Bill Text: TX HB4224 | 2021-2022 | 87th Legislature | Introduced


Bill Title: Relating to the winter weather emergency preparedness of facilities for providing electric service.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2021-03-29 - Referred to State Affairs [HB4224 Detail]

Download: Texas-2021-HB4224-Introduced.html
  87R10808 JXC-D
 
  By: Bucy H.B. No. 4224
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the winter weather emergency preparedness of facilities
  for providing electric service.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter A, Chapter 35, Utilities Code, is
  amended by adding Section 35.0025 to read as follows:
         Sec. 35.0025.  WINTER WEATHER EMERGENCY PREPAREDNESS. (a)
  The commission by rule shall establish best practices and
  procedures for providers of generation in the ERCOT power region
  for: 
               (1)  winterization, including supplies, equipment,
  personnel, and preventative action checklists for preparations for
  extreme weather events;
               (2)  plant design for new plants and modifications to
  existing plants to ensure the plants can operate at the lowest
  recorded ambient temperature for the nearest municipality for which
  historical data is available;
               (3)  maintenance and inspections, especially of freeze
  protection elements;
               (4)  heat tracing;
               (5)  thermal insulation;
               (6)  the erection of adequate windbreaks and
  enclosures;
               (7)  annual winter-specific and plant-specific
  operator awareness and maintenance training; 
               (8)  prioritizing winter preparation each fall;
               (9)  establishing personnel accountability and audit
  procedures; and 
               (10)  updating facility procedures at least annually as
  needed.
         (b)  The commission by rule shall require each provider of
  generation in the ERCOT power region to:
               (1)  prepare, submit to the commission, and update as
  necessary a plan for: 
                     (A)  using the best practices and procedures to
  provide adequate electric generation service during a winter
  weather emergency;
                     (B)  conducting regular preventative maintenance
  for freeze protection elements;
                     (C)  inspecting freeze protection elements before
  and during the winter;
                     (D)  testing and evaluating freeze protection
  elements after winter to identify potential improvements, required
  maintenance, and any necessary component replacement; and
                     (E)  making any needed repairs or improvements
  before the next winter; and
               (2)  implement the plan submitted under Subdivision
  (1).
         (c)  The commission shall regularly inspect facilities of
  providers of generation for compliance with rules adopted under
  this section. 
         SECTION 2.  Subchapter D, Chapter 38, Utilities Code, is
  amended by adding Section 38.074 to read as follows:
         Sec. 38.074.  WINTER WEATHER EMERGENCY PREPAREDNESS. (a)
  The commission by rule shall establish best practices and
  procedures for electric cooperatives, municipally owned utilities,
  and transmission and distribution utilities providing transmission
  or distribution service in the ERCOT power region for:
               (1)  winterization, including supplies, equipment,
  personnel, and preventative action checklists for preparations for
  extreme weather events;
               (2)  maintenance and inspections, especially of freeze
  protection elements;
               (3)  heat tracing;
               (4)  thermal insulation;
               (5)  the erection of adequate windbreaks and
  enclosures;
               (6)  annual winter-specific operator awareness and
  maintenance training;
               (7)  prioritizing winter preparation each fall;
               (8)  establishing personnel accountability and audit
  procedures; and
               (9)  updating facility procedures at least annually as
  needed.
         (b)  The commission by rule shall require each electric
  cooperative, municipally owned utility, and transmission and
  distribution utility providing transmission or distribution
  service in the ERCOT power region to:
               (1)  prepare, submit to the commission, and update as
  necessary a plan for:
                     (A)  using the best practices and procedures to
  maintain service quality and reliability during a winter weather
  emergency; 
                     (B)  conducting regular preventative maintenance
  for freeze protection elements; 
                     (C)  inspecting freeze protection elements before
  and during the winter; 
                     (D)  testing and evaluating freeze protection
  elements after winter to identify potential improvements, required
  maintenance, and any necessary component replacement; and
                     (E)  making any needed repairs or improvements
  before the next winter; and
               (2)  implement the plan submitted under Subdivision
  (1).
         (c)  The commission shall regularly inspect facilities of
  electric cooperatives, municipally owned utilities, and
  transmission and distribution utilities providing transmission or
  distribution service in the ERCOT power region for compliance with
  rules adopted under this section.
         SECTION 3.  This Act takes effect September 1, 2021.