Bill Text: RI S2808 | 2024 | Regular Session | Introduced


Bill Title: Requires that developers of ground-mounted solar systems submit a plan for decommissioning to be held on file by the municipality and requires DEM, with the office of energy resources, make publicly available model decommissioning plans.

Spectrum: Partisan Bill (Democrat 8-0)

Status: (Introduced) 2024-04-26 - Scheduled for hearing and/or consideration (05/01/2024) [S2808 Detail]

Download: Rhode_Island-2024-S2808-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback