnish outpatient, hospital, and skilled nursing home care of indigents or medical indigents and to pay the department of health for such care; provided that with the approval of the director of finance, the department of health may deposit part of such receipts into the appropriations from which transfers were made as provided elsewhere in this Act; and provided further that the governor shall submit a report to the legislature of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 106.  Provided that of the appropriation for each principal state department as defined by section 26‑4, Hawaii Revised Statutes, the sum of $2,500 for fiscal year 2011‑2012 and the sum of $2,500 in fiscal year 2012‑2013 shall be made available in each department to be established as a separate account for a protocol fund to be expended at the discretion of the executive head of the department or agency (i.e., director, chairperson, comptroller, adjutant general, superintendent, president, or attorney general).

     SECTION 107.  Provided that of the general fund appropriation for Hawaii state public library system (EDN 407), the sum of $2,500 for fiscal year 2011‑2012 and the sum of $2,500 for fiscal year 2012‑2013 may be used to establish a separate protocol account to be expended at the discretion of the state librarian.

     SECTION 108.  Provided that of the general fund appropriation for financial administration (BUF 115), the sum of $4,000 for fiscal year 20112012 and the sum of $4,000 for fiscal year 20122013 may be used to establish a separate protocol account to be expended at the discretion of the director of finance for the promotion and improvement of state bond ratings and sales; provided further that the director of finance shall prepare a detailed report of all expenditures made from the protocol account that shall include the date of any expenditure, the purpose of any expenditure, the name of the entity that received the funds, and an explanation of the manner in which the expenditures promoted and improved the state bond ratings and sales; and provided further that the director of finance shall submit this report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 109.  Provided that the department of budget and finance shall post on its website all finance memorandums, executive memorandums, and administrative directives on the same day that the memorandums and directives are distributed; provided further that all attachments to the memorandums and directives shall also be posted; provided further that all finance memorandums, executive memorandums, and administrative directives issued since January 1, 2000, shall also be posted; provided further that all documents submitted to the legislature pursuant to chapter 37, Hawaii Revised Statutes, since December 1, 2008, shall be posted; and provided further that all governor's messages requesting adjustments to these documents shall also be posted.

     SECTION 110.  Provided that of the special fund appropriation for spectator events and shows ‑ Aloha Stadium (AGS 889), the sum of $2,500 for fiscal year 2011‑2012 and the sum of $2,500 for fiscal year 2012‑2013 may be expended at the discretion of the stadium manager for promotion and other stadium related purposes.

     SECTION 111.  Except as otherwise provided, the appropriation for the office of the governor (GOV 100) shall be expended at the discretion of the governor.

     SECTION 112.  Except as otherwise provided, the appropriation for the office of the lieutenant governor (LTG 100) shall be expended at the discretion of the lieutenant governor.

     SECTION 113.  Provided that of the appropriations authorized for executive programs in part II of this Act for fiscal year 2011‑2012 and fiscal year 2012‑2013, settlements and judgments approved by the legislature in H.B. No. 1001, H.D. 2, S.D. 2, C.D. 1, the Claims Bill, shall be funded within each program's departmental allocation for the respective fiscal year.

     SECTION 114.  Provided that if the amount of settlements and judgments approved by the legislature in H.B. No. 1001, H.D. 2, S.D. 2, C.D. 1 the Claims Bill, exceeds program allocations for fiscal year 2011‑2012 or fiscal year 2012‑2013, as applicable, for the purposes of meeting such obligations:

     (1)  A department, with the approval of the governor, is authorized to utilize allocated savings determined to be available from any other program within the department; and

     (2)  Unless otherwise provided by general law, the governor is authorized to transfer funds between allocations of appropriations within a department for the purposes of paying settlements and judgments of a program;

provided further that the governor shall submit a report of all uses of this authority for the previous twelve month period no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 115.  The director of finance is authorized to expend general fund, special fund, and revolving fund savings or balances determined to be available from authorized general fund, special fund, and revolving fund program appropriations, up to an aggregate total of $20,000,000 for fiscal year 20112012 and $20,000,000 for fiscal year 20122013, for municipal lease payments under financing agreements entered into pursuant to chapter 37D, Hawaii Revised Statutes, to finance the acquisition of depreciable assets, including but not limited to automobiles, computers, printers, and telecommunications equipment; and provided further that designated expending agencies (including the department of education and the University of Hawaii) for municipal lease payments and for depreciable assets, including but not limited to automobiles, computers, printers, and telecommunications equipment authorized in this Act may delegate to the director of finance the implementation of such acquisitions when it is determined by all involved agencies that it is advantageous to do so; and provided further that the governor shall submit to the legislature a summary report of all uses of this authority for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 116.  Provided that for all notification and reporting requirements in this Act, copies of the notification or report shall be submitted to the senate president's office, the speaker of the house of representatives' office, the senate ways and means committee chairperson's office, the house of representatives' finance committee chairperson's office, and to the appropriate standing committees' chairperson's office that has oversight responsibilities over the state program affected; and provided further that the notification and report shall be posted on the website of the agency responsible for submitting the notification or report.

     SECTION 117.  Notwithstanding any provision in part III of this Act, the governor is authorized to transfer savings or unrequired balances as may be available of general funds from any program in this Act to supplement the department of land and natural resources' fire‑fighter's contingency fund; provided further that these funds shall be used to prevent, control, and extinguish wildland fires within forest reserves, public hunting areas, wildlife and plant sanctuaries, and natural area reserves, and to fulfill mutual aid agreements in cooperation with fire control agencies of the counties and federal government.

     SECTION 118.  Provided that of the special fund appropriation for native resources and fire protection program (LNR 402), the sum of $3,000,000 or so much thereof as may be necessary and available for fiscal year 2011‑2012 and the sum of $3,000,000 or so much thereof as may be necessary and available for fiscal year 2012‑2013 shall be expended by the department of land and natural resources as directed by the Hawaii invasive species council to prevent the introduction of invasive species, implement invasive species control, conduct research and outreach, and eradicate established invasive species; provided further that the funds shall not be expended for any other purpose; provided further that any unexpended funds shall lapse to their respective funds; provided further that the funds to be expended for the program are matched by an equivalent amount, up to $3,000,000, in new federal, county, private, and other non‑state funds or in‑kind services for each fiscal year; provided further that the department shall jointly work with other agencies and the community; and provided further that portions of this appropriation may be transferred to other state departments to be expended for activities related to the statewide invasive species prevention, control, research, and outreach partnership program.

     SECTION 119.  Provided that no funds, including federal funds, shall be expended to fill any position not authorized by the legislature; provided further that this prohibition shall not apply to:

     (1)  The University of Hawaii and the Hawaii health systems corporation;

     (2)  Positions entirely federally funded;

     (3)  Positions established pursuant to section 76‑16(b)(3), (12), (13), (21), and (23), Hawaii Revised Statutes; or

     (4)  Where an agency has explicit statutory authorization to establish positions to accomplish necessary functions;

provided further that with regard to any of the positions identified in paragraphs (1), (2), (3), or (4), the respective agency or department shall submit a report to the legislature within five days of each use of this provision; provided further that the report shall include:

     (1)  Authority used to establish the position;

     (2)  Date the position was established;

     (3)  Projected date the position will be filled;

     (4)  Amounts projected to be expended in fiscal year 2011‑2012 and in fiscal year 2012‑2013;

     (5)  Source of funds used to pay for the position; and

     (6)  Functions to be performed by the position;

and provided further that the department of budget and finance shall submit to the legislature a summary report of all uses of this provision for the previous twelve month period from December 1 to November 30 no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 120.  Provided that in releasing funds for operating program appropriations, the governor shall consider legislative intent and the objectives of the user agency and its programs; the scope and level of the user agency's intended service; and the means, efficiency, and economics by which the appropriation will meet the objectives of the user agency and the State; and provided further that agencies responsible shall take into consideration legislative intent, the objectives of the user agency and its programs, and the scope and level of the user agency's intended service, and expend funds to meet the objectives of the user agency in the most efficient and economical manner possible.

     SECTION 121.  Provided that the department of business, economic development and tourism shall prepare a report that shall include but not be limited to a cost benefit analysis of consolidating the Hawaii strategic development corporation and the high technology development corporation into a single agency within the department; provided further the report shall include a detailed narrative on the results of the cost benefit analysis; provided further the report shall include impact statements from each of the three agencies' administrators; and provided further that the department shall submit the report to the legislature no later than forty days prior to the convening of the 2012 regular session.

