NY A00911 | 2011-2012 | General Assembly
Status
Spectrum: Partisan Bill (Democrat 8-0)
Status: Introduced on January 5 2011 - 25% progression, died in chamber
Action: 2011-03-24 - enacting clause stricken
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on January 5 2011 - 25% progression, died in chamber
Action: 2011-03-24 - enacting clause stricken
Text: Latest bill text (Introduced) [HTML]
Summary
Establishes the canal pilot water level management program and hydraulic model for the purpose of enhancing navigation and flood mitigation, improving real-time flood forecasting, enabling pro-active flood responsiveness and developing unified operating procedures through collection, analysis, coordination and dissemination of real-time water and systems data along the canal system; provides for a report to be issued within three years of the effective date.
Title
Establishes the canal pilot water level management program and hydraulic model for the purpose of enhancing navigation and flood mitigation, improving real-time flood forecasting, enabling pro-active flood responsiveness and developing unified operating procedures through collection, analysis, coordination and dissemination of real-time water and systems data along the canal system; provides for a report to be issued within three years of the effective date.
Sponsors
Asm. Ro Ann Destito [D] | Asm. Robert Reilly [D] | Asm. Barbara Clark [D] | Asm. Deborah Glick [D] |
Asm. Nettie Mayersohn [D] | Asm. John McEneny [D] | Asm. Darryl Towns [D] | Asm. Harvey Weisenberg [D] |
History
Date | Chamber | Action |
---|---|---|
2011-03-24 | Assembly | enacting clause stricken |
2011-01-05 | Assembly | referred to environmental conservation |