Bill Text: RI S2808 | 2024 | Regular Session | Introduced
Bill Title: Requires that developers of ground-mounted solar systems submit a plan for decommissioning to be held on file by the municipality and requires DEM, with the office of energy resources, make publicly available model decommissioning plans.
Spectrum: Partisan Bill (Democrat 8-0)
Status: (Introduced) 2024-05-01 - Committee recommended measure be held for further study [S2808 Detail]
Download: Rhode_Island-2024-S2808-Introduced.pdf