     SECTION 122.  Provided that the department of business, economic development and tourism shall prepare a comprehensive report on the department's efforts to reorganize that shall include:

     (1)  A chronology of all reorganizations implemented for the prior six years;

     (2)  The impact of all reduction in force actions and identification of all impacted positions by program ID;

     (3)  Department-wide and agency specific goals of current reorganization efforts;

     (4)  Impacted position titles and numbers by program ID; and

     (5)  Impact statements from each affected division's administrator;

and provided further the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 regular session.

     SECTION 123.  Provided that the department of business, economic development and tourism shall prepare a report on its energy program operations to include but not be limited to:

     (1)  A comprehensive review of all energy contracts including the contract term, cost, means of financing, purpose, projected returns, and priority level;

     (2)  Budgeted and actual operating expenditures for the prior fiscal year and budgeted and estimated operating expenditures for the current fiscal year and planned expenditures for the next two fiscal years by cost element and means of financing;

     (3)  A list of energy program staff that shall include position title, position number, salary, means of financing, date established, and responsibilities;

     (4)  A plan of action to generate funds for programs that are expected to continue beyond the availability of federal grants; and

     (5)  Updated cost projections for program needs beyond those afforded by federal sources; and

provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 regular session.

     SECTION 124.  Provided that the department of transportation shall prepare a report on all travel-related expenses compensated by non-state organizations by program ID that shall include a detailed list of each instance of travel identifying:

     (1)  Position traveling and the purpose;

     (2)  Destination and departure and arrival dates;

     (3)  Itemization of all compensated costs and the value; and

     (4)  Organization compensating the travel and the reason;

provided further that the report shall encompass travel from December through November preceding the date the report is submitted; and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 125.  Provided that the department of transportation shall prepare a report on all budgeted and actual expenditures for special maintenance programs by program ID and means of financing for the prior three fiscal years, budgeted and estimated for the current fiscal year, and budgeted and projected for the next fiscal year; provided further that all variances from budgeted amounts shall be explained; and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 126.  Provided that the department of human services shall prepare a report that shall include but not be limited to a detailed financial plan by means of financing for all funds expended under the TANF and TAONF programs that shall encompass projected and actual expenditures for the prior two fiscal years, projected and estimated expenditures for the current fiscal year, and projected expenditures for the next two fiscal years; provided further that all variances shall be explained; provided further that the financial plan shall include the balance of funds in the TANF Federal Reserve Fund for each of the fiscal years in the report; provided further that the financial plan shall include program ID numbers, contract names and priority numbers for each line item; and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 127.  Provided that the department of human services shall prepare a report on the TANF and TAONF programs for the prior and current fiscal year that shall include:

     (1)  The program's measures of effectiveness, projected, and actual outcomes;

     (2)  Work participation rates for two-parent families and all families included in calculation of the federal work participation rate;

     (3)  A listing of Hawaii businesses participating in TANF and TAONF funded work programs and amounts subsidized;

     (4)  A listing of all contracts funded by the TANF and TAONF programs categorized by purpose that identifies program priority levels, amounts contracted, means of financing, an explanation of the benefits derived from each contract, and identification of all laws that require the state to provide the service; and

     (5)  Utilization levels of each contract funded by the TANF and TAONF programs and populations served;

and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 128.  Provided that the department of human services shall prepare a report on the TANF and TAONF programs that shall include by program ID and means of financing the amounts and descriptions of use of all TANF and TAONF funds budgeted for the current fiscal year and the subsequent fiscal year; provided further that the report shall also include by program ID the amounts and descriptions of use of all general funds that may be used to meet maintenance of effort requirements for TANF funds budgeted for the current fiscal year and the subsequent fiscal year; and provided further that the department shall submit this report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

     SECTION 129.  Provided that the department of Hawaiian home lands shall prepare a financial plan for the ensuing six years that shall include projected amounts and sources of revenue, details of projected expenditures, projected fund balances, and descriptions of major projects and methods of financing; and provided further that the department shall submit the plan to the legislature no later than thirty days prior to the convening of the 2012 regular session.

