Bill Text: IL SB1938 | 2019-2020 | 101st General Assembly | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Authorizes the State, upon payment of $4,600, to release easements of access, crossing, light, air, and view from, to, and over described land in Bond County, subject to certain requirements. Effective immediately.
Spectrum: Partisan Bill (Democrat 2-0)
Status: (Passed) 2019-08-09 - Public Act . . . . . . . . . 101-0361 [SB1938 Detail]
Download: Illinois-2019-SB1938-Introduced.html
Bill Title: Authorizes the State, upon payment of $4,600, to release easements of access, crossing, light, air, and view from, to, and over described land in Bond County, subject to certain requirements. Effective immediately.
Spectrum: Partisan Bill (Democrat 2-0)
Status: (Passed) 2019-08-09 - Public Act . . . . . . . . . 101-0361 [SB1938 Detail]
Download: Illinois-2019-SB1938-Introduced.html
| ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
1 | AN ACT concerning property.
| |||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||
4 | Section 5. Upon the payment of the sum of $4,600 to the | |||||||||||||||
5 | State of Illinois, the People of the State of Illinois hereby | |||||||||||||||
6 | release any rights or easements of access, crossing, light, | |||||||||||||||
7 | air, and view from, to, and over the following described land | |||||||||||||||
8 | located in Bond County, Illinois, subject to permit | |||||||||||||||
9 | requirements of the State of Illinois, Department of | |||||||||||||||
10 | Transportation:
| |||||||||||||||
11 | Parcel No. 800XD61:
| |||||||||||||||
12 | A line in the Southwest Quarter of the Southwest Quarter of | |||||||||||||||
13 | Section 36, Township 6 North, Range 2 West of the Third | |||||||||||||||
14 | Principal Meridian in Bond County, Illinois, described as | |||||||||||||||
15 | follows: | |||||||||||||||
16 | Commencing the southwest corner of said Section 36; thence | |||||||||||||||
17 | on an assumed bearing of North 00 degrees 51 minutes 10 seconds | |||||||||||||||
18 | West on the west line of said Section 36, a distance of 546.94 | |||||||||||||||
19 | feet to the north right of way line of FAP Route 12 (US Route | |||||||||||||||
20 | 40) according to the Dedication of Right of Way for Public Road | |||||||||||||||
21 | Purposes to the State of Illinois recorded on July 1, 1941 in | |||||||||||||||
22 | Easement Record No. 3 on Page 494; thence North 89 degrees 31 |
| |||||||
| |||||||
1 | minutes 03 seconds east on said north right of way line, 250.01 | ||||||
2 | feet to the east line of the west 250 feet of said Southwest | ||||||
3 | Quarter of the Southwest Quarter and the Point of Beginning of | ||||||
4 | the Release of Access Control. | ||||||
5 | From said Point of Beginning; thence continuing North 89 | ||||||
6 | degrees 31 minutes 03 seconds East on said north right of way | ||||||
7 | line, 778.70 feet to the west line of the east 300 feet of said | ||||||
8 | Southwest Quarter of the Southwest Quarter and the Point of | ||||||
9 | Terminus of the Release of Access Control. | ||||||
10 | Said Parcel 800XD61 consists of a line that is 778.70 | ||||||
11 | linear feet, more or less.
| ||||||
12 | Section 10. The Department of Transportation shall obtain | ||||||
13 | a certified copy of this Act within 60 days after its effective | ||||||
14 | date and, upon receipt of the payment required by Section 5, | ||||||
15 | shall record the certified document in the Recorder's Office in | ||||||
16 | the county in which the land is located.
| ||||||
17 | Section 99. Effective date. This Act takes effect upon | ||||||
18 | becoming law.
|