     SECTION 130. Provided that the superintendent's office (EDN 300) shall submit a report to the legislature each quarter of fiscal year 2011-2012 and fiscal year 2012-2013 containing a listing of cases and incidents resulting in any audit or investigation; provided further that the reports shall include the date the audit or investigation began, date completed, type of case or incident being investigated, a summary of investigation, and upon request by a legislative committee a copy of the actual audit or investigation report; and provided further that any information deemed personally identifiable shall be redacted by the department prior to submittal.

     SECTION 131.  Provided that of the general fund appropriation for the department of education, excluding charter schools, no funds for fiscal year 2012-2013 shall be expended for home-to-school transportation costs not mandated by state or federal law; provided further that the department shall prepare a report that includes:

(1)  A comprehensive analysis of alternatives for providing student transportation, including mandated student transportation services, including but not limited to the elimination of transportation services not mandated by law, route consolidation and reduction scenarios, methods of reducing contracted costs, implementation of transportation services with state personnel and/or buses, partnerships with county agencies, and the use of tripper service as defined in 49 CFR 605.3;

(2)  A cost benefit analysis of each alternative identified;

(3)  A prioritized listing of student transportation routes, the reason the route is a priority, the projected number of students serviced, and the projected cost of providing transportation service for the route;

(4)  An examination of fee schedules and evaluation of various pricing strategies;

(5)  An evaluation of how student transportation is successfully administered and costs are managed and paid for in at least four other jurisdictions;

(6)  Recommendations on the options identified in the report; and

(7)  Identification of the actual costs for all student transportation services, including mandated, for the prior two fiscal years and projected costs for the current fiscal year by means of financing, contract, and route and identification of those costs;

provided further that the department shall submit the report to the legislature no later than forty days prior to the convening of the 2012 regular session; and provided further that the legislature may appropriate funds for student transportation services not mandated by state or federal law upon receipt and evaluation of the report.

     SECTION 132.  Provided that the department of education, excluding charter schools, shall prepare a report on STEM and creative media programs and in that report: define STEM and the applicable programs within the department, list and describe applicable creative media programs to be highlighted in the report, specify the approximate number of eligible students and the number of participating students for the STEM and creative media programs by program; provided further that the report shall evaluate projects demonstrating cost-effective outcomes and improved student performance in STEM and creative media experiential learning programs; provided further that the report shall encompass all initiatives and outcomes, including those achieved for the pilot HI-EST Academies initiative between 2007-2011; and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 regular session.  

     SECTION 133.  Provided that the department of public safety shall prepare a report on overtime costs that shall include the following:

     (1)  Amount budgeted for overtime by program ID;

     (2)  Amount expended on overtime by program ID;

     (3)  Explanation of the department's plans to better reflect the true cost of overtime by submitting requests to the legislature to transfer funds currently being used for overtime from where the funds are budgeted to the overtime cost category; and

     (4)  Strategies the department will use to reduce such expenditures in the future;

provided further that the report shall include actual expenditures on overtime from fiscal year 2003-2004 to the prior fiscal year; provided further that the report shall include to-date and projected expenditures on overtime for the current fiscal year to fiscal year 2015-2016; and provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions.

PART VIII.  MISCELLANEOUS AND EFFECTIVE DATE

     SECTION 134.  If any portion of this Act or its application to any person, entity, or circumstance is held to be invalid for any reason, then the legislature declares that the remainder of the Act and each and every other provision thereof shall not be affected thereby.  If any portion of a specific appropriation is held to be invalid for any reason, the remaining portion shall be expended to fulfill the objective of such appropriation to the extent possible.

     SECTION 135.  If any manifest clerical, typographical, or other mechanical errors are found in this Act, the governor is hereby authorized to correct such errors.

     SECTION 136.  Material to be repealed is bracketed and stricken.  New material is underscored.

     SECTION 137.  This Act shall take effect on July 1, 2011.

Report Title:

State Budget

 

Description:

Appropriates funds for the operating and capital improvement budget of the Executive Branch for fiscal years 2011-2012 and 2012-2013. (HB200 CD1)

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback